Planned Roadworks
You'll find more information on planned roadworks on Scotland's trunk roads below. Alternatively you can view them on our map.
A78 NB Meadowhead Rbt to Eglinton IC - Road Closure
Location:A78 (Meadowhead Rbt to Shewalton Rd O/B) to A78 (Irvine Rd O/B to Railway Overbridge), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave Meadowhead and take 2nd exit onto A737- take 2nd exit at Three Staines rbt- at next rbt take 2nd exit- follow A737 to Merryvale rbt and take 2nd exit- at Fullarton rbt take 2nd exit- at Marress rbt take 2nd exit- at next junction take left turn onto A737 Kilwinning Road- at Redburn rbt take 2nd exit onto Eglington rbt- end
A898 NB Erskine Bridge - Lane Closures
Location:A898 (M898 to Start Of Cycle Way) to A898 (Start Of Bridge to End Of Bridge), Northbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Lane Closure.
A898 SB Erskine Bridge - Lane Closures
Location:A898 (A898 S/Bound to Start Of Bridge) to A898 (End Of Bridge to End Of Cycle Way), Southbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Lane Closure.
A1 - South of Haddington - Closure
Location:A1 (Beanston Underbridge to Overhailes Underpass) to A1 (Overhailes Underpass to Traprain Underbridg
Start time:20th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A1 southbound will be closed between Abbotsview Jct and Thistly Cross RBT with a signed diversion in place.
Road users are to follow the leave the A1 at Abbotsview junction, follow the A199 and rejoin the A1 at Thistly Cross Roundabout.
A1 - NB - Eyemouth - Temp lights
Location:A1 (Jct (R) Redhall to Jct Ayton (North)), Northbound
Start time:24th of July 2024, 7:30pm
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A1 - NB - North of Ayton - Temp lights
Location:A1 (Jct Ayton (North) to B6438 Reston), Northbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A1 - SB - Coldingham - Closure
Location:A1 (C130 Cockburnspath to Cockburnspath Rbt) to A1 (A1107 Junction to End Dual C/Way S/B), Southboun
Start time:7th of February 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
7th - 8th
The A1 will be closed in both directions south of Cockburnspath with a signed diversion in place between Berwick and the A720 City Bypass.
Road users are to follow the A6105 from Berwick to Greenlaw, then the A697 to Carfraemill Roundabout and the A68 to the A720.
10th - 13th
The A1 southbound will be closed at Tower Farm junction with a signed diversion in place between Tower Farm and Eyemouth Junctions. Road users are to follow the A1107 through Old Cambus, Coldingham and Eyemouth to rejoin the A1.
No access onto the A1 from A1107 Tower Farm Jct, traffic to follow main diversion.
A1 - SB - Eyemouth - Temp lights
Location:A1 (Jct (R) Redhall to Jct Ayton (North)), Southbound
Start time:24th of July 2024, 7:30pm
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A1 - SB - North of Ayton - Temp lights
Location:A1 (Jct Ayton (North) to B6438 Reston), Southbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A1 N/B Cockburnspath Roundabout. Temporary Traffic Lights.
Location:A1 (C130 Cockburnspath to Cockburnspath Rbt) to A1 (Cockburnspath Rbt to Dunglass Bridge), Northboun
Start time:5th of August 2024, 9:30am
Description:Works:
Kerbing Works
Traffic Management:
Portable Traffic Lights (TTLS).
A1 NB Old Craighall Off-slip.. Road Closure.
Location:A1 (Start Off Slip To A720 to Old Craighall) to A1 (Start Off Slip To A720 to Old Craighall Rbt), No
Start time:4th of July 2024, 10:00pm
Description:Works:
Carriageway Patching, Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A6094 Whitecraigs to Salters Junction. A68 NB to A720 Millerhill Junction – A720 EB to Old Craighall.
A1 NB Reston. Temporary Traffic Lights.
Location:A1 (B6438 Reston to Start Dual Cway Lemington), Northbound
Start time:4th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A1 NB Wallyford On-slip.. Road Closure.
Location:A1 (Salters Road Bridge to On Slip From A6094) to A1 (Salters Road Bridge to On Slip From A6094), No
Start time:4th of July 2024, 10:00pm
Description:Works:
Carriageway Patching, Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A6094 Whitecraigs to Salters Junction. A68 NB to A720 Millerhill Junction – A720 EB to Old Craighall.
A1 NB Wallyford to Old Craighall. Road Closure.
Location:A1 (Off Slip To A6094 to Salters Road Bridge) to A1 (Start Off Slip To A720 to Old Craighall), North
Start time:4th of July 2024, 10:00pm
Description:Works:
Carriageway Patching, Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A6094 Whitecraigs to Salters Junction. A68 NB to A720 Millerhill Junction – A720 EB to Old Craighall.
A1 S/B Cockburnspath Roundabout. Temporary Traffic Lights.
Location:A1 (Cockburnspath Rbt to Dunglass Bridge) to A1 (C130 Cockburnspath to Cockburnspath Rbt), Southboun
Start time:5th of August 2024, 9:30am
Description:Works:
Kerbing Works
Traffic Management:
Portable Traffic Lights (TTLS).
A1 SB Reston. Temporary Traffic Lights.
Location:A1 (B6438 Reston to Start Dual Cway Lemington), Southbound
Start time:4th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A68 - NB - Earlston - 24/7 TTL
Location:A68 (Craigsford Mains to A6105 Earlston), Northbound
Start time:1st of August 2024, 12:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A68 - SB - Earlston - 24/7 TTL
Location:A68 (Craigsford Mains to A6105 Earlston), Southbound
Start time:1st of August 2024, 12:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A68 NB Edgerston. Advance Signage.
Location:A68 (Junction Lethem to C31 Falside), Northbound
Start time:2nd of August 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A68 NB Lauder. Temporary Traffic Lights
Location:A68 (Harryburn to C85 Newmills), Northbound
Start time:15th of July 2024, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A68 North of Fala NB - TTL
Location:A68 (B6458 Saughland Rd to N End Of Hope Imp), Northbound
Start time:4th of July 2024, 7:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A68 North of Fala SB - TTL
Location:A68 (B6458 Saughland Rd to N End Of Hope Imp), Southbound
Start time:4th of July 2024, 7:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A68 Pathhead NB - TTL
Location:A68 (Whippielaw E F/Way to B6367 Preston Rd), Northbound
Start time:4th of July 2024, 7:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A68 Pathhead SB - TTL
Location:A68 (Whippielaw E F/Way to B6367 Preston Rd), Southbound
Start time:4th of July 2024, 7:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A68 SB Edgerston. Advance Signage.
Location:A68 (Junction Lethem to C31 Falside), Southbound
Start time:2nd of August 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A68 SB Lauder. Temporary Traffic Lights
Location:A68 (Harryburn to C85 Newmills), Southbound
Start time:15th of July 2024, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - NB - Wilton Hill - Temp lights
Location:A7 (Wilton Hill Terr to B6359 Appletreehall), Northbound
Start time:7th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - SB - Commercial Road Hawick - Closure
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt) to A7 (Sandbed Rbt to Sandbed Rbt), Southbound
Start time:3rd of February 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 Southbound will also be closed at Hawick with a signed diversion in place between Dovemount/ N Bridge Roundabout and Sandbed Roundabout. Road users are to follow Mart St and then B6399 to rejoin the A7 at Sandbed Roundabout. "
A7 - SB - Wilton Hill - Temp lights
Location:A7 (Wilton Hill Terr to B6359 Appletreehall), Southbound
Start time:7th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - SB - south of Hawick - closure
Location:A7 (Southfield to B711 Roberton), Southbound
Start time:29th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.
A7 NB Langholm. Temporary Traffic Lights
Location:A7 (Rhs Jct Langholm to B709 Jct), Northbound
Start time:15th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 SB Langholm. Temporary Traffic Lights
Location:A7 (Rhs Jct Langholm to B709 Jct), Southbound
Start time:15th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A701 Beattock IC Roundabout EB Convoy
Location:A701 (Start Beattock East Rbt to End Beattock East Rbt), Eastbound
Start time:28th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A701 Beattock IC Roundabout WB Convoy
Location:A701 (Start Beattock West Rbt to End Beattock West Rbt), Westbound
Start time:28th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A701 Broomlands to Beattock NB Road Closure
Location:A701 (Jct Tathhill to Jct Beattock) to A701 (B7076 Junction to Beattock West Rbt), Northbound
Start time:21st of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Southbound traffic will be diverted onto the A74(M) and travel south, leaving the A74(M) at junction 17 Lockerbie. Traffic will then turn left off the motorway slip onto the B7068. Traffic to proceed to the roundabout and take the 3rd exit onto the B7076. traffic will head south on the B7076 and take the B7076 slip onto the A709 where it will head east to the A75 at Dumfries
Northbound traffic as above in reverse
A701 Broomlands to Beattock SB Road Closure
Location:A701 (B7076 Junction to Beattock West Rbt), Southbound
Start time:21st of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Southbound traffic will be diverted onto the A74(M) and travel south, leaving the A74(M) at junction 17 Lockerbie. Traffic will then turn left off the motorway slip onto the B7068. Traffic to proceed to the roundabout and take the 3rd exit onto the B7076. traffic will head south on the B7076 and take the B7076 slip onto the A709 where it will head east to the A75 at Dumfries
Northbound traffic as above in reverse
A701 at Blackacre NB - TTL
Location:A701 (Jct Meikleholm to Jct Garrel), Northbound
Start time:17th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A701 at Blackacre SB - TTL
Location:A701 (Jct Meikleholm to Jct Garrel), Southbound
Start time:17th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A701/A74(M) Offslip - closure
Location:M74 (Moffat Exit to A701 Underbridge) to M74 (Start Nb Off Slip To Moffat to A701 Rbt), Northbound
Start time:28th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Northbound motorway traffic heading to Beattock will leave the A74(m) at junction 16 where it will leave the motorway take the 1st exit at the roundabout onto the B7076 and head north joining the A701 at Beattock
A701/A74(M) onslip NB - Slip closure
Location:M74 (A701 Rbt to End Nb On Slip From Moffat), Northbound
Start time:28th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic wishing to travel north from the A701 onto the A74(m) will be diverted to the A701 Moffat roundabout and take the 2nd exit onto the A74(m) southbound, traffic will travel south to junction 16 and leave the A74(m). Traffic will take the 2nd exit onto the B7076 at the first roundabout and the 2nd exit at the 2nd exit onto the A74(m) slip, traffic will then join the A74(m) northbound
A701/A74(M) slip road - closure
Location:M74 (Start Sb Off Slip To Moffat to A701 Moffat Rbt), Southbound
Start time:28th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will remain on A74(m) to junction 16 where it will leave the motorway take the 2nd exit at the roundabout onto the B7076 and head north joining the A701 at Beattock
A701/B7076 junction NB closure
Location:A701 (B7076 Junction to Beattock West Rbt) to A701 (Jct Beattock to B7076 Junction), Northbound
Start time:21st of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
A701/C105a junction NB closure
Location:A701 (Start Beattock West Rbt to End Beattock West Rbt), Northbound
Start time:28th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Beattock traffic wishing to join the A701 will be diverted through Beattock via the C105A to the A701 Junction at Marchbankwood
A702 - NB - Candymill - Temp Lights
Location:A702 (South Candybank to A721 Jct At Melbourne), Northbound
Start time:16th of July 2024, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Lane Closure (30mph)
A702 - NB - Candymill - Temp Lights
Location:A702 (South Candybank to A721 Jct At Melbourne), Northbound
Start time:6th of August 2024, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Lane Closure (30mph)
A702 - NB - Candymill - Temp lights
Location:A702 (South Candybank to A721 Jct At Melbourne), Northbound
Start time:5th of August 2024, 8:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - NB - Dolphinton - Closure
Location:A702 (A721 Jct At Melbourne to Meadowhead) to A702 (Meadowhead to Strathcl. Bound.), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Turn left onto Bush Loan Road
After 1.2 miles, take the 3rd exit onto A701
Follow A701 for 6.1 miles
Turn Right at Leadburn to continue on A701
After 9.3 miles continue onto A72 at Blyth Bridge
After 0.7 miles turn right onto A721
Rejoin A702 at Melbourne Crossroads
Journey Distance: 19.7 miles Journey Time: 32 mins
Additional Distance: 3.2 miles Additional Time:9 mins
Diversion Information:
Between Bush Loan Road and Melbourne Crossroads via A701, Leadburn, A701, A72, A721
DIVERSION JOURNEY BETWEEN MELBOURNE CROSSROADS AND BUSH LOAN ROAD.
TOTAL DIVERSION JOURNEY TIME: 32 MINUTES / 19.7 MILES
ADDITIONAL JOURNEY TIME: 9 MINUTES / 3.2 MILES
Access for Emergency vehicles to be maintained and Local Access allowed.
A702 - NB - Dolphinton - Closure
Location:A702 (A721 Jct At Melbourne to Meadowhead) to A702 (Meadowhead to Strathcl. Bound.), Northbound
Start time:15th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A702 DIVERSION ROUTE NORTHBOUND
Turn right at Melbourne Crossroads onto A721
After 2.2 miles turn left onto A72
After 0.7 miles, continue left onto A701 at Blyth Bridge
After 9.3 miles turn left at Leadburn to continue on A701
Follow A701 for 6.1 miles
Take the first exit at the roundabout onto Bush Loan Road
Rejoin the A702 after 1.2 miles
Journey Distance: 19.7 miles Journey Time: 32 mins
Additional Distance: 3.2 miles Additional Time:9 mins
Diversion Information:
Between Melbourne Crossroads and Bush Loan Road via A721, A72, A701, Leadburn, A701
A702 - NB - West Water Bridge, South of West Linton. Full Road Closure
Location:A702 (Strathcl. Bound. to Golf Course Road), Northbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Melbourne Crossroads >Mirkdean > Blyth Bridge > A701 > Penicuik > A701 > A703 > Lothianburn JNC
A702 - SB - Candymill - Temp Lights
Location:A702 (South Candybank to A721 Jct At Melbourne), Southbound
Start time:16th of July 2024, 12:30pm
Description:Works:
Ecological Survey
Traffic Management:
Lane Closure (30mph)
A702 - SB - Candymill - Temp Lights
Location:A702 (South Candybank to A721 Jct At Melbourne), Southbound
Start time:6th of August 2024, 12:30pm
Description:Works:
Ecological Survey
Traffic Management:
Lane Closure (30mph)
A702 - SB - Candymill - Temp lights
Location:A702 (South Candybank to A721 Jct At Melbourne), Southbound
Start time:5th of August 2024, 8:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - SB - Dolphinton - Closure
Location:A702 (Meadowhead to Strathcl. Bound.) to A702 (A721 Jct At Melbourne to Meadowhead), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A702 DIVERSION ROUTE SOUTHBOUND
Turn left onto Bush Loan Road
After 1.2 miles, take the 3rd exit onto A701
Follow A701 for 6.1 miles
Turn Right at Leadburn to continue on A701
After 9.3 miles continue onto A72 at Blyth Bridge
After 0.7 miles turn right onto A721
Rejoin A702 at Melbourne Crossroads
Journey Distance: 19.7 miles Journey Time: 32 mins
Additional Distance: 3.2 miles Additional Time:9 mins
Diversion Information:
Between Bush Loan Road and Melbourne Crossroads via A701, Leadburn, A701, A72, A721
DIVERSION JOURNEY BETWEEN MELBOURNE CROSSROADS AND BUSH LOAN ROAD.
TOTAL DIVERSION JOURNEY TIME: 32 MINUTES / 19.7 MILES
ADDITIONAL JOURNEY TIME: 9 MINUTES / 3.2 MILES
Access for Emergency vehicles to be maintained and Local Access allowed.
A702 - SB - Dolphinton - Closure
Location:A702 (Meadowhead to Strathcl. Bound.) to A702 (A721 Jct At Melbourne to Meadowhead), Southbound
Start time:15th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A702 DIVERSION ROUTE SOUTHBOUND
Turn left onto Bush Loan Road
After 1.2 miles, take the 3rd exit onto A701
Follow A701 for 6.1 miles
Turn Right at Leadburn to continue on A701
After 9.3 miles continue onto A72 at Blyth Bridge
After 0.7 miles turn right onto A721
Rejoin A702 at Melbourne Crossroads
Journey Distance: 19.7 miles Journey Time: 32 mins
Additional Distance: 3.2 miles Additional Time:9 mins
Diversion Information:
Between Bush Loan Road and Melbourne Crossroads via A701, Leadburn, A701, A72, A721
DIVERSION JOURNEY BETWEEN MELBOURNE CROSSROADS AND BUSH LOAN ROAD.
TOTAL DIVERSION JOURNEY TIME: 32 MINUTES / 19.7 MILES
ADDITIONAL JOURNEY TIME: 9 MINUTES / 3.2 MILES
Access for Emergency vehicles to be maintained and Local Access allowed.
A702 - SB - Westwater Bridge, South of West Linton. Full Road Closure
Location:A702 (Strathcl. Bound. to Golf Course Road), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Lothianburn JNC > A703 > A701 > Penicuik >A701 > Blyth Bridge > Mirkdean > Melbourne Crossroads
A702 Coulter NB - TTL
Location:A702 (Jct Overburns to Coulter), Northbound
Start time:3rd of July 2024, 7:00am
Description:Works:
Kerbing Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 Coulter SB - TTL
Location:A702 (Jct Overburns to Coulter), Southbound
Start time:3rd of July 2024, 7:00am
Description:Works:
Kerbing Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 N/B West Linton. Temporary Traffic Lights
Location:A702 (Robins Land Roundabout to 30 Mph's West Linton), Northbound
Start time:8th of July 2024, 6:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 N/B West Linton. Temporary Traffic Lights
Location:A702 (Strathcl. Bound. to Golf Course Road), Northbound
Start time:8th of July 2024, 6:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 NB 1 Mile South of Hillend. Temporary Traffic
Location:A702 (C40 Bushloan Road to A703 Peebles Road), Northbound
Start time:4th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 NB Dolphinton. Temporary Traffic Lights.
Location:A702 (Meadowhead to Strathcl. Bound.), Northbound
Start time:29th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 NB Easter Howgate. Road Closure.
Location:A702 (U71 Glencorse Kirk Rd to C40 Bushloan Road), Northbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A702 Northbound Traffic:
Turn Right onto A766
Travel through Penicuik onto the A701
Take the first exit at Gowkley Moss Roundabout onto Bush Loan Road
Rejoin the A702 at Easter Howgate
Diversion Length - 7.4 miles
Diversion Duration - 14 minutes
Addition Journey Length - 1.8 miles (compared to usual route)
Additional Journey Time - 7 minutes (compared to usual route)
A702 S/B West Linton. Temporary Traffic Lights
Location:A702 (Robins Land Roundabout to 30 Mph's West Linton), Southbound
Start time:8th of July 2024, 6:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 S/B West Linton. Temporary Traffic Lights
Location:A702 (Strathcl. Bound. to Golf Course Road), Southbound
Start time:8th of July 2024, 6:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 SB 1 Mile South of Hillend. Temporary Traffic
Location:A702 (C40 Bushloan Road to A703 Peebles Road), Southbound
Start time:4th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 SB Dolphinton. Temporary Traffic Lights.
Location:A702 (Meadowhead to Strathcl. Bound.), Southbound
Start time:29th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 SB Easter Howgate. Road Closure.
Location:A702 (U71 Glencorse Kirk Rd to C40 Bushloan Road), Southbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A702 Southbound Traffic:
Turn left onto Bush Loan Road
Take the 3rd exit at Gowkley Moss Roundabout on to the A701
Travel south Through Penicuik onto the A766
Rejoin the A702 at Nine Mile Burn
Diversion Length - 7.4 miles
Diversion Duration - 14 minutes
Addition Journey Length - 1.8 miles (compared to usual route)
Additional Journey Time - 7 minutes (compared to usual route)
A702 Wandel NB - TTL
Location:A702 (Maidencots Rbt to Br Over Wandel Burn), Northbound
Start time:3rd of July 2024, 7:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A702 Wandel SB - TTL
Location:A702 (Maidencots Rbt to Br Over Wandel Burn), Southbound
Start time:3rd of July 2024, 7:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A71 Warrix I/C North OB - Total Closure
Location:A78 (A71 Warrix Rbt to Entry Slip) to A78 (Start Of 2-Lane to A71 Rbt & A71 Eb), Southbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
Turn West onto A71 at Rbt 2nd exit, at Aniick RBT 2nd Exit onto B7081 Annick Road at Roundabout 3rd Exit onto B7080 Long Drive, Diversion ends.
A71 Warrix I/C South OB - Total Closure
Location:A78 (A71 Warrix Rbt to Entry Slip To A78) to A78 (Off Slip To A71 to A71 Warrix Rbt), Northbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Route as Follows:
Traffic diverted East on A71, first left to RBT with Long Drive, 1st Exit at Rbt onto B7080 Long Drive, keep left onto B7081 Annick Road, 1st exit at RBT Diversion ends.
A720 Sheriffhall to Old Craighall EB - Lane Closure
Location:A1 (Old Craighall to End On Slip From A720) to A1 (Salters Road Bridge to On Slip From A6094), Eastb
Start time:6th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A721 Eastbound Progressive lane closures
Location:M74 (Start On-Slip to End Of Entry Slip) to M73 (Off Slip To M74 Sb to End Of Broken Laneline), East
Start time:9th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A721 Southbound on-slip to M74 Southbound - Total closure
Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou
Start time:4th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A721, M74 NB Jct 3A On-slip, M74 NB, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip
A721 Southbound to M74 Southbound on-slip - Total closure
Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb), Southbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 NB Jct 3A On-slip, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip
A721 Westbound Progressive lane closures
Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M74 (Start On-Slip to End Of Entry Slip), Westbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A723 WB Motherwell Road - HS Closure
Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton), W
Start time:24th of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
A725 Bellziehill North Roundabout - total closure
Location:A725 (Bellziehill Rbt to On Slip From Bellziehill (Eb)) to A725 (Slip To Bellziehill to Bellziehill
Start time:15th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A725 Northbound Bellziehill on-slip, A725 Northbound Diamond off-slip, A725 Southbound on-slip, A725 Bellziehill off-slip
A725 NB C154 Stoneymeadow Rd onslip to A725 - Road closure
Location:A725 (Whirlies Rbt to Whirlies Bypass), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow Stoneymeadow Road- join A725 south- at Mavor rbt circle rbt and join A725 north- end
A725 NB Craighead off slip - Slip closure
Location:A725 (Off Slip To Craighead to On Slip From Craighead) to A725 (Off Slip To Craighead to End Island)
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A|725 North- circle Raith rbt and head A725 South- leave A725 at Whistlebrae Road- end
A725 NB Craighead on slip - Slip closure
Location:A725 (End Island to On Slip From Craighead) to A725 (Off Slip To Craighead to On Slip From Craighead
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue onto Whistlebrae Rd- at jct take right turn- at rbt take 2nd exit onto A725 south- at Maver rbt circle and rejoin A725 north- end
A725 NB Douglas Street on slip - Slip closure
Location:A725 (B7012 Jct to B7012 T Junction) to A725 (Eb Off Slip to B7012 On Slip), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue Douglas St- at rbt take 2nd exit onto A725 south- at Maver rbt cirlce rbt and join A725 north- end
A725 NB Douglas st off slip - Slip closure
Location:A725 (Eb Off Slip to B7012 Jct) to A725 (B7012 Jct to B7012 T Junction), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A725 North to Raith rbt circle Raith rbt and join A725 north- follow A725 leaving at Douglas St rbt- take 2nd exit onto B7012 Douglas St- end
A725 NB E Kilbride Expy Whirlies to Mavor merge - Road closure
Location:A725 (Whirlies Rbt to Whirlies Bypass), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue A749 kingsway- join A725 at Maver rbt
A725 NB Glasgow Rd on slip - Slip closure
Location:A725 (Start Slip To A725 to End Slip) to A725 (Main St On Slip to Glasgow Rd On Slip), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow A724 to rbt- at rbt 4th exit onto A725 south- at Mavour rbt circle and rejoin A725 North- end
A725 NB Hamilton rd off slip - Slip closure
Location:A725 (Crossbaskets Off Slip to Blantyre Slip) to A725 (Eb Off Slip to Crossbaskets Jct), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A725 north to Raith rb circle Raith rbt and join A725 north- follow A725 leaving at Douglas St rbt- take 2nd exit onto B7012 Hamilton Rd- end
A725 NB Main St off slip - Slip closure
Location:A725 (Start Off Slip To Main St to Main St Rbt), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A725 north to Raith rbt circle Raith rbt and join A725 north- follow A725 leaving at Main Street rbt- end
A725 NB Main St on slip - Slip closure
Location:A725 (Main Street Rbt to Slip To A725), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue Main st rbt and take 2nd exit onto A725 south- at Maver rbt circle and rejoin A725 north- end
A725 NB Mavor to Whirlies merge -Lane closure
Location:A725 (A749 Rbt to Entry Slip Calderwood), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A725 NB Whirlies merge to Bothwell bridge - Lane closure
Location:A725 (Whirlies Bypass to Hamilton Rd Off Slip) to A725 (Craigend to M8 Ppp Boundary), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A725 Northbound Bellziehill on-slip - Total closure
Location:A725 (Bellziehill Rbt to On Slip From Bellziehill (Eb)) to A725 (Benziehill Int Off-Slip to Diamond
Start time:23rd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A721 Gartcosh Walk, B7070 North Road
A725 Northbound Bellziehill to Shawhead main line - total closure
Location:A725 (Orbiston Int On Slip to Off Slip Bellziehill) to A725 (Start 2 Lane to Diamond Int. O/B), Nort
Start time:23rd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A725 Bellziehill roundabout, A721 Gartcosh Walk, B7070 North Road
A725 Northbound Main line Raith to Bellziehill - Total closure
Location:A725 (Whistleberry Toll Rbt to Whistleberry Toll Rbt) to A725 (Benziehill Int Off-Slip to Diamond In
Start time:22nd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Non-Motorway : A725 to A7071, Bellshill Bypass, Hamilton Road, Main Street, Uddingston Road, Bothwell Road, Main Street, Glasgow road, Old Edinburgh Road, Aitkenhead Road, A8 Eastbound Showcase on-slip, A8 Eastbound.
Motorway: M74 Junction 5 on-slip Northbound, M73 Northbound to M73 northbound, M73 Northbound Junction 2 off-slip, Baillieston Rbt, Swinton Rbt, Bargeddie Rbt, A8 Eastbound
A725 Northbound Orbiston on-slip - Total clousre
Location:A725 (Start Of Slip to Jct Orbiston Rbt) to A725 (Derest Doune Nth to On Slip), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Hamilton Road, Crossgates, A721 Motherwell Road, A721, A723, Main Street, Holytown Road, A775, B7070, North Road.
A725 Northbound Raith Underpass - Progressive lane closures
Location:A725 (Raith Rbt to Whistleberry Toll Rbt) to A725 (Raith Rbt to Off Slip Orbiston Int), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A725 Northbound Raith on-slip - Total closure
Location:A725 (Raith Rbt to Raith Rbt) to A725 (Raith Rbt to Off Slip Orbiston Int), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Non- Motorway :A725 to A7071, Bellshill Bypass, Hamilton Road, Main Street, Uddingston Road, Bothwell Road, Main Street, Glasgow road, Old Edinburgh Road, Aitkenhead Road, A8 Eastbound Showcase on-slip, A8 Eastbound.
Motorway: M74 Junction 5 on-slip Northbound, M73 Northbound to M73 northbound, M73 Northbound Junction 2 off-slip, Baillieston Rbt, Swinton Rbt, Bargeddie Rbt, A8 Eastbound
A725 SB East Kilbride Expressway @ Whirlies off slip - Slip Closure
Location:A725 (Crossbaskets Jct to Whirlies Bypass) to A725 (Whirlies Rbt to Whirlies Rbt), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A725 to Mavor Rbt - take 1st exit onto Kingsway- end
A725 SB Douglas Street off slip - Slip Closure
Location:A725 (Wb Off Slip to Eb On Slip) to A725 (Wb Off Slip to Newhouse Rbt), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A725 South to Maver Rbt- circle rbt and rejoin A725 North- leave A725 at Douglas St- end
A725 SB Douglas Street on slip - Slip Closure
Location:A725 (Lhs Jct Newhouse to End Wb On Slip), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on Douglas St- join A725 North- at Raith rbt circle and rejoin |A725 South- end
A725 SB Glasgow Rd on slip - Slip Closure
Location:A725 (A724 Rbt to Wb A725 On Slip), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A724- join A725 North- circle Raith Rbt and take exit for A725 South- end
A725 SB Kingsway Whirlies to Whitemoss Lane Closures
Location:A725 (Whirlies Rbt to Whitemoss Rbt), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A725 SB Main Street off slip - Slip Closure
Location:A725 (Off Slip To Main St to Main Street Rbt), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A725 South to Maver Rbt- circle Maver Rbt and continue A725 North- leave A725 at Main St off slip- end
A725 SB Main Street on slip - Slip Closure
Location:A725 (Main Street Rbt to Start On Slip), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on B7012- join A725 n/b- circle Raith rbt and rejoin A725 South- end
A725 SB Whirlies Bypass to Whim Place on slip - Lane Closure
Location:A725 (Crossbaskets Jct to Whirlies Bypass) to A725 (Entry Slip Calderwood to A749 Rbt), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A725 SB Whistleberry Rd off slip - Slip Closure
Location:A725 (Off Slip Whitehill to Wb Slip On From A724) to A725 (Wb Off Slip to Whistleberry Rd), Southbou
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A725 South to Maver Rbt - circle rbt and head on A725 North - leave A725 at Craighead off slip- follow rd to Whistleberry Rd- end
A725 SB Whistleberry to Whirlies slip - Lane Closure
Location:A725 (M8 Ppp Boundary to Whistleberry Road Slip) to A725 (Crossbaskets Jct to Whirlies Bypass), Sout
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A725 Southbound Bellziehill on-slip - Total closure
Location:A725 (Bellziehill Rbt to On Slip Ftom Bellziehill), Southbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Bellziehill Rbt, A721 New Edinburgh Road, A74, A721 to M74 southbound.
A725 Southbound Bellziehill to Raith Main line - Total closure
Location:A725 (Diamond Int. Ob to Benziehill Int On-Slip) to A725 (Whistleberry Rbt to M8 Ppp Boundary), Sout
Start time:25th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Bellziehill Rbt, A721 New Edinburgh Road, A74, A721 to M74 southbound.
A725 Southbound Diamond on-slip - Total closure
Location:A725 (Diamond Int Crossrds to Wb On Slip) to A725 (Diamond Int. Ob to Benziehill Int On-Slip), South
Start time:24th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Belgrave street, A721 Gartcosh Walk, A725 Bellziehill roundabout, A725 Southbound Bellziehill on-slip.
A725 Southbound Orbiston on-slip - Total closure
Location:A725 (Orbiston Rbt to Wb On Slip) to A725 (Wb Off Slip Orbiston Int to Wb On Slip), Southbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A725 Northbound Orbiston on-slip, A725 Northbound Bellziehill off-slip, Bellziehill Rbt, A721 New Edinburgh Road, A74, A721 to M74 southbound.
A725 Southbound Raith Underpass - Progressive lane closures
Location:A725 (Raith Rbt to Off Slip Orbiston Int) to A725 (Raith Rbt to Whistleberry Toll Rbt), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A725 Southbound Shawhead to Bellziehill - Total closure
Location:A725 (Start 2 Lane to Diamond Int. O/B) to A725 (Diamond Int. Ob to Benziehill Int On-Slip), Southbo
Start time:24th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A725 Southbound, B7070 North Road, A721 Gartcosh Walk.
A725 Southbound between Diamond off & on-slips - Nearside lane closure
Location:A725 (Start 2 Lane to Diamond Int. O/B) to A725 (Diamond Int Crossrds to Wb On Slip), Southbound
Start time:7th of July 2024, 6:00am
Description:Works:
Trial hole investigation
Traffic Management:
Lane Closure.
A725 Strathclyde Buisness Park on-slip - Total closure
Location:A725 (Diamond Int Crossrds to Eb On Slip Diamond Int) to A725 (Exit Slip Nosing to End Of Dual), Nor
Start time:23rd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Phoenix Crescent, James Street, Belgrave Street, A721 Gartcosh Walk, B7070 North Road.
A725 Strathclyde Business Park - 4 way traffic lights
Location:A725 (Off Slip to Phonenix Crescent), Northbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A726 EB Queensway Lane Closure
Location:A726 (Slip On Phillipshill Interchange to West Mains Roundabout) to A726 (Murray Rbt to Birniehill R
Start time:7th of July 2024, 8:00am
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A726 GSO - Holehouse to Humbie road WB nearside closure
Location:A726 (Redwood Drive Underbridge to Glasgow Road Roundabout) to A726 (B767 Glasgow Road Rbt to Mearns
Start time:3rd of July 2024, 10:00am
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A726 GSO - Humbie road to Maidenhill WB nearside closure
Location:A726 (B767 Glasgow Road Rbt to Mearns Road Overbridge) to A726 (Mearns Road Overbridge to Maidenhill
Start time:4th of July 2024, 10:00am
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A726 WB Queensway Lane Closure
Location:A726 (Birniehill Rbt to Murray Rbt) to A726 (West Mains Roundabout to Slip Off Phillipshill Intercha
Start time:7th of July 2024, 8:00am
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A737 NB Bypass Road South Geilsland RD Jct - Beith Nth Gateway - Progressive TTL's
Location:A737 (B777 Jct to B706 Jct) to A737 (Ayrshire Boundry to Beith 30mph Sign), Northbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A737 SB Bypass Road Nth Gateway - Just Sth of Geilsland rd Jct Progressive TTL's
Location:A737 (Ayrshire Boundry to Beith 30mph Sign) to A737 (B777 Jct to B706 Jct), Southbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A737 South of Dalgarven NB - TTLS
Location:A737 (Cockenzie Jct to Kilwinning 30mph Sign), Northbound
Start time:22nd of July 2024, 7:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A737 South of Dalgarven SB - TTLS
Location:A737 (Cockenzie Jct to Kilwinning 30mph Sign), Southbound
Start time:22nd of July 2024, 7:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A738 @ Stevenston Rd NB - TTLS
Location:A738 (Pennyburn Rd Jct to Whitehouse Park Rd Jct), Northbound
Start time:19th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A738 @ Stevenston Rd SB - TTLS
Location:A738 (Pennyburn Rd Jct to Whitehouse Park Rd Jct), Northbound
Start time:19th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 @ Cairnsmore Rd - Palnure EB - TTL
Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound
Start time:1st of August 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 @ Cairnsmore Rd - Palnure WB- TTL
Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Westbound
Start time:1st of August 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 @ Valleyfield WB- TTL
Location:A75 (A762 Tongland to Twynholm Jct), Westbound
Start time:15th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Castle Douglas Bypass EB - TTLS
Location:A75 (Allanton Rbt to A713 Slip Rd), Eastbound
Start time:4th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Castle Douglas Bypass WB - TTLS
Location:A75 (Allanton Rbt to A713 Slip Rd), Westbound
Start time:4th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Dumfries - Signage for Dumfries Agricultural Show
Location:A75 (New Cargenbridge Rbt to New Cargenbridge Rbt) to A75 (Dancingknowe Rbt to Dancingknowe Rbt), Ea
Start time:2nd of August 2024, 12:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A75 Dunragit Bypass to Planting End EB TTL's
Location:A75 (Start Of 3-Lane to Junction Old School) to A75 (Station Rd to Old Military Rd), Eastbound
Start time:8th of July 2024, 6:00am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Dunragit Bypass to Planting End WB TTL's
Location:A75 (Station Rd to Old Military Rd) to A75 (Start Of 3-Lane to Junction Old School), Westbound
Start time:8th of July 2024, 6:00am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A75 EB at Crocketford - TTLS
Location:A75 (Jct Brandedleys to Jct Lairdlaugh), Eastbound
Start time:19th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 EB at Spittal - TTLS
Location:A75 (Pulwhat Br to Jct Muirfad Fm), Eastbound
Start time:23rd of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 East of Three Lochs
Location:A75 (B735 Jct to Jct Dirnow), Southbound
Start time:15th of July 2024, 9:30am
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A75 East of Three Lochs
Location:A75 (B735 Jct to Jct Dirnow), Northbound
Start time:15th of July 2024, 9:30am
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A75 NB East of Gravel Pit Glenluce - TTLS
Location:A75 (End Of Dual Section to End Of Lay-By), Northbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A75 NB at Springholm - Route Part of a Diversion
Location:A75 (Jct Garmartin to B794 Jct) to A75 (Jct Lairdlaugh to Auchenreoch Br), Northbound
Start time:18th of July 2024, 7:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A75 Palnure EB - TTL
Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound
Start time:11th of July 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Palnure WB- TTL
Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Westbound
Start time:11th of July 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Planting End to Castle Kennedy EB Total Closure
Location:A75 (Jct Old School to Jct Inch Church) to A75 (Start Of 3-Lane to Junction Old School), Eastbound
Start time:8th of July 2024, 9:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
leaves the A75 onto the B7084 and continue to junction with B7077, follow right fork ont,o B7077 continue on B7077 to A716 junction turn right and follow A716 to link with A77(non trunk section) continue on A77(Non Trunk) to Stoneykirk Rd Stranraer, take right onto C54 Commerce Rd continuing to London Rd to join A75.
A75 Planting End to Castle Kennedy WB Total Closure
Location:A75 (Start Of 3-Lane to Junction Old School) to A75 (Jct Old School to Jct Inch Church), Westbound
Start time:8th of July 2024, 9:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
leaves the A75 onto the B7084 and continue to junction with B7077, follow right fork ont,o B7077 continue on B7077 to A716 junction turn right and follow A716 to link with A77(non trunk section) continue on A77(Non Trunk) to Stoneykirk Rd Stranraer, take right onto C54 Commerce Rd continuing to London Rd to join A75.
A75 SB East of Gravel Pit Glenluce - TTLS
Location:A75 (End Of Dual Section to End Of Lay-By), Southbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A75 SB at Springholm - Route Part of a Diversion
Location:A75 (Jct Lairdlaugh to Auchenreoch Br) to A75 (Jct Garmartin to B794 Jct), Southbound
Start time:18th of July 2024, 7:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A75 Springholm East- TTL
Location:A75 (Jct Lairdlaugh to Auchenreoch Br), Eastbound
Start time:9th of July 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm East- TTL
Location:A75 (Jct Lairdlaugh to Auchenreoch Br), Eastbound
Start time:30th of July 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm NB - TTLs
Location:A75 (Jct Lairdlaugh to Auchenreoch Br), Northbound
Start time:19th of August 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm Park EB - TTL
Location:A75 (Auchenreoch Br to Jct Garmartin), Eastbound
Start time:16th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm Park WB - TTL
Location:A75 (Auchenreoch Br to Jct Garmartin), Westbound
Start time:16th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm SB - TTLs
Location:A75 (Jct Lairdlaugh to Auchenreoch Br), Southbound
Start time:19th of August 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm West- TTL
Location:A75 (Jct Lairdlaugh to Auchenreoch Br), Westbound
Start time:9th of July 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Springholm West- TTL
Location:A75 (Jct Lairdlaugh to Auchenreoch Br), Westbound
Start time:30th of July 2024, 9:30am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A75 WB at Crocketford - TTLS
Location:A75 (Jct Brandedleys to Jct Lairdlaugh), Westbound
Start time:19th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 WB at Spittal - TTLS
Location:A75 (Pulwhat Br to Jct Muirfad Fm), Westbound
Start time:23rd of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Barlae EB- TTL
Location:A75 (Muil Farm Jct to Start Dual), Eastbound
Start time:15th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Barlae WB- TTL
Location:A75 (Muil Farm Jct to Start Dual), Westbound
Start time:15th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Cargenbridge Rbt EB - TTL
Location:A75 (Cargenbridge Rbt to Garroch Loaning Rbt) to A75 (Glasgow Rd Rbt A76 to New Cargenbridge Rbt), E
Start time:18th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Cargenbridge Rbt WB - TTL
Location:A75 (Glasgow Rd Rbt A76 to New Cargenbridge Rbt) to A75 (Cargenbridge Rbt to Garroch Loaning Rbt), W
Start time:18th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Hermitage EB - TTLS
Location:A75 (Jct Garmartin to B794 Jct) to A75 (Auchenreoch Br to Jct Garmartin), Eastbound
Start time:5th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Hermitage WB - TTLS
Location:A75 (Auchenreoch Br to Jct Garmartin) to A75 (Jct Garmartin to B794 Jct), Westbound
Start time:5th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 at Valleyfield EB - TTL
Location:A75 (A762 Tongland to Twynholm Jct), Eastbound
Start time:15th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 before Castle Douglas at Carlingware lane canal WB - TTL
Location:A75 (A713 Slip Rd to Hightae Rbt), Westbound
Start time:16th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A75 before Castle Douglas at Carlingware lane canal EB- TTL
Location:A75 (A713 Slip Rd to Hightae Rbt), Eastbound
Start time:16th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Ardoch NB - TTLS
Location:A76 (Jct Thrushlands to Parking Area) to A76 (Jct (L) To Glengenny to South End Of Glenairlie 3-Lane
Start time:10th of July 2024, 9:00am
Description:Works:
Inspections, Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Ardoch SB-TTLS
Location:A76 (Jct (L) To Glengenny to South End Of Glenairlie 3-Lane) to A76 (Jct Thrushlands to Parking Area
Start time:10th of July 2024, 9:00am
Description:Works:
Inspections, Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Crossroads NB - TTLs
Location:A76 (Cessnock Water Bridge to Crossroads Roundabout), Northbound
Start time:8th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Crossroads SB - TTLs
Location:A76 (Crossroads Roundabout to Bowhouse Roundabout) to A76 (Cessnock Water Bridge to Crossroads Round
Start time:8th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Dettingen Rbt to New Cumnock Rbt - Road Part of a Diversion
Location:A76 (Dettingen Rbt to Dettingen Rbt) to A76 (B741 Mossmark Jct to Polqueys Rd Jct), Southbound
Start time:3rd of August 2024, 8:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 Dettingen Rbt to New Cumnock Rbt - Road Part of a Diversion
Location:A76 (72m S Of Cairnhill Pl to B741 Mossmark Jct) to A76 (Dettingen Rbt to Dettingen Rbt), Northbound
Start time:3rd of August 2024, 8:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 EB between Bellfield Interchange & HMP Kilmarnock - Route Part of Diversion
Location:A76 (Bellfield Rbt to Start Approach) to A76 (Bowhouse Roundabout to Bowhouse Roundabout), Eastbound
Start time:29th of July 2024, 9:30am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 Earl Grey Street Mauchline NB - Works Entirely on the Footway
Location:A76 (B743 Mansefield Rd to B743 Loudon St), Northbound
Start time:18th of July 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Works Entirely on Footway.
A76 From Auldgirth to Holywood B729 SB - Progressive TTLS
Location:A76 (Jct Dalswinton to End Layby) to A76 (Jct (L) Newton Rd to Jct Newbridge), Southbound
Start time:10th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Garleffan Roundabout NB - TTLs
Location:A76 (Skerrington Rbt to Dettingen Rbt) to A76 (Whitelaysyke Bridge Rbt to End Of 3-Lane), Northbound
Start time:29th of July 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Garleffan Roundabout SB - TTLs
Location:A76 (Dettingen Rbt to Templeton Rbt) to A76 (Skerrington Rbt to Dettingen Rbt), Southbound
Start time:29th of July 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 Hurlford to New Cumnock - Embargo
Location:A76 (Bowhouse Roundabout to Start Approach To Hulford Int) to A76 (B741 Mossmark Jct to Polqueys Rd
Start time:4th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 NB - South of Sanquhar TTLS
Location:A76 (Jct To Manse to Access At Gateside), Southbound
Start time:25th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 NB Barburgh Mill Blackwood - TTLS
Location:A76 (Jct Dalswinton to End Layby) to A76 (End Layby to Jct Stepends), Northbound
Start time:24th of July 2024, 9:00am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A76 NB Between Mauchline & Cumnock - Route Part of Diversion
Location:A76 (B743 Mansefield Rd to B743 Loudon St) to A76 (Dettingen Rbt to Dettingen Rbt), Southbound
Start time:1st of August 2024, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 NB Between Mauchline & Cumnock - Route Part of Diversion
Location:A76 (Dettingen Rbt to Dettingen Rbt) to A76 (B743 Mansefield Rd to B743 Loudon St), Northbound
Start time:1st of August 2024, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 Ochiltree Cumnock NB Closure
Location:A76 (Skerrington Rbt to Dettingen Rbt), Northbound
Start time:1st of August 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Northbound traffic will leave the A76 at Skerrington rbt onto the B7083, travel through Cumnock and join the A70 rejoining the A76 at Dettingen rbt
Southbound traffic in reverse
A76 Ochiltree SB Cumnock Closure
Location:A76 (Skerrington Rbt to Dettingen Rbt), Southbound
Start time:1st of August 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Northbound traffic will leave the A76 at Skerrington rbt onto the B7083, travel through Cumnock and join the A70 rejoining the A76 at Dettingen rbt
Southb ound traffic in reverse
A76 SB - North of Sanquhar TTLS
Location:A76 (Jct To Manse to Access At Gateside), Southbound
Start time:25th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 SB Barburgh Mill Blackwood - TTLS
Location:A76 (End Layby to Jct Stepends) to A76 (Jct Dalswinton to End Layby), Southbound
Start time:24th of July 2024, 9:00am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A76 South of Crosshands @ Bargower SB - TTL
Location:A76 (Jct Craighead to Cessnock Water Br) to A76 (B744 Crosshands to Jct Craighead), Southbound
Start time:9th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A76 South of Crosshands @ Bargower NB - TTL
Location:A76 (B744 Crosshands to Jct Craighead) to A76 (Jct Craighead to Cessnock Water Br), Northbound
Start time:9th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A76 WB between Bellfield Interchange & HMP Kilmarnock - Route Part of Diversion
Location:A76 (Bowhouse Roundabout to Bowhouse Roundabout) to A77 (Hurlford Int Rbt to Hurlford Int Rbt), West
Start time:29th of July 2024, 9:30am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A76 from Holywood B729 to Auldgirth NB - Progressive TTLS
Location:A76 (Jct (L) Newton Rd to Jct Newbridge) to A76 (Jct Dalswinton to End Layby), Northbound
Start time:10th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A76 from Kirkconnel to Ayrshire Boundary NB - TTL
Location:A76 (Access At Gateside to Jct To Kelloholm) to A76 (Jct Glen Hall to E. Ayrshire Bdy), Northbound
Start time:10th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A76 from Kirkconnel to Ayrshire Boundary SB - TTLS
Location:A76 (Jct Glen Hall to E. Ayrshire Bdy) to A76 (Access At Gateside to Jct To Kelloholm), Southbound
Start time:10th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77 @ St Chapel Donan Girvan NB - TTLS
Location:A77 (Bridgemill Rbt to Dipple,Factory Ent), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77 @ St Chapel Donan Girvan SB - TTLS
Location:A77 (Bridgemill Rbt to Dipple,Factory Ent), Northbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Bellfield Interchange to Monkton - Planned Event Embargo
Location:A77 (Off Slip To A76/A71 to Sb On Slip) to A77 (Symington Sb to Dutch Hse Rbt), Southbound
Start time:12th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A77 Bellfield Interchange to Monkton - Planned Event Embargo
Location:A77 (Dutch Hse Rbt to Dutch Hse Rbt) to A77 (Nb Slip Road Exit to On Slip From A76/A71), Northbound
Start time:12th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A77 Bellfield north- Lane closure
Location:A77 (Nb Slip Road Exit to On Slip From A76/A71), Northbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A77 Bellfield south- Lane closure
Location:A77 (Off Slip To A76/A71 to Sb On Slip), Southbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A77 Bellfield to Dutchhouse - Embargo
Location:A77 (Off Slip To A76/A71 to Sb On Slip) to A77 (Dutch Hse Rbt to Dutch Hse Rbt), Southbound
Start time:4th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A77 Bellfield to Dutchhouse - Embargo
Location:A77 (Dutch Hse Rbt to Dutch Hse Rbt) to A77 (Nb Slip Road Exit to On Slip From A76/A71), Northbound
Start time:4th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A77 Bridgemill Rail Bridge - Convoy working
Location:A77 (Bridgemill Rbt to Dipple,Factory Ent), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Convoy Working (10mph)
A77 Dalquhat Farm @ Kirkoswald Road NB - TTL
Location:A77 (North End Turnberry Climbing Lane to High Park), Northbound
Start time:9th of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Dalquhat Farm @ Kirkoswald Road SB - TTL
Location:A77 (North End Turnberry Climbing Lane to High Park), Southbound
Start time:9th of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Dalrymple Street Girvan SB - Road Closure
Location:A77 (Stumpy Corner to Wesley Road) to A77 (Wesley Road to Duff Street), Southbound
Start time:29th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Road Closure.
A77 Dutchouse to Spitalhill North- Lane Closure
Location:A77 (Dutch Hse Rbt to Symington Nb) to A77 (East Lodge to Spittalhill Slip Rd Nb), Northbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A77 Glengall to Bankfield Rbt NB - TTLs
Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt), Northbound
Start time:4th of August 2024, 9:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Glengall to Bankfield Rbt SB - TTLs
Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt), Southbound
Start time:4th of August 2024, 9:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Holmston Layby NB TTL's
Location:A77 (Climbing Lane End to Start Of 4 Lane Single), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Holmston Layby SB TTL's
Location:A77 (Climbing Lane End to Start Of 4 Lane Single), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Holmston Rbt lane closure
Location:A77 (Holmston Rbt to Holmston Rbt), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Lane Closure.
A77 Holmston Rbt SB lane closure
Location:A77 (Holmston Rbt to Holmston Rbt) to A77 (Climbing Lane End to Start Of 4 Lane Single), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Lane Closure.
A77 NB Spittalhill to Bellfield - Lane Closure
Location:A77 (Spittalhill Slip Rd Nb to E. Ayrshire Bdy), Northbound
Start time:8th of July 2024, 12:01am
Description:Works:
Parapet Repairs
Traffic Management:
Lane Closure.
A77 NB Bellfield IC off slip - Total Closure
Location:A77 (Nb Slip Road Exit to Hurlford Int Rbt) to A77 (Hurlford Int Rbt to Hurlford Int Rbt), Northboun
Start time:28th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Spittalhill l NB off slip - Continue on B7038 Ayr Road until the RBT - Take 4th exit onto B7072 Hulford Road - take 2nd exit at rbt onto A735 Queens drive eastward - A77 Bellfield interchange NB on slip - Diversion End
A77 NB Bellfield IC off slip - Total Closure
Location:A77 (Nb Slip Road Exit to Hurlford Int Rbt) to A77 (Hurlford Int Rbt to Hurlford Int Rbt), Northboun
Start time:22nd of September 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Spittalhill NB off slip - Continue on B7038 Ayr Road until the RBT - Take 4th exit onto B7072 Hulford Road - take 2nd exit at rbt onto A735 Queens drive eastward - A77 Bellfield interchange NB on slip - Diversion End
A77 NB Bellfield IC off slip - Total closure
Location:A77 (Nb Slip Road Exit to Hurlford Int Rbt) to A77 (Hurlford Int Rbt to Hurlford Int Rbt), Northboun
Start time:7th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield IC SB off slip – West on A71 – South on A78 – A77 – Diversion End
A77 NB Bellfield IC on slip - Closure
Location:A77 (Hurlforf Int Rbt to On Slip From A76/A71), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield rbt take 4th exit onto A71- follow A71 to Moorfield rbt- take 3rd exit onto B7081- turn right at roundabout onto Irvine road- turn left onto B7064- follow road onto A77 north- end
A77 NB Bellfield IC to Meiklewood - Closure
Location:A77 (Nb Slip Road Exit to On Slip From A76/A71) to A77 (M77 Dbfo Boundary to Slip Road Exit Nb), Nor
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield rbt take 1st exit onto A71- follow A71 to Moorfield rbt- take 3rd exit onto B7081- turn right at roundabout onto Irvine road- turn left onto B7064- follow road onto A77 north end.
A77 NB Cairnryan Rd North Stranraer - TTLS
Location:A77 (A718 Jct to Mcmasters Rd) to A77 (Mcmasters Rd to A751 Dunfries Jct), Northbound
Start time:15th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 NB Grassyards off slip - Closure
Location:A77 (Start Sb Off Slip to End Sb Off Slip), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield rbt take 1st exit onto A71- follow A71 to Moorfield rbt- take 3rd exit onto B7081- turn right at roundabout onto Irvine road- turn left onto B7064- follow road onto A77 south- follow A77 south to Grassyards off slip- end
A77 NB Grassyards on slip - Closure
Location:A77 (Start Of Nb On Slip to End Of Nb On Slip), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
take A77 south- leave A77 for Bellfield rbt take 4th exit onto A71- follow A71 to Moorfield rbt- take 3rd exit onto B7081- turn right at roundabout onto Irvine road- turn left onto B7064- follow road onto A77 north end
A77 NB Mainline from Spittilhill to Bellfield IC - Total closure
Location:A77 (Spittalhill Slip Rd Nb to E. Ayrshire Bdy) to A77 (Nb Slip Road Exit to On Slip From A76/A71),
Start time:7th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield IC SB off slip – West on A71 – South on A78 – A77 – Diversion End
A77 NB Meiklewood off slip - road closure
Location:A77 (Slip Road Exit Nb to B7038 Jct), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield rbt take 1st exit onto A71- follow A71 to Moorfield rbt- take 3rd exit onto B7081- turn right at roundabout onto Irvine Road- turn left onto B7064- follow road onto A77 north end
A77 NB mainline at Spittalhill to Bellfield IC - Total Closure
Location:A77 (Spittalhill Slip Rd Nb to E. Ayrshire Bdy) to A77 (Nb Slip Road Exit to On Slip From A76/A71),
Start time:28th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Spittalhill l NB off slip - Continue on B7038 Ayr Road until the RBT - Take 4th exit onto B7072 Hulford Road - take 2nd exit at rbt onto A735 Queens drive eastward - A77 Bellfield interchange NB on slip - Diversion End
A77 NB mainline at Spittalhill to Bellfield IC - Total Closure
Location:A77 (Spittalhill Slip Rd Nb to E. Ayrshire Bdy) to A77 (Nb Slip Road Exit to On Slip From A76/A71),
Start time:22nd of September 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Spittalhill NB off slip - Continue on B7038 Ayr Road until the RBT - Take 4th exit onto B7072 Hulford Road - take 2nd exit at rbt onto A735 Queens drive eastward - A77 Bellfield interchange NB on slip - Diversion End
A77 North of Auchencrosh - NB TTLS SB
Location:A77 (Jct At Carlock House to Jct At Ballochdowan) to A77 (North Mark Br to Jct Carlock Hse), Southbo
Start time:25th of July 2024, 9:00am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 North of Auchencrosh - NB TTLS
Location:A77 (Jct At Carlock House to Jct At Ballochdowan) to A77 (North Mark Br to Jct Carlock Hse), Northbo
Start time:25th of July 2024, 9:00am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB - Bellfield IC off slip - Closure
Location:A77 (Sb Slip Exit to Hurlford Int Rbt), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 SB at J6 onto B7038 Glasgow Road- 2nd exit at rbt onto Western Road, B7064- turn right onto Irvine Road- turn left onto B7081- turn left at Moorfield Rbt- follow A71 to Bellfield Interchange- follow directional signs
A77 SB - Bellfield IC on slip - Slip Closure
Location:A77 (A76/A71 Rbt to Sb On Slip), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Take 2nd exit onto A71- A71 Moorfoot Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow directional signs
A77 SB - Bellfield IC to Dutchouse Rbt - Road Closure
Location:A77 (Off Slip To A76/A71 to Sb On Slip) to A77 (Symington Sb to Dutch Hse Rbt), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave A77 south at Bellfield Rbt- take 3rd exit onto A71- A71 Moorfield Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow directional signs.
TRO 3546706
A77 SB - Bogend off slip Tarbolton Road - Slip Closure
Location:A77 (East Lodge to Symington Sb), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave A77 south at Bellfield Rbt- take 3rd exit onto A71- A71 Moorfoot Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow A77 north – take off slip to Bogend - end
A77 SB - Bogend on slip Tarbolton Road - Slip Closure
Location:A77 (East Lodge to Symington Sb), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Take A77 NB - Leave A77 north at Bellfield IC - take 1st exit onto A71- A71 Moorfoot Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow directional signs
A77 SB - Grassyards off slip - Closure
Location:A77 (Start Of Sb Off Slip to End Of Sb Off Slip), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 SB at Jct 8 onto B7038 Glasgow Road- 2nd exit at rbt onto Western Road, B7064- turn right onto Irvine Road- turn left onto B7081- turn left at Moorfield Rbt- follow A71 to Bellfield Interchange- follow directional signs
A77 SB - Grassyards on slip - Closure
Location:A77 (Start Of Sb On Slip to End Of Sb On Slip), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
take A77 north- leave A77 north at meiklewood off slip onto B7038 Glasgow road- 2nd exit at rbt onto western road B7064- turn right onto irvine road- turn left onto B7081- turn left at Moorfield rbt- follow A71 to Bellfield interchange- follow directional signs
A77 SB - Meiklewood on slip Closure
Location:A77 (B7038 Jct to On Slip From B7038) to A77 (On Slip From B7038 to M77 Dbfo Boundary), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 SB at Jct 8 onto B7038 Glasgow Road- 2nd exit at rbt onto Western Road, B7064- turn right onto Irvine Road- turn left onto B7081- turn left at Moorfield Rbt- follow A71 to Bellfield Interchange- follow directional signs
A77 SB - Meiklewood to Bellfield IC - Closure
Location:M77 (B778 Overbridge Fenwick to End Of Motorway) to A77 (Off Slip To A76/A71 to Sb On Slip), Southbo
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 SB at Jct 8 onto B7038 Glasgow Road- 2nd exit at rbt onto Western Road, B7064- turn right onto Irvine Road- turn left onto B7081- turn left at Moorfield Rbt- follow A71 to Bellfield Interchange- follow directional signs
TRO: 3603859
A77 SB - Spitalhill on slip - Slip Closure
Location:A77 (K&C District Boundary to Spitalhill Slip Rd), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
take the B7038- take 1st exit onto A71- A71 Moorfoot Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow directional signs. LA ref 3342227
A77 SB - Symington off slip - Slip Closure
Location:A77 (East Lodge to Symington Sb), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave A77 south at Bellfield Rbt- take 3rd exit onto A71- A71 Moorfoot Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow directional A77 north – leave A77 at Symington - end
A77 SB - Symington on slip - Slip Closure
Location:A77 (East Lodge to Symington Sb), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Join A77 NB - Leave A77 north at Bellfield Rbt- take 1st exit onto A71- A71 Moorfoot Rbt 2nd exit- A71 Corsehill Rbt 2nd exit- At Warrix 1st exit on to A78 south- A78 Meadowhead Rbt 2nd exit- A78 Monktonhead 2nd exit to Dutchouse- follow directional signs
A77 SB Ardwell Kennedy Pass to lendalfoot TTL's
Location:A77 (Lendalfoot Br to Ardmillan Castle), Southbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Bellfield IC on slip - Total Closure
Location:A77 (A76/A71 Rbt to Sb On Slip), Southbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield IC SB off slip – West on A71 – South on A78 – A77 – Diversion End
A77 SB Bellfield IC on slip - Total closure
Location:A77 (A76/A71 Rbt to Sb On Slip), Southbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield IC SB off slip – West on A71 – South on A78 – A77 – Diversion End
A77 SB Between Whitlettts Rbt and Holmston Rbt - Route Part of Diversion
Location:A77 (Holmston Rbt to Holmston Rbt) to A77 (Whitletts Rbt to Whitletts Rbt), Southbound
Start time:17th of June 2024, 8:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A77 SB Cairnryan Rd North Stranraer - TTLS
Location:A77 (Mcmasters Rd to A751 Dunfries Jct) to A77 (A718 Jct to Mcmasters Rd), Southbound
Start time:15th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Spittalhill on slip - Slip Closure
Location:A77 (K&C District Boundary to Spitalhill Slip Rd), Northbound
Start time:4th of August 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
continue on B7038 toward Kilmarnock, take the first lift at the roundabout to join A71 westbound. continue on A71 to A78 Warrix I/C , Left on to A78 SB at Warrix I/C , continue on A78 SB to Dutchhouse - diversion ends
A77 SB mainline at Bellfield IC to Spittilhill - Total Closure
Location:A77 (Off Slip To A76/A71 to Sb On Slip) to A77 (East Ayrshire Bdy to Spitalhill Slip Rd), Southbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield IC SB off slip – West on A71 – South on A78 – A77 – Diversion End
A77 SB mainline at Bellfield IC to Spittilhill - Total Closure
Location:A77 (Off Slip To A76/A71 to Sb On Slip) to A77 (East Ayrshire Bdy to Spitalhill Slip Rd), Southbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 Bellfield IC SB off slip – West on A71 – South on A78 – A77 – Diversion End
A77 Spitalhill to Dutchouse south- Lane closure
Location:A77 (East Ayrshire Bdy to Spitalhill Slip Rd) to A77 (Symington Sb to Dutch Hse Rbt), Southbound
Start time:26th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A77 Turnberry to Maybole NB - STOP AND GO
Location:A77 (North End Turnberry Climbing Lane to High Park) to A77 (Jct Blanefield to Jct Broomknowes Fm),
Start time:8th of July 2024, 9:30am
Description:Works:
Gully Emptying
Traffic Management:
Stop/Go Boards Traffic Control.
A77 Turnberry to Maybole SB - STOP AND GO
Location:A77 (Jct Blanefield to Jct Broomknowes Fm) to A77 (North End Turnberry Climbing Lane to High Park),
Start time:8th of July 2024, 9:30am
Description:Works:
Gully Emptying
Traffic Management:
Stop/Go Boards Traffic Control.
A77 Vicarton St @ Girvan NB - TTL
Location:A77 (Jct Montgomerie St to Railway Br), Northbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Vicarton St @ Girvan SB - TTL
Location:A77 (Jct Montgomerie St to Railway Br), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77/A78 Pennyburn to Bankfield Roundabout - Planned Event Embargo
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A77 (Bankfield Rbt to Bankfield Rbt), Southbou
Start time:12th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A77/A78 Pennyburn to Bankfield Roundabout - Planned Event Embargo
Location:A77 (Bankfield Rbt to Bankfield Rbt) to A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated L
Start time:12th of July 2024, 12:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A78 NB Newhouse offslip - Closure
Location:A78 (Off Slip To A737/B7080 to Newhouse Rbt), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave Meadowhead and take 2nd exit onto A737- take 2nd exit at Three Staines rbt- at next rbt take 2nd exit- follow A737 to Merryvale rbt and take 2nd exit- at Fullarton rbt take 2nd exit- at Marress rbt take 2nd exit- at next junction take left turn onto A737 Kilwinning Road- at Redburn rbt take 2nd exit onto Eglington rbt- join A78 south- leave A78 at Newhouse- end
A78 SB Chapelhill Rbt to Sharphill Rbt - Road Closure
Location:A78 (Chapelhill Roundabout to Speed Derestriction Sign) to A78 (Sharphill Roundabout to Sharphill Ro
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn onto Dalry rd- turn left onto A738- continue on A738 eglinton road east- turn left at glencairn st jct- continue on A738 to Pennyburn rbt- end
A78 SB Warrix IC off slip - Slip Closure
Location:A78 (Broomsland Busway O/B to Start Of 2-Lane) to A78 (Start Of 2-Lane to A71 Rbt & A71 Eb), Southbo
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A737- at roundabout take 2nd exit onto A737 - at Marress rbt take 2nd exit- Fullarton rbt 2nd exit- Merryvale rbt 2nd exit- next rbt take 2nd exit- follow a737 Ayr road- Three Stanes rbt take 2nd exit- follow A737 to Meadowhead rbt- end
A78 @ Irvine Road - NB TTLS
Location:A78 (B7047 Junction to Montfode Roundabout) to A78 (220m N Of Chapelton to B7047 Jct), Northbound
Start time:24th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 @ Irvine Road - SB TTLS
Location:A78 (B7047 Junction to Montfode Roundabout) to A78 (220m N Of Chapelton to B7047 Jct), Southbound
Start time:24th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Dutchhouse to Loans NB - Temporary Speed Restriction
Location:A77 (Dutch Hse Rbt to Dutch Hse Rbt) to A78 (End Entry Slip B746 to Exit Nb From A78), Northbound
Start time:13th of July 2024, 12:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway (40mph)
A78 Dutchhouse to Loans SB - Temporary Speed Restriction
Location:A78 (End Entry Slip B746 to Exit Nb From A78) to A78 (Monkton Rbt to Dutch Hse Rbt), Southbound
Start time:13th of July 2024, 12:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway (40mph)
A78 Eglinton NB - Temporary Speed Restriction
Location:A78 (Mandon Rd O/B to End 3-Lane C/Way) to A78 (Irvine Rd O/B to Railway Overbridge), Northbound
Start time:13th of July 2024, 12:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway (40mph)
A78 Inverkip Rd at Branchton Station EB - Lane Closure
Location:A78 (Branchton Rd to Cumberland Rd), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A78 NB Newhouse IC onslip - Closure
Location:A78 (Newhouse Rbt to Entry Slip To A78), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave Newhouse rbt onto A737- take 3rd exit at Three Staines rbt- at next rbt take 2nd exit- follow A737 to Merryvale rbt and take 2nd exit- at Fullarton rbt take 2nd exit- at Marress rbt take 2nd exit- at next junction take left turn onto A737 Kilwinning Road- at Redburn rbt take 2nd exit onto Eglington rbt- end
A78 NB Warrix IC on slip - Closure
Location:A78 (A71 Warrix Rbt to Entry Slip) to A78 (Start 3-Lane C/Way to Start 3-Lane C/Way), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave Warrix onto A71- at Milgarhol rbt take 1st exit- follow A71 to Merryvale rbt and take 3rd exit- at Fullarton rbt take 2nd exit- at Marress rbt take 2nd exit- at next junction take left turn onto A737 Kilwinning Road- at Redburn rbt take 2nd exit onto Eglington rbt- end
A78 NB - Barassie off slip - Slip closure
Location:A78 (Exit Nb From A78 to A759 West Rbt), Northbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
At Monktonhead Rbt, take exit onto A78 south - at Dutchouse rbt take 1st exit onto A77 north- Leave A77 at Bellfield interchange- at rbt take 2nd exit onto A71- follow A71 to Warrix rbt and follow directional signs
A78 NB - Loans off slip - Slip Closure
Location:A78 (Off Slip B746 to Start Entry Slip B746), Northbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
At Monktonhead Rbt, take exit onto A78 south - at dutchouse rbt take 1st exit onto A77 north- Leave A77 at Bellfield interchange- at rbt take 2nd exit onto A71- follow A71 to Warrix rbt and follow directional signs
A78 NB - Loans on slip - Slip Closure
Location:A78 (B746 Fullarton Rd Jct to End Entry Slip B746) to A78 (Start Entry Slip B746 to End Entry Slip B
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow B746 at rbt take 2nd exit onto Main St A759- at rbt take 1st exit and follow road to Meadowhead Rbt- end
A78 NB - Loans on slip - Slip Closure
Location:A78 (B746 Fullarton Rd Jct to End Entry Slip B746) to A78 (Start Entry Slip B746 to End Entry Slip B
Start time:21st of August 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow B746 at rbt take 2nd exit onto Main St A759- at rbt take 1st exit and follow road to Meadowhead Rbt- end
A78 NB - Monktonhead Rbt to Meadowhead Rbt - Road closure
Location:A78 (Monkton Rbt to Monkton Rbt) to A78 (A759 O'Bridge to Meadowhead Rbt), Northbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
At Monktonhead Rbt, take exit onto A78 south - at Dutchouse rbt take 1st exit onto A77 north- Leave A77 at Bellfield interchange- at rbt take 2nd exit onto A71- follow A71 to Warrix rbt and follow directional signs
A78 NB Chapelhill Rbt to Montfode Rbt - Road closure
Location:A78 (Chapelhill Roundabout to Chapelhill Roundabout) to A78 (Montfode Roundabout to Montfode Roundab
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn onto B780 Dalry Road- turn right onto A738- Eglington Road- follow directional signs
A78 NB Eglinton IC to Pennyburn Rbt - Road Closure
Location:A78 (End 3-Lane C/Way to Irvine O/B) to A78 (Pennyburn Roundabout to Pennyburn Roundabout), Northbou
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave A78 at Eglington- turn right onto A737 Irvine Road- at traffic lights go straight ahead onto A738- follow A78 to Pennyburn rbt- end
A78 NB Inverkip Rd at Greenock Cemetery - TTLS
Location:A78 (South St Roundabout to Inverkip Rd Rbt), Northbound
Start time:30th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Inverkip Road IBM Lane Closure
Location:A78 (Greenock Bdy to End Dual Spango Valley), Northbound
Start time:16th of July 2024, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A78 NB Inverkip Road/IBM lane Closures
Location:A78 (Bankfoot Rbout to Jct Loch Thom Rd) to A78 (Derest Sign to Start Dual Spango Valley), Northboun
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A78 NB Irvine Road Largs - TTLS
Location:A78 (A760 Jct Dalry Rd to Jct Firpark Plantation) to A78 (Gogo St to A760 Jct Dalry Rd), Southbound
Start time:17th of July 2024, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Irvine Road south of Largs - TTLS
Location:A78 (A760 Jct Dalry Rd to Jct Firpark Plantation), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Onslip Irvine Bypass Slip Closure
Location:A78 (A737 Rbt to Entry Slip), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn right onto A737 Irvine Road- at traffic lights go straight ahead onto A738- follow A78 to Pennyburn rbt- end
A78 NB Pennyburn Rbt to Sharphill Rbt - Road Closure
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Speed Derestriction Sign to Sharphill Rou
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn onto A738 westbound- At junction turn right onto A738 Glencairn St- follow A738- turn right onto B714 Dalry Rd- follow road to Sharphill- end
A78 NB Sharphill Rbt to Chapelhill Rbt - Road Closure
Location:A78 (Sharphill Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Chapelhill Roundabout
Start time:9th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn onto B714 Dalry Road- turn right onto A738- Eglington Road- follow directional signs
A78 NB Warrix IC off slip - Closure
Location:A78 (Off Slip To A71 to A71 Warrix Rbt), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave Meadowhead and take 2nd exit onto A737- take 2nd exit at Three Staines rbt- at next rbt take 2nd exit- follow A737 to Merryvale rbt and take 2nd exit- at Fullarton rbt take 2nd exit- at Marress rbt take 2nd exit- at next junction take left turn onto A737 Kilwinning Road- at Redburn rbt take 2nd exit onto Eglington rbt- join A78 south- leave A78 at Warrix- end
A78 NB at Greenock West Station - TTLS
Location:A78 (Roxburgh St to South St Rbt), Northbound
Start time:18th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 N\B Ardrossan Road Seamill - TTLs
Location:A78 (220m N Of Chapelton to B7047 Jct) to A78 (Yerton Brae Jct to Glenbryde Rd Jct), Northbound
Start time:2nd of September 2024, 9:30am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB Montfode Rbt to Chapelhill Rbt - Road Closure
Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Chapelhill Roundabout)
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A738 Eglinton road east- turn left at Glencairn st jct- continue on A738 to Pennyburn rbt- end
A78 SB Montfode Rbt to Chapelhill Rbt - Road Closure
Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Chapelhill Roundabout)
Start time:19th of August 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A738 Eglinton Road east- turn left at Glencairn St jct- continue on A738 to Pennyburn rbt- end
A78 SB Newhouse off slip- Slip Closure
Location:A78 (Exit Slip A737/B7080 to Newhouse Rbt), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A737- at roundabout take 2nd exit onto A737 - at Marress rbt take 2nd exit- Fullarton rbt 2nd exit- Merryvale rbt 2nd exit- next rbt take 2nd exit- follow a737 Ayr road- Three Stanes rbt take 2nd exit- follow A737 to Meadowhead rbt- leave rbt at 1st exit onto A78 north- leave A78 at Newhouse- end
A78 SB Auchengate Onslip - Slip Closure
Location:A78 (Old Craighall Rbt to Entry Slip A759), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Follow A759 - at rbt take 3rd exit Dundonald Road- turn left onto Harling Dr - at crossroads go straight ahead onto Fullarton Dr - turn left onto B749 - at jct turn left onto A79 - follow road to Monktonhead Rbt - end
A78 SB Eglinton IC on slip - Slip Closure
Location:A78 (Eglinton Interchange to Merge With B7080), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A737- at roundabout take 2nd exit onto A737 - at Marress rbt take 2nd exit- Fullarton rbt 2nd exit- Merryvale rbt 2nd exit- next rbt take 2nd exit- follow a737 Ayr road- Three Stanes rbt take 2nd exit- follow A737 to Meadowhead rbt- end
A78 SB Eglinton IC to Meadowhead Rbt -Road closure
Location:A78 (Rail Overbridge to Irvine Rd Overbridge) to A78 (Shewalton Rd O/B to Meadowhead Rbt), Southboun
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A737- at roundabout take 2nd exit onto A737 - at Marress rbt take 2nd exit- Fullarton rbt 2nd exit- Merryvale rbt 2nd exit- next rbt take 2nd exit- follow a737 Ayr road- Three Stanes rbt take 2nd exit- follow A737 to Meadowhead rbt- end
A78 SB Eglinton off slip - Slip Closure
Location:A78 (Exit Slip A737 to Eglinton Int Rbt), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn onto A738 Stevenston Road-at traffic lights Byres Road continue straight ahead onto A737- follow A737 Irvine Road- to Eglinton interchange- end
A78 SB Inverkip Rd at Greenock Cemetery - TTLS
Location:A78 (South St Roundabout to Inverkip Rd Rbt), Southbound
Start time:30th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB Inverkip Road Bankfoot lane closure
Location:A78 (Start Dual Spango Valley to Greenock Bdy) to A78 (Jct Loch Thom Rd to Bankfoot Rbout), Southbou
Start time:15th of July 2024, 9:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Lane Closure.
A78 SB Inverkip Road/IBM lane Closures
Location:A78 (Derest Sign to Start Dual Spango Valley) to A78 (Jct Loch Thom Rd to Bankfoot Rbout), Southboun
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A78 SB Irvine Road Largs - TTLS
Location:A78 (Gogo St to A760 Jct Dalry Rd) to A78 (A760 Jct Dalry Rd to Jct Firpark Plantation), Southbound
Start time:17th of July 2024, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB Irvine Road south of Largs - TTLS
Location:A78 (A760 Jct Dalry Rd to Jct Firpark Plantation), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB Loans off slip - Slip Closure
Location:A78 (Exit Sb From A78 to B746 Rbt), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave Meadowhead Rbt onto A759 - at rbt take 2nd exit A759 Main St - at rbt take 3rd exit Dundonald Road- turn left onto Harling Dr - at crossroads go straight ahead onto Fullarton Dr - turn left onto B749 - at jct turn left onto A79 - follow road to Monktonhead Rbt - end
A78 SB Loans on slip - Slip Closure
Location:A78 (B746 Rbt to Entry Slip B746), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow B746- at jct turn right- at rbt take 1st exit Dundonald Road - turn left onto Harling Dr - at crossroads go straight ahead onto Fullarton Dr - turn left onto B749 - at jct turn left onto A79 - follow road to Monktonhead Rbt - end
A78 SB Meadowhead Rbt to Monktonhead Rbt- Closure
Location:A78 (Meadowhead Rbt to Meadowhead Rbt) to A78 (Monkton Rbt to Monkton Rbt), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave Meadowhead Rbt onto A759 - at rbt take 2nd exit A759 Main St - at rbt take 3rd exit Dundonald Road- turn left onto Harling Dr - at crossroads go straight ahead onto Fullarton Dr - turn left onto B749 - at jct turn left onto A79 - follow road to Monktonhead Rbt - end
A78 SB Newhouse IC on slip - Slip Closure
Location:A78 (A737 Newhouse Rbt to Entry Slip), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
take A737 exit from Newhouse rbt- at Three Staines rbt take 1st exit onto A737- follow A737 to Meadowhead rbt- end 3554353
A78 SB Pennyburn Rbt to Eglinton IC Road Closure
Location:A78 (Pennyburn Rbt to Railway Bridge) to A78 (Nosing to Footbridge 5), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
turn onto A738 Stevenston Road-at traffic lights Byres Road continue straight ahead onto A737- follow A737 Irvine Road- to Eglinton interchange- end
A78 SB Sharphill Rbt to Pennyburn Rbt -Road Closure
Location:A78 (Sharphill Roundabout to Sharphill Roundabout) to A78 (40 Mph Speed Limit to Pennyburn Roundabou
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A738 Eglinton road east- turn left at Glencairn st jct- continue on A738 to Pennyburn rbt- end
A78 SB Warrix IC on slip - Slip Closure
Location:A78 (A71 Warrix Rbt to Entry Slip To A78), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow A71- take 1st exit at rbt- at Merryvale rbt take 1st exit onto A737- next rbt take 2nd exit- follow a737 Ayr road- Three Stanes rbt take 2nd exit- follow A737 to Meadowhead rbt- end
A78 SB at Greenock West Station - TTLS
Location:A78 (Roxburgh St to South St Rbt) to A78 (South St Rbt to South St Rbt), Southbound
Start time:18th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 S\B Ardrossan Road Seamill - TTLs
Location:A78 (220m N Of Chapelton to B7047 Jct) to A78 (Yerton Brae Jct to Glenbryde Rd Jct), Southbound
Start time:2nd of September 2024, 9:30am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A8 @ East Hamilton Street - EB TTLS
Location:A8 (Sinclair Street to Bogston Lane), Eastbound
Start time:30th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A8 @ East Hamilton Street - WB TTLS
Location:A8 (Bogston Lane to Sinclair Street), Eastbound
Start time:30th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A8 Chapelhall South Rbt to Bo'ness Road - total closure
Location:A8 (Slip Rd 2 Way Split to B799 Jct), Southbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Chapelhall South Rbt, Chapelhall North Rbt, B799, Bo'ness Rbt.
A8 EB Greenock Rd Lane Closure
Location:A8 (Port Glasgow Western Rbt to Port Glasgow Northern Rbt) to A8 (Port Glasgow Nothern Rbt to Port G
Start time:11th of July 2024, 8:00pm
Description:Works:
Carriageway Patching, Gully/ironwork repairs
Traffic Management:
Lane Closure.
A8 EB Main St onto E Hamilton St - Lane Closure
Location:A8 (Cartsburn St Rbt to Cartsdyke Rbt) to A8 (Cartsdyke Rbt to Sinclair St), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A8 EB Newark Rbt to Bullring Rbt - Mobile Lane Closures
Location:A8 (Bull Ring Rbt to Bull Ring Rbt) to A8 (Newark Rbt to Newark Rbt), Eastbound
Start time:14th of July 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Mobile Lane Closures.
A8 EB Rue End St - Advanced Signage
Location:A8 (Bull Ring Rbt to B788 Jct) to A8 (B788 Jct to Cartsburn St Rbt), Eastbound
Start time:24th of July 2024, 10:00pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A8 Eastbound Carnbroe off-slip - total closure
Location:A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 EB Chapelhall, B799 Bo'Ness Road follow sign for Carnbroe, B802 Woodhall Mill Rd, Sykeside Road, Paddock Street, Park Place, Carnbroe Road, Sweethill terrace.
A8 Eastbound Carnbroe on-slip - Total closure
Location:A8 (Shawhead Overbridge to Carnbroe On Slip) to A8 (Carnbroe On Slip to End Of 3 Lane At Off Slip),
Start time:17th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Sweethill terrace, Carnbroe Rd, Paddock St, Sykeside Rd, B802.
A8 Eastbound Chapelhall North Rbt - Inner ring closure
Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Eastbound Chapelhall to Newhouse - Total closure
Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split) to M8 (A73 Newhouse Rbt to On To M8 Eb), Eastbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
B799, Lancaster Avenue Eastbound, A73, A8 Newhouse on-slip
A8 Eastbound Eurocentral North Rbt - Inner ring closure
Location:A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Eastbound Eurocentral North Roundabout - Outer ring closure
Location:A8 (Off-Slip Start to Eurocentral N.Rbt), Northbound
Start time:7th of July 2024, 6:00am
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
A8 Eastbound Eurocentral to Newhouse - Progressive nearside & offside lane closures
Location:A8 (Eurocentral N.Rbt to Eb On Slip) to M8 (End Of Ppp to Duntilland Road), Eastbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Eastbound Shawhead off-slip - total closure
Location:A8 (Shawhead Overbridge to Carnbroe On Slip) to A8 (Start 2 Way Slip to Start 4 Lane), Eastbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 eastbound, A8 Eurocentral, A8 westbound
A8 Eastbound Shawhead on-slip - Total closure
Location:A8 (Start 2 Way Slip to Start 4 Lane) to A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 westbound, A8 Showcase off slip, A8 eastbound
A8 Eastbound Shawhead to Eurocentral - offside lane closure
Location:A8 (Shawhead Overbridge to Carnbroe On Slip) to A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Eastbound Showcase - Nearside lane closure
Location:A8 (Bargeddie Underbridge to Shawhead Overbridge), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Eastbound Showcase Off-slip Junction - Total closure
Location:A8 (Baillieston On Slip to Bargeddie Underbridge) to A8 (2 Way Split to A752 Langmuir Rbt), Eastboun
Start time:10th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 EB Shawhead Off-slip, WB Shawhead On-slip.
A8 Eastbound Showcase on-slip Junction - Total closure
Location:A8 (2 Way Split to A752 Langmuir Rbt) to A8 (Bargeddie Underbridge to Shawhead Overbridge), Eastboun
Start time:10th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 WB Showcase on-slip, Bargeddie Rbt, A8 EB.
A8 Greenock Road from Langbank Rbt to Woodhall Rbt WB - Road Closure
Location:A8 (Langbank Rbt to Langbank Rbt) to A8 (Woodhall Rbt to Woodhall Rbt), Westbound
Start time:1st of August 2024, 10:00pm
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
M8 JCN 29 St James Interchange, onto A737 S/Bound, exiting onto Barrochan Road, onto the A761 Bridge Of Weir Road towards Port Glasgow.
A8 Greenock Road from Newark Rbt to Finlaystone Country Park EB - Lane Closure
Location:A8 (Port Glasgow Eastern Rbt to Newark Rbt) to A8 (Port Glasgow Boundary to Inverclyde Council Bound
Start time:21st of July 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Greenock Road from Newark Rbt to Finlaystone Country Park WB - Lane Closure
Location:A8 (Inverclyde C.Boundary to Port Glasgow Boundary) to A8 (Newark Rbt to Newark Rbt), Westbound
Start time:21st of July 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Greenock Road from Newark Rbt to Port Glasgow Road Jct - Lane Closures
Location:A8 (Port Glasgow Eastern Rbt to Newark Rbt) to A8 (Port Glasgow Western Rbt to Bogstan Lane), Westbo
Start time:7th of July 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Greenock Road from Newark Rbt to Port Glasgow Road Jct - Lane Closures
Location:A8 (Bogstan Lane to Port Glasgow Western Rbt) to A8 (Newark Rbt to Newark Rbt), Eastbound
Start time:7th of July 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Greenock Road from Woodhall Rbt to Langbank Rbt to EB - Road Closure
Location:A8 (Woodhall Rbt to Pt Glasgow Bdy) to A8 (Langbank Rbt to Langbank Rbt), Eastbound
Start time:31st of July 2024, 10:00pm
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
A761 Clune Brae towards Johnstone, onto A737 N/Bound towards M8 JCN 29 St James Interchange.
A8 Main Street/Rue End St, from Cartsdyke Rbt to Dellingburn Street Jct - Lane Closure
Location:A8 (Cartsdyke Rbt to Cartsdyke Rbt) to A8 (B788 Jct to Bull Ring Rbt), Westbound
Start time:4th of August 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Main Street/Rue End St, from Cartsdyke Rbt to Dellingburn Street Jct - Lane Closure
Location:A8 (B788 Jct to Cartsburn St Rbt) to A8 (Cartsdyke Rbt to Cartsdyke Rbt), Eastbound
Start time:4th of August 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
A8 Showcase on-slip Eastbound - total closure
Location:A8 (2 Way Split to A752 Langmuir Rbt) to A8 (Bargeddie Underbridge to Shawhead Overbridge), Eastboun
Start time:4th of July 2024, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
A8 WB Greenock Rd Lane Closure
Location:A8 (Newark Rbt to Port Glasgow Eastern Rbt), Westbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Carriageway Patching, Gully/ironwork repairs
Traffic Management:
Lane Closure.
A8 WB Newark Rbt to Bullring Rbt - Mobile Lane Closures
Location:A8 (Port Glasgow Eastern Rbt to Newark Rbt) to A8 (Bull Ring Rbt to Bull Ring Rbt), Westbound
Start time:14th of July 2024, 6:30am
Description:Works:
Third Party Works
Traffic Management:
Mobile Lane Closures.
A8 WB Rue End St - Advanced Signage
Location:A8 (Cartsburn St Rbt to B788 Jct) to A8 (B788 Jct to Bull Ring Rbt), Westbound
Start time:24th of July 2024, 10:00pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A8 Westbound Bargeddie Roundabout - Inner ring closure
Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Westbound Chapelhall South Rbt - Inner ring closure
Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip), Westbound
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Westbound Eurocentral South Rbt - Inner ring closure
Location:A8 (Off-Slip Start to Eurocentral S.Rbt), Westbound
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Westbound Eurocentral to Shawhead - Offside lane closures
Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to A8 (Shawhead Overbridge to Bargeddie), Westbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Westbound Newhouse on-slip - Total closure
Location:A8 (A73 Rbt to Entry Wb A8) to A8 (Newhouse Entry Slip to B799 O'Bridge), Westbound
Start time:9th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A73, Lancaster Ave, B799 Bo'Ness Road
A8 Westbound Newhouse to Eurocentral - Progressive nearside & offside lane closures
Location:M8 (End Of Se Unit to A73 On Slip) to A8 (Off-Slip Start to Eurocentral S.Rbt), Westbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Westbound Shawhead off-slip - Total closure
Location:A8 (Slip Rd Off A8 Wb to 2 Way Split) to A8 (A725 Jct to 2 Way Split Wb Slip), Westbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 westbound, A8 Showcase off-slip, A8 eastbound, A8 Shawhead eastbound off-slip.
A8 Westbound Shawhead on-slip - Total closure
Location:A8 (A725 Jct to 2 Way Split Wb Slip) to A8 (2 Way Split to Entry A8 Wb), Westbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 eastbound, A8 Eurocentral Link road, A8 westbound.
A8 Westbound Showcase off-slip - Total closure
Location:A8 (Shawhead Overbridge to Bargeddie) to A8 (A752 Jct to 2 Way Split), Westbound
Start time:11th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 Bargeddie roundabout and return eastbound.
A8 Westbound Showcase on-slip - Total closure
Location:A8 (A752 Jct to 2 Way Split) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westbound
Start time:11th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Aitkenhead Road, Circle roundabout, A8 Eastbound on-slip, A8 Eastbound Shawhead off-slip, A8 Westbound Shawhead on-slip.
A8 Westbound Swinton Roundabout - Inner ring closure
Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to A8 (Coatbridge Rd / Edinburgh Rd to Baillies
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8(M) Glasgow Edinburgh Road - Offside lane closure
Location:M73 (Off Slip From M73 to A8 Bailleston Rbt), Eastbound
Start time:6th of July 2024, 6:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A803 Springburn Rd/Castle Street SB - Lane Closure
Location:M8 (Slip Off M8 Eb to A803 Jct) to M8 (M8 Overbridge to Entry M8 Wb), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Barrier Repair, Inspections
Traffic Management:
Lane Closure.
A82 SB Great Western Road from Dunglass Rbt to Erskine - Lane Closure
Location:A82 (Dunglass Roundabout to Dunglass Roundabout) to A898 (A898 Northbound Off Slip to A82 Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A82 Achintore Rd Fort William NB - TTL
Location:A82 (Cemetery Entrance to Past Mercury M/Inn), Northbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Achintore Rd Fort William SB - TTL
Location:A82 (Past Mercury Inn to West End Rbt) to A82 (Cemetery Entrance to Past Mercury M/Inn), Southbound
Start time:25th of July 2024, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Achintore Rd NB - TTL
Location:A82 (Past Mercury Inn to West End Rbt), Northbound
Start time:6th of July 2024, 7:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Achintore Rd SB - TTL
Location:A82 (Past Mercury Inn to West End Rbt), Southbound
Start time:6th of July 2024, 7:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Achnahannet South of Drumnadrochit NB - TTL
Location:A82 (23ml Milestone to 450m N Of Cobb Meml), Northbound
Start time:15th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Achnahannet South of Drumnadrochit SB - TTL
Location:A82 (23ml Milestone to 450m N Of Cobb Meml), Southbound
Start time:15th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Ballachulish NB - TTL
Location:A82 (Gabions, Ballachulish to Hrc Salt Depot), Northbound
Start time:18th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Ballachulish SB - TTL
Location:A82 (Gabions, Ballachulish to Hrc Salt Depot) to A82 (Glencoe Police Station to Gabions, Ballachulis
Start time:18th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Bunloit South of Drumnadrochit - TTL
Location:A82 (23ml Milestone to 450m N Of Cobb Meml), Northbound
Start time:8th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Foyers South of Drumnadrochit NB - TTL
Location:A82 (23ml Milestone to 450m N Of Cobb Meml), Northbound
Start time:8th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Foyers South of Drumnadrochit SB - TTL
Location:A82 (23ml Milestone to 450m N Of Cobb Meml), Southbound
Start time:8th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Glencoe NB - TTL
Location:A82 (Glencoe Police Station to Gabions, Ballachulish) to A82 (Gabions, Ballachulish to Hrc Salt Depo
Start time:16th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Glencoe SB - TTL
Location:A82 (Glencoe Police Station to Gabions, Ballachulish), Southbound
Start time:16th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Grotaig South of Drumnadrochit NB - TTL
Location:A82 (23ml Milestone to 450m N Of Cobb Meml), Northbound
Start time:1st of August 2024, 7:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Inverarnan NB - TTL
Location:A82 (Stirling/Argyle Bdy to Allt Fonn Br.), Northbound
Start time:4th of July 2024, 11:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Inverarnan SB - TTL
Location:A82 (Stirling/Argyle Bdy to Allt Fonn Br.), Southbound
Start time:4th of July 2024, 11:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergarry NB - TTL
Location:A82 (A87 Jct to 300m N Power Sta), Northbound
Start time:16th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergarry SB - TTL
Location:A82 (A87 Jct to 300m N Power Sta), Southbound
Start time:16th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergloy NB - TTL
Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Northbound
Start time:6th of August 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergloy North of Spean Bridge NB - TTL
Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Northbound
Start time:8th of July 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergloy North of Spean Bridge SB - TTL
Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Southbound
Start time:8th of July 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergloy SB - TTL
Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Southbound
Start time:6th of August 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Inverness to Drumnadrochit - Event
Location:A82 (Kenneth St. to Telford St Rbt) to A82 (Borlum Bridge to A831 Drumnadrochit Bridge), Southbound
Start time:25th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A82 Inveruglas NB - TTL
Location:A82 (Tarbet Jct to Loch Sloy Power Stat) to A82 (Loch Sloy Power Stat to Ardlui Station), Northbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Inveruglas SB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station) to A82 (Tarbet Jct to Loch Sloy Power Stat), Southbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Laggan - Stop/Go Works
Location:A82 (Culvert Past Layby to Laggan Swing Br), Northbound
Start time:8th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Stop/Go Boards Traffic Control.
A82 Lochan Na h-Achlaise South of Kinghouse NB - Road Closure
Location:A82 (Highland Bdy to White Corries), Northbound
Start time:30th of October 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Via A85 + A828
A82 Lochan Na h-Achlaise South of Kinghouse SB - Road Closure
Location:A82 (Highland Bdy to White Corries), Southbound
Start time:30th of October 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Via A85 + A828
A82 Longman Rd Inverness NB - Lane Closure
Location:A82 (Rose St Rbt to Harbour Rd Rbt) to A82 (Harbour Rd Rbt to Speed Derest), Northbound
Start time:8th of July 2024, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A82 Longman Rd Inverness SB - Lane Closure
Location:A82 (Speed Derest to Harbour Rd Rbt) to A82 (Harbour Rd Rbt to Rose St Rbt), Southbound
Start time:8th of July 2024, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A82 Longman Rnbt to Shore St Rnbt Inverness NB - Diversion Signage
Location:A82 (Shore St Rbt to Rose St Rbt) to A82 (Speed Derest to Longman Rbt), Northbound
Start time:2nd of August 2024, 11:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A82 Longman Rnbt to Shore St Rnbt Inverness SB - Diversion Signage
Location:A82 (Longman Rbt to Speed Derest) to A82 (Rose St Rbt to Shore St Rbt), Southbound
Start time:2nd of August 2024, 11:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A82 NB Between Dunglass Rbt and Milton - Signage on F/W
Location:A82 (A814 Jct to Dunglass Roundabout) to A82 (Dunglass Roundabout to A914 Dumbuck), Northbound
Start time:29th of July 2024, 8:00am
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A82 NB Erskine to Dunglass - Lane Closures
Location:A898 (A898 Northbound Off Slip to A82 Southbound) to A82 (Dunglass Roundabout to Dunglass Roundabout
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A82 NB Old Kilpatrick off slip - Slip Closure
Location:A82 (Erskine Bridge A898 to A814 Jct) to A898 (A82 Southbound Off Slip to A898 Southbound), Northbou
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A82 north- leave A82 for A814- turn left onto A814 Dumbarton Road- turn left onto Station Road- end
A82 NB Old Kilpatrick on slip - Slip Closure
Location:A82 (Erskine Bridge A898 to A814 Jct), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A878 south to great western rd- leave A82 at next exit for mountblow rd- take 1st right for A82 north- end
A82 NB off slip to Erskine Bridge - Slip Closure
Location:A898 (A82 Northbound Off Slip to Start Of Bridge), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A82 North - circle Dunglass Rbt and take South exit - leave A82 Erskine off slip- end
A82 North of Kingshouse Hotel NB - Road Closure
Location:A82 (Junc To Glenetive to Start Crash Barrier), Northbound
Start time:27th of March 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Via A828 & A85
A82 North of Kingshouse Hotel SB - Road Closure
Location:A82 (Junc To Glenetive to Start Crash Barrier), Southbound
Start time:27th of March 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Diversion via A828 & A85
A82 Pulpit Rock South of Ardlui NB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station), Northbound
Start time:4th of July 2024, 11:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Pulpit Rock South of Ardlui SB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station), Southbound
Start time:4th of July 2024, 11:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Rathliesbeg South of Invergloy NB - TTL
Location:A82 (B8004 Jct to Glengloy Jct), Northbound
Start time:5th of August 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Rathliesbeg South of Invergloy SB - TTL
Location:A82 (B8004 Jct to Glengloy Jct), Southbound
Start time:5th of August 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 SB off slip to Erskine Bridge - Slip Closure
Location:A898 (A82 Southbound Off Slip to A898 Southbound) to A898 (A898 S/Bound to Start Of Bridge), Southbo
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A82 South- leave A82 at slip for Mountblow Road- take 1st right and rejoin A82 North- leave A82 North for Erskine Br- end
A82 SB to A898 - Total Closure
Location:A898 (A82 Southbound Off Slip to A898 Southbound) to A898 (A898 S/Bound to Start Of Bridge), Southbo
Start time:6th of August 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
Follow Diversion Signs A82 SB - exit Mountblow Rd- Jion A82 NB - exit onto A898 - End
A82 South of Glencoe Village NB - Convoy Works
Location:A82 (Rd To Clachaig Ho to 09740), Northbound
Start time:2nd of September 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A82 South of Glencoe Village SB - Convoy Works
Location:A82 (Rd To Clachaig Ho to 09740), Southbound
Start time:2nd of September 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A82 South of Orchy Jnct Bridge of Orchy NB - TTL
Location:A82 (Ms Coille B/Liath to Ms Clach A Bhein), Northbound
Start time:5th of August 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 South of Orchy Jnct Bridge of Orchy SB - TTL
Location:A82 (Ms Coille B/Liath to Ms Clach A Bhein), Southbound
Start time:5th of August 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Spean Bridge NB - TTL
Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Northbound
Start time:8th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Spean Bridge SB - TTL
Location:A82 (A86 Jct to B8004 Jct) to A82 (Spean Br Sign to A86 Jct), Southbound
Start time:8th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Stronaba North of Spean Bridge NB - TTL
Location:A82 (B8004 Jct to Glengloy Jct), Northbound
Start time:1st of August 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Stronaba North of Spean Bridge SB - TTL
Location:A82 (B8004 Jct to Glengloy Jct), Southbound
Start time:1st of August 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Tychat North of Drumnadrochit - TTL
Location:A82 (A831 Drumnadrochit Bridge to 12ml Milestone), Northbound
Start time:4th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Tychat North of Drumnadrochit NB - Road Closure with Amnesties
Location:A82 (A831 Drumnadrochit Bridge to 12ml Milestone), Northbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0000, 0200 and 0400
A82 Tychat North of Drumnadrochit SB - Road Closure with Amnesties
Location:A82 (A831 Drumnadrochit Bridge to 12ml Milestone), Southbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0000, 0200 and 0400
A82 Tyndrum NB - TTL
Location:A82 (Fillan Bridge to A85 Jct), Northbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Tyndrum SB - TTL
Location:A82 (Fillan Bridge to A85 Jct), Southbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A82 at Dunglass Rbt - lane closure
Location:A82 (Dunglass Roundabout to Dunglass Roundabout), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A828 Appin - Stop/Go Works
Location:A828 (Achnacona Croft to Jct C27), Northbound
Start time:6th of August 2024, 9:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A828 Barcaldine NB - TTL
Location:A828 (B845 Junction to Creagan Bridge South Roundabout), Northbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A828 Barcaldine SB - TTL
Location:A828 (B845 Junction to Creagan Bridge South Roundabout), Southbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A828 Beinn Sgluish North of Appin - Stop/Go Works
Location:A828 (Milestone to Mile Stone) to A828 (Highland Council Bdy to Inshaig Br), Northbound
Start time:5th of August 2024, 9:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A828 Glenachulish South of Ballachulish NB - TTL
Location:A828 (Inshaig Br to Under Ballachulish Br) to A828 (Under Ballachulish Br to Ballachulish Br R/Bout)
Start time:9th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A828 Glenachulish South of Ballachulish SB - TTL
Location:A828 (Under Ballachulish Br to Ballachulish Br R/Bout) to A828 (Inshaig Br to Under Ballachulish Br)
Start time:9th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Airport Jnct Kilchenzie North of Campbeltown NB - Road Closure with Amnesties
Location:A83 (Tangy Lodge Junc to Airport Junc) to A83 (Airport Junction to Ballywilline Junc), Northbound
Start time:7th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2200, 0000, 0200 & 0400
A83 Airport Jnct Kilchenzie North of Campbeltown SB - Road Closure with Amnesties
Location:A83 (Tangy Lodge Junc to Airport Junc) to A83 (Airport Junction to Ballywilline Junc), Southbound
Start time:7th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2200, 0000, 0200 & 0400
A83 Ardrishaig NB - TTL
Location:A83 (30mph Ardrishaig Sth to B8024 Kilberry Jct), Northbound
Start time:8th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A83 Ardrishaig SB - TTL
Location:A83 (30mph Ardrishaig Sth to B8024 Kilberry Jct), Southbound
Start time:8th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A83 Arrochar to Tarbet NB - TTL
Location:A83 (Tarbet to A814 Jct), Northbound
Start time:29th of July 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Arrochar to Tarbet SB - TTL
Location:A83 (Tarbet to A814 Jct), Southbound
Start time:29th of July 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Bellochantuy South of Glenbarr NB - TTL
Location:A83 (Killiegruer Junc to Argyll Hotel), Northbound
Start time:12th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Bellochantuy South of Glenbarr SB - TTL
Location:A83 (Killiegruer Junc to Argyll Hotel), Southbound
Start time:12th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Campbeltown NB - Road Closure with Amnesties
Location:A83 (Airport Junction to Ballywilline Junc) to A83 (Ballywilline Junc to B842 Junc), Northbound
Start time:15th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2200, 0000, 0200 & 0400
A83 Campbeltown SB - Road Closure with Amnesties
Location:A83 (Airport Junction to Ballywilline Junc) to A83 (Ballywilline Junc to B842 Junc), Southbound
Start time:15th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesty at 2000, 2200, 0000, 0200 & 0400
A83 Drumore Farm North of Campbeltown NB - Road Closure with Amnesties
Location:A83 (Airport Junction to Ballywilline Junc), Northbound
Start time:30th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2200, 0000, 0200 & 0400
A83 Drumore Farm North of Campbeltown SB - Road Closure with Amnesties
Location:A83 (Airport Junction to Ballywilline Junc), Southbound
Start time:30th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2200, 0000, 0200 & 0400
A83 Dunderave North of Inveraray NB - Road Closure
Location:A83 (Clachan Fm Acc to Dunderave Castle), Northbound
Start time:19th of August 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
via A82, A85 & A819
A83 Dunderave North of Inveraray SB - Road Closure
Location:A83 (Clachan Fm Acc to Dunderave Castle), Southbound
Start time:19th of August 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
via A82, A85, A819
A83 Erines NB - TTL
Location:A83 (Sth Lodge Br. to B8024 Glenralloch Jct), Northbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Erines SB - TTL
Location:A83 (Sth Lodge Br. to B8024 Glenralloch Jct), Southbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Fyne Cairndow NB - TTL
Location:A83 (Start Fyne Br. to Clachan Fm Acc), Northbound
Start time:5th of August 2024, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Fyne Cairndow SB - TTL
Location:A83 (Start Fyne Br. to Clachan Fm Acc), Southbound
Start time:5th of August 2024, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Inveraray NB - TTL
Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Northbound
Start time:8th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Inveraray SB - TTL
Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Southbound
Start time:8th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Succoth Arrochar NB - TTL
Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Northbound
Start time:3rd of July 2024, 9:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Succoth Arrochar SB - TTL
Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Southbound
Start time:3rd of July 2024, 9:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Tarbert - Seafood Festival Event
Location:A83 (Garvel Rd to A8015 Tarbert Pier Rd) to A83 (30mph Tarbert (N) to Garvel Rd), Northbound
Start time:6th of July 2024, 1:00pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
A83 Taylors Bay Inverneil NB - TTL
Location:A83 (B8024 Kilberry Jct to Stronachullin Br.), Northbound
Start time:8th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Taylors Bay Inverneil SB - TTL
Location:A83 (B8024 Kilberry Jct to Stronachullin Br.), Southbound
Start time:8th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A830 Beoraidbeg North of Morar NB - TTL
Location:A830 (Morar Jct to B8008 Glasnacardoch Jct), Northbound
Start time:12th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A830 Beoraidbeg North of Morar SB - TTL
Location:A830 (Morar Jct to B8008 Glasnacardoch Jct), Southbound
Start time:12th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A830 East of Beasdale - Convoy
Location:A830 (30mph Restriction Sign to Beasdale Station), Westbound
Start time:5th of August 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A830 East of Glenfinnan EB - Road Closure with Amnesties
Location:A830 (Dubh Lighe Br to Glenfinnan Sign), Eastbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2100, 2200, 2300, 0000, 0200 & 0400
A830 East of Glenfinnan WB - Road Closure with Amnesties
Location:A830 (Dubh Lighe Br to Glenfinnan Sign), Westbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2100, 2200, 2300, 0000, 0200 & 0400
A830 Loch Eil West of Corpach - Convoy Works
Location:A830 (Lhinnie C'Van Pk to 1st Ent Fassfearn), Westbound
Start time:22nd of July 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A833 Mausdale North of Campbeltown NB - TTL
Location:A83 (Muasdale Bridge to Glenbarr Junction), Northbound
Start time:4th of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A833 Mausdale North of Campbeltown SB - TTL
Location:A83 (Muasdale Bridge to Glenbarr Junction), Southbound
Start time:4th of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Garve - Stop/Go Works
Location:A835 (1 Mile West Of Tarvie to Garve Level Xing), Eastbound
Start time:4th of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Stop/Go Boards Traffic Control.
A835 Garve EB - TTL
Location:A835 (Garve Level Xing to A832 Gorstan Jct) to A835 (1 Mile West Of Tarvie to Garve Level Xing), Eas
Start time:13th of July 2024, 9:00pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Garve WB - TTL
Location:A835 (1 Mile West Of Tarvie to Garve Level Xing) to A835 (Garve Level Xing to A832 Gorstan Jct), Wes
Start time:13th of July 2024, 9:00pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Inchbae EB - TTL
Location:A835 (Inchbae Lodge to 150m Past Black Br), Eastbound
Start time:8th of July 2024, 7:00am
Description:Works:
Bridge Joint Repairs, Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A835 Inchbae WB - TTL
Location:A835 (Inchbae Lodge to 150m Past Black Br), Westbound
Start time:8th of July 2024, 7:00am
Description:Works:
Bridge Joint Repairs, Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A835 Inverlael Farm - Convoy Works
Location:A835 (A832 Braemore Jct to Inverlael Farm) to A835 (Inverlael Farm to 600m Past A/Nich), Westbound
Start time:15th of July 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working.
A835 Lael West of Braemore EB - TTL
Location:A835 (A832 Braemore Jct to Inverlael Farm), Eastbound
Start time:8th of July 2024, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Lael West of Braemore WB - TTL
Location:A835 (A832 Braemore Jct to Inverlael Farm), Westbound
Start time:8th of July 2024, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Loch Broom East of Inverlael EB - TTL
Location:A835 (A832 Braemore Jct to Inverlael Farm), Eastbound
Start time:5th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Loch Broom East of Inverlael WB - TTL
Location:A835 (A832 Braemore Jct to Inverlael Farm), Westbound
Start time:5th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Tore EB - TTL
Location:A835 (Tore Rbt to B9169 Culbokie Jct), Eastbound
Start time:18th of July 2024, 7:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Tore Rnbt Inverness to Contin - Event
Location:A835 (Tore Rbt to B9169 Culbokie Jct) to A835 (A834 Jct to Lay-By Past C/Darroch), Westbound
Start time:25th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A835 Tore WB - TTL
Location:A835 (Tore Rbt to B9169 Culbokie Jct), Westbound
Start time:18th of July 2024, 7:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Ardchyle West of Tyndrum EB - TTL
Location:A85 (Gleann Dubh Br. to Ledcharrie Burn Br.), Eastbound
Start time:5th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Ardchyle West of Tyndrum WB - TTL
Location:A85 (Gleann Dubh Br. to Ledcharrie Burn Br.), Westbound
Start time:5th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Ardveich House East of Lochearnhead EB - TTL
Location:A85 (Ardveich Acc to 40 Mph Signs) to A85 (Stirling County Bdy to Ardveich Acc), Eastbound
Start time:29th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Ardveich House East of Lochearnhead WB - TTL
Location:A85 (Stirling County Bdy to Ardveich Acc) to A85 (Ardveich Acc to 40 Mph Signs), Westbound
Start time:29th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Bridge of Awe East of Taynuilt EB - Convoy Works
Location:A85 (M.S. Jct Lorn Area to Ward Bndy), Eastbound
Start time:22nd of July 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Convoy Working (10mph)
A85 Bridge of Awe WB East of Taynuilt - Convoy Works
Location:A85 (M.S. Jct Lorn Area to Ward Bndy), Westbound
Start time:22nd of July 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Convoy Working (10mph)
A85 Burnbrae West of Braegum - Convoy Works
Location:A85 (U5 To Keillour (West) to C460 To Madderty), Westbound
Start time:10th of July 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A85 Clifton EB - TTL
Location:A85 (Stirling/Argyle Bndy to M.S Nr Arinabea) to A85 (A85 Jct to Stirling/Argyle Bndy), Eastbound
Start time:15th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Clifton WB - TTL
Location:A85 (A85 Jct to Stirling/Argyle Bndy) to A85 (Stirling/Argyle Bndy to M.S Nr Arinabea), Westbound
Start time:15th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Comrie - Event
Location:A85 (30 Mph E Of Comrie to B827 Jct) to A85 (U198 Pb At Quoig to 30 Mph E Of Comrie), Eastbound
Start time:20th of July 2024, 6:00pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
A85 Comrie EB - TTL
Location:A85 (B827 Jct to U199 Glenednock Rd) to A85 (30 Mph E Of Comrie to B827 Jct), Eastbound
Start time:30th of July 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Comrie WB - TTL
Location:A85 (30 Mph E Of Comrie to B827 Jct) to A85 (B827 Jct to U199 Glenednock Rd), Westbound
Start time:30th of July 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Comrie to St Fillans - Stop/Go Works
Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie) to A85 (C470 S Lochearn Rd to 30 Mph W Of St.Fillans),
Start time:4th of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Stop/Go Boards Traffic Control.
A85 Crainlarich EB - TTL
Location:A85 (A82 Junction to Crianlarich Nrth R/About), Eastbound
Start time:5th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Crainlarich WB - TTL
Location:A85 (A82 Junction to Crianlarich Nrth R/About), Westbound
Start time:5th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Crianlarich EB - TTL
Location:A85 (A82 Junction to Crianlarich Nrth R/About), Eastbound
Start time:5th of August 2024, 8:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Crieff Rd Perth EB - Event
Location:A85 (C410 Huntingtower to C407 Almondbank) to A85 (A85 Rbt East Of A9 to A85 Rbt West Of A9), Eastbo
Start time:19th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A85 Crieff Rd Perth EB - Event
Location:A85 (C410 Huntingtower to C407 Almondbank) to A85 (A85 Rbt East Of A9 to A85 Rbt West Of A9), Eastbo
Start time:5th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A85 Crieff to Comrie - Stop/Go Works
Location:A85 (Rd To Glenturret Distillery to U198 Pb At Quoig) to A85 (30 Mph E Of Comrie to B827 Jct), Westb
Start time:3rd of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Stop/Go Boards Traffic Control.
A85 Cruachan West of Lochawe EB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Eastbound
Start time:8th of July 2024, 7:30pm
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Cruachan West of Lochawe WB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Westbound
Start time:8th of July 2024, 7:30pm
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dalmally EB - TTL
Location:A85 (B8074 Jct Inverlochy to A819 Junction), Eastbound
Start time:15th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dalmally EB - TTL
Location:A85 (B8074 Jct Inverlochy to A819 Junction), Eastbound
Start time:4th of July 2024, 10:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Dalmally WB - TTL
Location:A85 (B8074 Jct Inverlochy to A819 Junction), Westbound
Start time:15th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dalmally WB - TTL
Location:A85 (B8074 Jct Inverlochy to A819 Junction), Westbound
Start time:4th of July 2024, 10:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Dollerie Terrace to Highlandman Loan Crieff - Diversion Signage
Location:A85 (Dollerie Terrace to Church Street) to A85 (30 Mph W Of Gilmerton to C456 Highlandman Loan), Eas
Start time:17th of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A85 Dunira West of Comrie EB - TTL
Location:A85 (U197 Dalchonzie to C470 S Lochearn Rd) to A85 (30 Mph W Of Comrie to U197 Dalchonzie), Eastboun
Start time:29th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dunira West of Comrie WB - TTL
Location:A85 (30 Mph W Of Comrie to U197 Dalchonzie) to A85 (U197 Dalchonzie to C470 S Lochearn Rd), Westboun
Start time:29th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dunollie Road Oban - MLC
Location:A85 (Jct Corran Park Mini Rbt to Jct William St) to A85 (Jct William St to Stafford St), Westbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Lining Works
Traffic Management:
Mobile Lane Closures.
A85 Glen Lochy East of Dalmally EB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Glen Lochy East of Dalmally WB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Glen Lochy West of Tyndrum EB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Eastbound
Start time:4th of July 2024, 12:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Glen Lochy West of Tyndrum WB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound
Start time:4th of July 2024, 12:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Helmsdale NB - TTL
Location:A9 (A897 Jct to Old Caithness Rd) to A9 (Old Caithness Road to Navidale Rbt), Northbound
Start time:15th of July 2024, 8:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Helmsdale SB - TTL
Location:A9 (Old Caithness Road to Navidale Rbt) to A9 (A897 Jct to Old Caithness Rd), Southbound
Start time:15th of July 2024, 8:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Kilmaroig East of Connel - Convoy
Location:A85 (Jct Ardnaskie Wood to A85 Jct), Westbound
Start time:9th of August 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A85 Lix Toll - Stop/Go Works
Location:A85 (A827 Jct to Gleann Dubh Br.), Westbound
Start time:2nd of August 2024, 8:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A85 Loch Awe - Stop/Go Works
Location:A85 (A819 Junction to School Lochawe), Westbound
Start time:22nd of August 2024, 8:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A85 Loch Awe EB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Eastbound
Start time:4th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Loch Awe WB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Westbound
Start time:4th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Lochearnhead - Planned Event
Location:A85 (40 Mph Signs to A84 Junction) to A85 (A84 Junction to Derest Sign), Westbound
Start time:20th of July 2024, 1:00pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
A85 Methven EB - TTL
Location:A85 (C409 To Glenalmond to Church Road), Eastbound
Start time:1st of August 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Methven WB - TTL
Location:A85 (C409 To Glenalmond to Church Road), Westbound
Start time:1st of August 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Oban - Event
Location:A85 (Jct Queens Park Place to Jct A816) to A85 (Stafford St to Corran Hs. Hotel), Eastbound
Start time:21st of July 2024, 9:30am
Description:Works:
Planned Event
Traffic Management:
Road Closure.
A85 St Fillans EB - TTL
Location:A85 (C470 S Lochearn Rd to 30 Mph W Of St.Fillans), Eastbound
Start time:8th of July 2024, 9:30am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 St Fillans WB - TTL
Location:A85 (C470 S Lochearn Rd to 30 Mph W Of St.Fillans), Westbound
Start time:8th of July 2024, 9:30am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 St Fillans to Lochearnhead - Stop/Go Works
Location:A85 (C470 S Lochearn Rd to 30 Mph W Of St.Fillans) to A85 (40 Mph Signs to A84 Junction), Westbound
Start time:5th of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Stop/Go Boards Traffic Control (30mph)
A85 Stone Hill East of Dalmally EB - TTL
Location:A85 (Mile Stone to B8074 Jct Inverlochy), Eastbound
Start time:15th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Stone Hill East of Dalmally WB - TTL
Location:A85 (Mile Stone to B8074 Jct Inverlochy), Westbound
Start time:15th of July 2024, 9:00am
Description:Works:
Lining Works, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Taynuilt EB - TTL
Location:A85 (Police Stat Taynuilt to Jct Ardnaskie Wood) to A85 (Ward Bndy to Police Stat Taynuilt), Eastbou
Start time:15th of July 2024, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Taynuilt WB - TTL
Location:A85 (Ward Bndy to Police Stat Taynuilt) to A85 (Police Stat Taynuilt to Jct Ardnaskie Wood), Westbou
Start time:15th of July 2024, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 West of Loch Awe EB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Eastbound
Start time:8th of July 2024, 7:00am
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A85 West of Loch Awe WB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Westbound
Start time:8th of July 2024, 7:00am
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A86 Aberarder - Stop/Go Works
Location:A86 (Aberarder to Rubha Na Magach), Westbound
Start time:3rd of July 2024, 12:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A86 Craigbeg East of Roughburn - Stop/Go Works
Location:A86 (Lochaber Bdy to Tulloch Stat Sth Acc), Westbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A86 Cruinnichidh West of Murlaggan - Vergeworks
Location:A86 (Cille Choiril Church Acc to Speed Rest Roybridge), Eastbound
Start time:3rd of July 2024, 2:00pm
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A86 March Cottage Inverroy - Convoy Works
Location:A86 (Speed Derest Roybridge to Speed Rest Spean Br.), Westbound
Start time:2nd of August 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A86 Murlaggan EB - TTL
Location:A86 (Tulloch Stat Sth Acc to Cille Choiril Church Acc), Eastbound
Start time:15th of July 2024, 7:00am
Description:Works:
Ancillary Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A86 Murlaggan WB - TTL
Location:A86 (Tulloch Stat Sth Acc to Cille Choiril Church Acc), Westbound
Start time:15th of July 2024, 7:00am
Description:Works:
Ancillary Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A86 Tirindrish West of Inverroy - Convoy Works
Location:A86 (Speed Derest Roybridge to Speed Rest Spean Br.), Westbound
Start time:29th of July 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A87 Faichern Bend Invergarry EB - Road Closure with Amnesties
Location:A87 (Invergarry P.O. to Kinlochourn Jct), Eastbound
Start time:24th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties.
Diversion Information:
NO DIVERSION -
Amnesties - 2000, 2100, 2200, 2300, 0000, 0200, 0400
A87 Faichern Bend Invergarry WB - Road Closure with Amnesties
Location:A87 (Invergarry P.O. to Kinlochourn Jct), Westbound
Start time:24th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties - 2000, 2100, 2200, 2300, 0000, 0200, 0400
A876 EB Higgins Neuk Roundabout. Lane closure.
Location:A876 (Bowtrees Int to Higgins Neuk Rbt) to A876 (Higgins Neuk Rbt to South End Of Clackman Bridge),
Start time:15th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
A876 WB Higgins Neuk Roundabout. Lane closure.
Location:A876 (Higgins Neuk Rbt to Higgins Neuk Rbt) to A876 (Higgins Neuk Rbt to Bowtrees Int), Westbound
Start time:11th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
A887 Invermoriston EB - TTL
Location:A887 (A82 Jct to Speed Derest), Eastbound
Start time:3rd of July 2024, 8:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A887 Invermoriston WB - TTL
Location:A887 (A82 Jct to Speed Derest), Westbound
Start time:3rd of July 2024, 8:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A889 Dalwhinnie - Stop/Go Works
Location:A889 (Speed Rest to Speed Derest) to A889 (Speed Derest to Allt Breackachy Br.), Northbound
Start time:5th of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A889 Dalwhinnie NB - TTL
Location:A889 (Speed Derest to Allt Breackachy Br.), Northbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A889 Dalwhinnie SB - TTL
Location:A889 (Speed Derest to Allt Breackachy Br.), Southbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A889 Dochaid Abhacain Dalwhinnie - TTL
Location:A889 (A9 Jct to Speed Rest), Southbound
Start time:5th of August 2024, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A898 On slip NB Lane Closures
Location:A898 (A726 Rbt to On Slip To A898), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A898 Erskine Bridge NB - Convoy Working
Location:A898 (M898 to Start Of Cycle Way) to A898 (Start Of Bridge to End Of Bridge), Northbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Convoy Working (10mph)
A898 Erskine Bridge SB - Convoy Working
Location:A898 (Start Of Bridge to End Of Bridge), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
05/07/2024 - Convoy Working( 10mph), 06/07/2024 - Convoy Working( 10mph), 19/07/2024 - Convoy Working, 20/07/2024 - Convoy Working, 09/08/2024 - Convoy Working( 10mph), 10/08/2024 - Convoy Working( 10mph), 23/08/2024 - Convoy Working( 10mph), 24/08/2024 - Convoy Working( 10mph), 13/09/2024 - Convoy Working( 10mph), 14/09/2024 - Convoy Working( 10mph)
A898 NB Off slip to the Spectacles Total Closure
Location:M898 (Craigend O'Bridge to A726 Rbt) to M898 (Slip Off From M898 Sb to A726 Rbt), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
Diversion Information:
Follow Diversion A898 Nb over Bridge - A82SB - Exit Mountblow Rd - Join A82 Nb - Exit onto A898 SB - Exit to A726
A898 SB on slip to A82 SB Slip Closure
Location:A898 (A898 Northbound Off Slip to A82 Southbound), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow A82 North to Dunglass rbt- circle rbt and rejoin A82 South- end
A898 off slip from Erskine Br to A82 NB - Slip Closure
Location:A898 (A898 Northbound Off Slip to A82 Northbound), Northbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A82 south Great Western Rd - leave A82 at next exit for Mountblow Rd - take 1st right for A82 north- end
A9 / A820 Stockbridge, Dunblane - N/B onslip closure
Location:A9 (A820 Jct to On Slip To A9), Northbound
Start time:12th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic from A820 wishing to go north directed to travel south on the A9 to Keir Roundabout then return north through contraflow
A9 / B8033 On-Slip Dunblane - Road Closure
Location:A9 (Island Nosing to T Junction) to A9 (B8033 Junction to Council Bdy), Northbound
Start time:17th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Diversion for N/B Traffic will be via the B8033 Jct with A9T to head South to the Stockbridge Interchange and return to the A9 via A820 and A9 On-Slip.
5.9km
A9 Aberuthven Jct - N/B Lane 1 closure
Location:A9 (Abbey Rd Br. to A824 Jct Aberuthven) to A9 (Aberuthven Jct to Abbey Rd Br.), Northbound
Start time:8th of July 2024, 7:30pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A9 Aberuthven Jct - S/B Lane 1 closure
Location:A9 (Burnside Lodge to Aberuthven Jct) to A9 (Aberuthven Jct to Abbey Rd Br.), Southbound
Start time:8th of July 2024, 7:30pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A9 Aberuthven- signage SB
Location:A9 (A824 Jct Aberuthven to Burnside Lodge) to A9 (Auchterarder Jct to A823 Flyover), Southbound
Start time:1st of August 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Allan Water Bridge to Stockbridge, Dunblane - S/B Contraflow
Location:A9 (B8033 Junction to Off Slip To A820) to A9 (On Slip From A820 to Keir Rbt), Southbound
Start time:11th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
11/07/2024 - Lane Closure( 50mph), 12/07/2024 - Lane Closure( 50mph), 12/07/2024 - Contraflow( 50mph), 13/07/2024 - Contraflow( 50mph), 14/07/2024 - Contraflow( 50mph), 15/07/2024 - Contraflow( 50mph), 15/07/2024 - Lane Closure( 50mph), 16/07/2024 - Lane Closure( 50mph)
A9 Allan Water, Dunblane - S/B Lane 1 convoy
Location:A9 (B8033 Junction to Off Slip To A820) to A9 (Aberuthven Jct to Abbey Rd Br.), Southbound
Start time:11th of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Convoy Working.
A9 Approaching Inveralmond Rnbt Perth SB - Event
Location:A9 (End Dual Cway to Jct (R) To Luncarty) to A9 (Inveralmond Rbt to Inveralmond Rbt), Southbound
Start time:19th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Approaching Inveralmond Rnbt Perth SB - Event
Location:A9 (End Dual Cway to Jct (R) To Luncarty) to A9 (Inveralmond Rbt to Inveralmond Rbt), Southbound
Start time:5th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Auchterarder Jct - N/B Lane 2 closure
Location:A9 (A823 Flyover to Auchterarder Jct Nb) to A9 (Aberuthven Jct to Abbey Rd Br.), Northbound
Start time:9th of July 2024, 7:30pm
Description:Works:
Kerbing Works
Traffic Management:
Lane Closure.
A9 Auchterarder- Lane Closure N/B
Location:A9 (A823 Flyover to B8081 Blackford) to A9 (Auchterarder Jct to A823 Flyover), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Auchterarder- Lane Closure S/B
Location:A9 (Auchterarder Jct to A823 Flyover) to A9 (End Slip,Blackford to A823 Flyover), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Balhaldie- NLC N/B
Location:A9 (Council Bdy to A822 Jct), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Mobile Lane Closures.
A9 Ballinluig NB - Lane Closure
Location:A9 (Start Of Dual C/Way to A827 Jct Nb), Northbound
Start time:17th of July 2024, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure (30mph)
A9 Ballinluig Offslip NB - Lane Closure
Location:A9 (Gartymore Jct to A897 Jct) to A9 (Slip Off From A9 To A827 Rbt to A827 Rbt), Northbound
Start time:22nd of July 2024, 9:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Lane Closure (50mph)
A9 Ballinluig Onslip NB - Lane Closure
Location:A9 (A827 Rbt to Slip On To A9), Northbound
Start time:22nd of July 2024, 9:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Lane Closure (50mph)
A9 Ballinluig to Pitlochry NB - Diversion Signage
Location:A9 (Start Of Dual C/Way to A827 Jct Nb) to A9 (W/B Off Slip - 1 Lane to W/B Off Slip - 2 Lane), Nort
Start time:18th of July 2024, 9:30am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Ballinluig to Pitlochry NB - Diversion Signage
Location:A9 (Start Of Dual C/Way to A827 Jct Nb) to A9 (A924 Off Slip to End Of Dual Cway), Northbound
Start time:8th of July 2024, 8:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Ballinluig to Pitlochry SB - Diversion Signage
Location:A9 (A924 Off Slip to End Of Dual Cway) to A9 (A827 Jct to A924 Off Slip), Southbound
Start time:18th of July 2024, 9:30am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Ballinluig to Pitlochry SB - Diversion Signage
Location:A9 (A924 Off Slip to End Of Dual Cway) to A9 (A827jct to End Of Dual Cway Sb), Southbound
Start time:8th of July 2024, 8:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Banniskirk North of Spittal NB - TTL
Location:A9 (Jct B870 Mybster to Jct C4 Achalone) to A9 (Jct C4 Achalone to A882 Jct Georgemas), Northbound
Start time:15th of July 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Banniskirk North of Spittal SB - TTL
Location:A9 (Jct C4 Achalone to A882 Jct Georgemas), Southbound
Start time:15th of July 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Berridale - Stop/Go Works
Location:A9 (P.O. Berriedale to S Jct Newport), Southbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Stop/Go Boards Traffic Control.
A9 Berridale NB - TTL
Location:A9 (Snowgates Berriedale to P.O. Berriedale), Northbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Berridale SB - TTL
Location:A9 (Snowgates Berriedale to P.O. Berriedale), Southbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Blackford - MLC N/B
Location:A9 (End Slip,Blackford to A823 Flyover), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Mobile Lane Closures.
A9 Blackford- MLC S/B
Location:A9 (A823 Flyover to B8081 Blackford) to A9 (U/C To Tarneybackle to B8081 Blackford), Southbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Lane Closure.
A9 Blueton Farm, Nth of Greenloaning - N/B Lane 1 convoy
Location:A9 (A822 Jct to U/C To Tarneybackle) to A9 (Aberuthven Jct to Abbey Rd Br.), Northbound
Start time:10th of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Convoy Working.
A9 Broxden Rbt - Lane closures
Location:A9 (Broxden Rbt to Broxden Rbt), Northbound
Start time:2nd of September 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure (50mph)
A9 Broxden Rbt- N/B Verge Works
Location:A9 (Broxden Rbt to Broxden Rbt) to M90 (On Slip to A9 Broxden Rbt), Northbound
Start time:12th of July 2024, 7:30pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Broxden- Signage only- S/B
Location:A9 (A85 O'Br/Ent Slip to Broxden Rbt) to A9 (Broxden Rbt to Broxden Rbt), Southbound
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Cairnie Braes, Perth - N/B Lane 1 closure
Location:A9 (A824 Jct Aberuthven to Burnside Lodge) to A9 (Burnside Lodge to Aberuthven Jct), Northbound
Start time:4th of July 2024, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A9 Castlehill South of Dunbeath - Stop/Go Works
Location:A9 (Jct Ramscraigs to Jct Braemore), Northbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A9 Craigrory South of Tore NB - Lane Closure
Location:A9 (Allangrange Jct to Tore Rbt), Northbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure (50mph)
A9 Dalmore Alness NB - TTL
Location:A9 (B9176 Struie Jct to B817 Dalmore Jct), Northbound
Start time:4th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalmore Alness SB - TTL
Location:A9 (B9176 Struie Jct to B817 Dalmore Jct), Southbound
Start time:4th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalnabo Ballinluig NB - Lane Closure
Location:A9 (Start Of Dual C/Way to A827 Jct Nb), Northbound
Start time:23rd of July 2024, 9:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Lane Closure (50mph)
A9 Dalnabo Ballinluig SB - Lane Closure
Location:A9 (A827jct to End Of Dual Cway Sb), Southbound
Start time:23rd of July 2024, 9:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Lane Closure (50mph)
A9 Dalnamein North of Calvine NB - TTL
Location:A9 (B847 Calvine Jct to Start Dual Calvine), Northbound
Start time:8th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalnamein North of Calvine SB - TTL
Location:A9 (B847 Calvine Jct to Start Dual Calvine), Southbound
Start time:8th of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dornoch - Stop/Go Works
Location:A9 (Clashmore Jct to A949 Dornoch Jct) to A9 (A949 Dornoch Jct to Birichin Jct), Northbound
Start time:3rd of July 2024, 11:00am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A9 Drumochter NB - Convoy Works
Location:A9 (Start Of Dual to Trinafour Jct) to A9 (Trinafour Jct to End Dual Nb), Northbound
Start time:10th of July 2024, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A9 Dunkeld - Signage Only
Location:A9 (A923 Jct to B898 Jct), Southbound
Start time:5th of July 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Forteviot Jct - N/B Lane 2 closure
Location:A9 (A824 Jct Aberuthven to Burnside Lodge) to M90 (On Slip to A9 Broxden Rbt), Northbound
Start time:12th of July 2024, 7:30pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A9 Gleneagles MLC- S/B
Location:A9 (Auchterarder Jct to A823 Flyover) to A9 (A823 Flyover to B8081 Blackford), Southbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Lane Closure.
A9 Gleneagles- MLC N/B
Location:A9 (A823 Flyover to Auchterarder Jct Nb) to A9 (Auchterarder Jct Nb to Abbey Rd Br.), Northbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Mobile Lane Closures.
A9 Gleneagles. S/B off slip closure.
Location:A9 (Auchterarder Jct to A823 Flyover) to A9 (Sb Slip Off to A823 Junction), Southbound
Start time:23rd of September 2024, 7:30pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
A9 Inver Dunkeld NB - TTL
Location:A9 (A923 Jct to B898 Jct) to A9 (B898 Jct to Jct (R) To Guay), Northbound
Start time:14th of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Priority System Traffic Control.
A9 Inver Dunkeld SB - TTL
Location:A9 (A923 Jct to B898 Jct), Southbound
Start time:14th of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Priority System Traffic Control.
A9 Inveralmond Perth to Stanley Interchange NB - Diversion Signage
Location:A9 (Inveralmond Rbt to End Dual Cway) to A9 (Junction Right To Luncarty to Start Of Dual Carriageway
Start time:3rd of July 2024, 9:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Inveralmond Perth to Stanley Interchange SB - Diversion Signage
Location:A9 (Junction Right To Luncarty to Start Of Dual Carriageway) to A9 (Inveralmond Rbt to Inveralmond R
Start time:3rd of July 2024, 9:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Layby 32 North of Luncarty NB - Lane Closure
Location:A9 (End Dual Cway to Jct (R) To Luncarty), Northbound
Start time:15th of July 2024, 9:30am
Description:Works:
Layby Occupation
Traffic Management:
Lane Closure (30mph)
A9 Layby 66 Drumochter NB - Convoy Works
Location:A9 (Start Dual Calvine to Trinafour Jct), Northbound
Start time:24th of July 2024, 7:00pm
Description:Works:
Lining Works, Resurfacing
Traffic Management:
Convoy Working (10mph)
A9 Longman Rnbt Inverness - MLC
Location:A9 (Longman Rbt to Longman Rbt), Northbound
Start time:4th of July 2024, 7:00pm
Description:Works:
Gully Emptying
Traffic Management:
Mobile Lane Closures.
A9 Luncarty NB - Lane Closure
Location:A9 (End Dual Cway to Inveralmond Rbt), Northbound
Start time:1st of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure (50mph)
A9 Luncarty Off-Slip NB - Full Closure
Location:A9 (Slip Road Off to Start Of 2 Lane Slip) to A9 (Start Of 2 Lane Slip to B8063 Jct), Northbound
Start time:1st of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Road Closure (50mph)
Diversion Information:
A9 to Stanley Interchange there after B9099
A9 Luncarty On-Slip NB - Full Closure
Location:A9 (Start Of 2 Lane Slip to B8063 Jct) to A9 (Inveralmond Rbt to End Dual Cway), Northbound
Start time:1st of July 2024, 7:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Road Closure (50mph)
Diversion Information:
Follow A9 South to Inveralmond Roundabout, thereafter A9 North
A9 Meikle Ferry Rnbt Dornoch NB - TTL
Location:A9 (Dornoch Br Rbt to Start Dornoch Br), Northbound
Start time:15th of July 2024, 7:00pm
Description:Works:
Landscape Maintenance, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Meikle Ferry Rnbt Dornoch SB - TTL
Location:A9 (Dornoch Br Rbt to Start Dornoch Br) to A9 (Dornoch Br Rbt to Dornoch Br Rbt), Southbound
Start time:15th of July 2024, 7:00pm
Description:Works:
Landscape Maintenance, Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Millennium Foot Bridge Dalnsapidal NB - Footway Works Only
Location:A9 (Trinafour Jct to End Dual Nb), Northbound
Start time:15th of July 2024, 7:00am
Description:Works:
Footway Works
Traffic Management:
Works Entirely on Footway.
A9 N/B Balhaldie - Convoy
Location:A9 (B8033 Junction to Council Bdy), Northbound
Start time:17th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (50mph)
A9 N/B Towards Broxden Rbt - N/B Lane 1 closures
Location:A9 (Burnside Lodge to Broxden Rbt) to A9 (Broxden Rbt to Broxden Rbt), Northbound
Start time:16th of September 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure (50mph)
A9 North of A820 Jct, Dunblane. S/B lane closure
Location:A9 (On Slip From A820 to Keir Rbt), Southbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Lane Closure.
A9 North of Keir Rbt, Dunblane. N/B lane closure
Location:A9 (Keir Rbt to Off Slip To A820), Northbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Lane Closure.
A9 North of Keir Rbt. S/B lane closure
Location:A9 (On Slip From A820 to Keir Rbt), Southbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Lane Closure.
A9 Raigmore to Longman Rnbt Inverness NB - Diversion Signage
Location:A9 (Inshes Flyover to Raigmore Interchange Roundabout) to A9 (Longman Rbt to Longman Rbt), Northboun
Start time:2nd of August 2024, 11:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Raigmore to Longman Rnbt Inverness SB - Diversion Signage
Location:A9 (Longman Rbt to Raigmore Int) to A9 (Raigmore Int Rbt to Inshes Flyover), Southbound
Start time:2nd of August 2024, 11:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Raigmore to Tore Rnbt Inverness NB - Event
Location:A9 (Inshes Flyover to Raigmore Interchange Roundabout) to A9 (Allangrange Jct to Tore Rbt), Northbou
Start time:25th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Raigmore to Tore Rnbt Inverness SB - Event
Location:A9 (Tore Rbt to Allangrange Jct) to A9 (Raigmore Int Rbt to Inshes Flyover), Southbound
Start time:25th of July 2024, 8:00am
Description:Works:
Planned Event
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 S/B from Broxden Rbt - S/B Lane 1 closures
Location:A9 (Broxden Rbt to Burnside Lodge), Southbound
Start time:9th of September 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure (50mph)
A9 South if Bridge of Tacher Achavanich - Convoy Works
Location:A9 (Jct C14 Loch Stemster to Br Of Tacher) to A9 (Br Of Tacher to Jct B870 Mybster), Northbound
Start time:5th of August 2024, 7:00am
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A9 South of Ballinluig NB - TTL
Location:A9 (Jct (R) To Guay to Start Of Dual Cway), Northbound
Start time:5th of August 2024, 7:00pm
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A9 South of Ballinluig SB - TTL
Location:A9 (Jct (R) To Guay to Start Of Dual Cway), Southbound
Start time:5th of August 2024, 7:00pm
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A9 South of Dalwhinnie NB - TTL
Location:A9 (Council Bdy to A889 Dalwhinnie Jct), Northbound
Start time:8th of July 2024, 10:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A9 South of Dalwhinnie SB - TTL
Location:A9 (Council Bdy to A889 Dalwhinnie Jct), Southbound
Start time:8th of July 2024, 10:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A9 South of Daviot NB - Lane Closure
Location:A9 (Start Dual Cway to B851 Ft Aug Jct), Northbound
Start time:3rd of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A9 Stanley Jnct to Inveralmond SB - Signage Only
Location:A9 (Junction Right To Luncarty to Start Of Dual Carriageway) to A9 (End Dual Cway to Inveralmond Rbt
Start time:5th of July 2024, 9:30am
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Station Road Golspie NB - Road Closure with Amnesties
Location:A9 (Ben Bhraggie Dr Golspie to Golspie Burn Br), Northbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0000, 0200 and 0400
A9 Station Road Golspie SB - Road Closure with Amnesties
Location:A9 (Ben Bhraggie Dr Golspie to Golspie Burn Br), Southbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0000, 0200 and 0400
A9 Sth of Whitemoss Jct, Aberuthven - N/B Lane 1 closure
Location:A9 (Abbey Rd Br. to A824 Jct Aberuthven) to A9 (Aberuthven Jct to Abbey Rd Br.), Northbound
Start time:9th of July 2024, 7:30pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A9 Stockbridge to Allan Water Bridge, Dunblane - N/B Contraflow
Location:A9 (Keir Rbt to Off Slip To A820) to A9 (On Slip From A820 to B8033 Junction), Northbound
Start time:11th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
11/07/2024 - Lane Closure( 50mph), 12/07/2024 - Lane Closure( 50mph), 12/07/2024 - Contraflow( 50mph), 13/07/2024 - Contraflow( 50mph), 14/07/2024 - Contraflow( 50mph), 15/07/2024 - Contraflow( 50mph), 15/07/2024 - Lane Closure( 50mph), 16/07/2024 - Lane Closure( 50mph)
A9 Stockbridge- MLC N/B
Location:A9 (On Slip From A820 to B8033 Junction), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Speed camera
Traffic Management:
Mobile Lane Closures.
A9 Tacher North of Spittal - Stop/Go Works
Location:A9 (Br Of Tacher to Jct B870 Mybster), Northbound
Start time:7th of October 2024, 7:00am
Description:Works:
Third Party Works
Traffic Management:
Stop/Go Boards Traffic Control.
A9 Westgarty South of Portgower NB - TTL
Location:A9 (Culgower Br to Old Sch Ho Portgower), Northbound
Start time:8th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Westgarty South of Portgower SB - TTL
Location:A9 (Culgower Br to Old Sch Ho Portgower), Southbound
Start time:8th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9/A823 Gleneagles to A85 N/B off slip
Location:A9 (A823 Junction to End Of Slip) to A85 (A85 Rbt West Of A9 to A85 Rbt West Of A9), Northbound
Start time:16th of August 2024, 9:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Barnhill- Signage only S/B
Location:A90 (Start Circ. Section to End Of Circ. Section) to A90 (Rhs Turn Circ. Section to Start 2-Way Sing
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Craibstone Roundabout - Lane Closure
Location:A96 (Dyce Drive Rbt (W) to Junction (L) B979) to A96 (Junction (R) B979 to Dyce Drive Rbt), Northbou
Start time:17th of July 2024, 7:30pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A90 Crimond- TTL N/B
Location:A90 (Jn R Starnafin to Jn R B9033 St.Combs), Northbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A90 Ellon Diversion signage- N/B
Location:A90 (Start Dual Cway to Ellon Rbt (S)) to A90 (Ellon Roundabout South to Ellon Roundabout North), No
Start time:8th of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Finavon- Lane Closure N/B
Location:A90 (Parkford to Finavon Castle) to A90 (Finavon Castle to Noran Water Br.), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A90 Finavon- Lane Closure S/B
Location:A90 (Noran Water Br to Finavon Castle) to A90 (Finavon Castle to Parkford), Southbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A90 Fourdon- Diversion signage- N/B
Location:A90 (Jn R A937 (N) L/Kirk to Jct B9120 St.Cyrus) to A90 (Jct B966 Fettercairn to Jct B967 Arbuthnott
Start time:8th of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Keithock to Stracathro - N/B Lane 2 closure
Location:A90 (B966 Jct to End Concrete) to A90 (End Concrete to Stracathro Hosp Jct), Northbound
Start time:14th of July 2024, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Lane Closure.
A90 Kingsway, Dundee- Signage N/B
Location:A90 (Myrekirk Rd Rbt to Start Off Slip To A923) to A90 (On Slip From A923 to Start Off Slip To Clep
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Kingsway,Dundee- Diversion signage only N/B
Location:A90 (Under A923 Rbt to On Slip From A923) to A90 (Start Off Slip To Clep Rd Rbt to Under Clep Rd Rbt
Start time:5th of August 2024, 8:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Kinsgway West Dundee- Signage only- N/B
Location:A90 (Swallow Rbt to Myrekirk Rd Rbt), Northbound
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Laurencekirk to Fordoun NB - Diversion signage for local road closure
Location:A90 (A937 Jct (N) L'Kirk to Jct (L) Lr Powburn) to A90 (Jct (L) Lr Powburn to Jct (L) Fordoun), Nort
Start time:6th of July 2024, 8:00pm
Description:Works:
Utility Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Lonmay to Cortes NB - Temporary traffic signals
Location:A90 (Jn R B9033 St. Combs to Start Of One Way (Wb)), Northbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A90 Nth of Glendoick Interchange - N/B Lane 1 closure
Location:A90 (Off Slip B958 to Pitroddie Fm Jct) to A90 (Inchmichael Int to B953 Inchture), Northbound
Start time:2nd of August 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Lane Closure (50mph)
A90 Peterhead NB - Diversion signage for local road closure
Location:A90 (Invernettie Rbt to A950 Rbt), Northbound
Start time:10th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Rait to Inchture - Diversion signage for LC road closure
Location:A90 (Pitroddie Fm Jct to Inchmichael Int) to A90 (Inchmichael Int to B953 Inchture), Northbound
Start time:22nd of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Rait to Inchture NB - Diversion signage for local road closure
Location:A90 (Pitroddie Fm Jct to Inchmichael Int) to A90 (Inchmichael Int to B953 Inchture), Northbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Rathen- TTL N/B
Location:A90 (Jn T A952 Cortes to Jn L B9032 Memsie), Northbound
Start time:31st of July 2024, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A90 South of Hatton - TTL's
Location:A90 (Jn R Leask to Jn X Hatton), Northbound
Start time:15th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 South of Revel Green, Forfar - N/B lane closures under convoy
Location:A90 (B9128 Jct to Parkford), Northbound
Start time:9th of July 2024, 7:30pm
Description:Works:
Drainage Works, Resurfacing
Traffic Management:
09/07/2024 - Convoy Working( 10mph), 10/07/2024 - Convoy Working( 10mph), 10/07/2024 - Convoy Working( 10mph), 11/07/2024 - Convoy Working( 10mph), 11/07/2024 - Convoy Working( 10mph), 12/07/2024 - Convoy Working( 10mph), 14/07/2024 - Convoy Working( 10mph), 15/07/2024 - Convoy Working( 10mph), 15/07/2024 - Convoy Working( 10mph), 16/07/2024 - Convoy Working( 10mph), 16/07/2024 - Convoy Working( 10mph), 17/07/2024 - Convoy Working( 10mph), 17/07/2024 - Convoy Working( 10mph), 18/07/2024 - Convoy Working( 10mph), 18/07/2024 - Convoy Working( 10mph), 19/07/2024 - Convoy Working( 10mph), 21/07/2024 - Convoy Working( 10mph), 22/07/2024 - Convoy Working( 10mph), 22/07/2024 - Convoy Working( 10mph), 23/07/2024 - Convoy Working( 10mph), 23/07/2024 - Convoy Working( 10mph), 24/07/2024 - Convoy Working( 10mph), 24/07/2024 - Convoy Working( 10mph), 25/07/2024 - Convoy Working( 10mph), 25/07/2024 - Convoy Working( 10mph), 26/07/2024 - Convoy Working( 10mph), 28/07/2024 - Convoy Working( 10mph), 29/07/2024 - Convoy Working( 10mph), 29/07/2024 - Convoy Working( 10mph), 30/07/2024 - Convoy Working( 10mph), 30/07/2024 - Convoy Working( 10mph), 31/07/2024 - Convoy Working( 10mph), 31/07/2024 - Convoy Working( 10mph), 01/08/2024 - Convoy Working( 10mph), 01/08/2024 - Convoy Working( 10mph), 02/08/2024 - Convoy Working( 10mph), 05/08/2024 - Lane Closure( 50mph), 06/08/2024 - Lane Closure( 50mph), 07/08/2024 - Lane Closure( 50mph), 08/08/2024 - Lane Closure( 50mph), 09/08/2024 - Lane Closure( 50mph), 12/08/2024 - Lane Closure( 50mph), 13/08/2024 - Lane Closure( 50mph), 14/08/2024 - Lane Closure( 50mph), 15/08/2024 - Lane Closure( 50mph), 16/08/2024 - Lane Closure( 50mph)
A90 South of Stonehaven- Lane Closure N/B
Location:A90 (Jct Candy Fm to Jct (R) Barras) to A90 (Jct (R) Barras to On Slip From A92), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A90 South of Stonehaven- Lane Closure S/B
Location:A90 (Off Slip To A92 to Jct (L) Barras) to A90 (Jct (L) Barras to Jct (R) Candy Fm), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A90 St Fergus - TTL's
Location:A90 (Jn R Gas Terminal to Jn Keyhead), Northbound
Start time:29th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 Swallow Rdbt- Signage only N/B
Location:A90 (Swallow Rbt to Swallow Rbt), Northbound
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Swallow Roundabout Dundee NB - Contraflow
Location:A90 (Longforgan Int to Swallow Roundabout) to A90 (Swallow Rbt to Myrekirk Rd Rbt), Northbound
Start time:8th of July 2024, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
Contraflow.
A90 Swallow Roundabout Dundee SB - Contraflow
Location:A90 (Myrekirk Road Rbt to Swallow Roundabout) to A90 (Swallow Rbt to Longforgan Int), Northbound
Start time:8th of July 2024, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
Contraflow.
A90 Toll of Birness - Diversion signage for LC road closure
Location:A90 (Jn A952 Toll Of Birness to Jn R Leask), Northbound
Start time:22nd of July 2024, 9:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Toll of Birness - N/B TTL's
Location:A90 (Jn A952 Toll Of Birness to Jn R Leask), Northbound
Start time:24th of July 2024, 9:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 West of Alves - E/B Diversion signage for LC road closure
Location:A96 (Jct Kinloss to Forres Enterprise Rbt) to A96 (Jct C4 Cloves to Jct Alves Church), Eastbound
Start time:11th of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90/A926 Forfar - N/B on slip closure
Location:A90 (Nb Slip Off From A90 Kirriemuir to A926 Roundabout Wb) to A90 (A926 Jct to B9128 Jct), Southbou
Start time:29th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
N/B on slip closure – traffic to use the A90 to travel south to the next junction then to turn north to continue their journey
A90/A926 Forfar - S/B off slip closure
Location:A90 (Sb Slip Road Off A90 To A926 Kirriemuir to A926 Kirriemuir) to A90 (Sb Slip Road From A90 Kirri
Start time:1st of August 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
S/B off slip closure - traffic to remain on the A90 to travel south to the next junction then to turn north to continue their journey
A90/A926 Forfar - S/B on slip closure
Location:A90 (Sb Slip Road From A90 Kirriemuir to A926 Roundabout Eb) to A90 (Sb Slip Road On To A90 From A92
Start time:1st of August 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
S/B on slip closure - Traffic to travel north on the A90 to Brechin before returning back
A90/A936 Forfar - N/B off slip closure
Location:A90 (A94 Jct to A926 Jct) to A90 (Nb Slip Off From A90 Kirriemuir to A926 Roundabout Wb), Northbound
Start time:29th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
N/B off slip closure – Traffic to remain on the A90 to Brechin before returning back.
A90/M90 Jct 1 SB at Scotstoun. Road Closure
Location:A90 (Start Of Diverge to 2-Lane Section) to A90 (2-Lane Section to Trunk Rd Limit), Southbound
Start time:1st of July 2024, 8:00am
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Motorway traffic continue M90 to M9 Jct 1A SB off-slip. Take the 1st exit onto A8, continue to Maybury Road then to Barnton re-joining the A90.
EB non-motorway traffic from M90 Jct 1A Queensferry take A904 to Echline Roundabout and take the 3rd exit and use the SB Public Transport Link to re-join the A90.
WB non-motorway traffic take 1st exit onto the SB Public Transport Link to re-join the A90.
A9000 (PTL) - SB - Echline - Road Closure
Location:A90 (Forth Rd Bridge to End Of 2 Lane) to A90 (Echline Jn O/B to Start Of Ded. Lane), Southbound
Start time:12th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
A9000 southbound traffic diverted up off slip to Echline Jct then heading west along the A904 towards Queensferry Jct then join A90 southbound. Follow A90 until Jct 1 and turn off towards Edinburgh.
A9000 (PTL) - SB on slip - Echline - Road Closure
Location:A90 (Echline Roundabout to End Of Sb Slip Rd From Echline Rbt) to A90 (2-Lane Section to Trunk Rd Li
Start time:12th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
A9000 southbound traffic diverted up off slip to Echline Jct then heading west along the A904 towards Queensferry Jct then join A90 southbound. Follow A90 until Jct 1 and turn off towards Edinburgh.
A9000. SB Contraflow.
Location:A90 (Ferrytoll Jn Ub to Frb) to A90 (Forth Rd Bridge to End Of 2 Lane), Southbound
Start time:4th of July 2024, 6:01am
Description:Works:
Structural Repairs
Traffic Management:
Contraflow.
A9000/FRB SB. Road Closed.
Location:A90 (Start Of Roundabout to End Of Roundabout) to A90 (Ferrytoll Jn Ub to Frb), Southbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Traffic will divert onto M90 SB at Jct 1B on-slip.
Non-motorway traffic will be given access.
A92 Cupar- Stop Go - N/B
Location:A92 (Jct C28 Letham to Jct Q50 Fernie) to A92 (Jct Q50 Fernie to Jct Q48 Collairnie), Northbound
Start time:24th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Stop/Go Boards Traffic Control.
A92 Cupar- Stop Go - S/B
Location:A92 (Jct Q50 Fernie to Jct Q48 Collairnie) to A92 (Melville Lodges Rbt to Jct C28 Letham), Southboun
Start time:24th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Stop/Go Boards Traffic Control.
A92 Glenrothes- Lane Closure N/B
Location:A92 (Manhole Opposite Sb Safety Fence to Np Preston Rbt), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A92 Glenrothes- Lane Closure S/B
Location:A92 (Np Preston Rbt to Np Preston Rbt) to A92 (Preston Rbt to M/Hole At Retaining Wall), Southbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A92 Kirkforthar Feus NB - Crossover closure
Location:A92 (Jct C49 Markinch to New Inn Rbt), Northbound
Start time:6th of August 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A92 Kirkforthar Feus SB - Crossover closure
Location:A92 (New Inn Rbt to Jct C49 Markinch), Southbound
Start time:6th of August 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A92 Ladybank- Diversion Signage S/B
Location:A92 (Jct B937 Newburgh to Jct Q61 Charlottetown) to A92 (Np New Inn Rbt to 40mph Freuchie), Southbou
Start time:4th of July 2024, 11:30pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A92 Ladybank- Signage- S/B
Location:A92 (Jct B937 Newburgh to Jct Q61 Charlottetown) to A92 (Jct Q71 Landsend Rd to Jct B937 Newburgh),
Start time:8th of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A92 Lindifferon, South of Parbroath Crossroads - N/B Diversion signage
Location:A92 (Jct Q50 Fernie to Jct Q48 Collairnie) to A92 (Jct Q48 Collairnie to A913 Junction), Northbound
Start time:5th of August 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A92 Nth of Preston Rbt - N/B TTL's
Location:A92 (Preston Roundabout to Tullus Roundabout) to M90 (Entry Slip From A912 to Glenfarg Overbridge),
Start time:3rd of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A92 River Ore Bridge, Thornton, Glenrothes - N/B lane closures
Location:A92 (Redhouse Rbt to River Ore Br) to A92 (River Ore Br to Manhole Nr Reduce Speed Sign), Northbound
Start time:26th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure.
A92 River Ore Bridge, Thornton, Glenrothes - S/B lane closures
Location:A92 (M/Hole 500m Sth Bankhead Rbt to River Ore Bridge) to A92 (River Ore Bridge to Redhouse Rbt), So
Start time:26th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure.
A92 Sth of Cardenden overbridge to Chapel Junction - N/B Lane closures
Location:A92 (On Slip From B9149 to Start Cardenden Viaduct) to A92 (Mid Point Bridges to On Slip A910), Nort
Start time:14th of July 2024, 7:30pm
Description:Works:
Barrier Repair
Traffic Management:
Convoy Working (10mph)
A92 Wester Kinnear, Nth of Kilmany - S/B TTL's
Location:A92 (Jct Q6 Logie to West Kinnear Acc) to M90 (Entry Slip From A912 to Glenfarg Overbridge), Southbo
Start time:3rd of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A92 Wester Kinnear, South of Wormit Jct - TTL's
Location:A92 (Jct Q6 Logie to West Kinnear Acc) to A92 (Easter Kinnear Acc to Jct B946 Sandford), Northbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Advie TTL N/B
Location:A95 (C49 Advie Stat Rd to Moray Boundary), Northbound
Start time:5th of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Ballindalloch - TTL's
Location:A95 (B9008 Tomintoul to B9138 Knockando), Southbound
Start time:4th of July 2024, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Bridge of Avon, Ballindalloch SB - Temporary traffic signals
Location:A95 (B9137 Cragganmore to B9008 Tomintoul), Southbound
Start time:11th of July 2024, 8:00am
Description:Works:
Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Grantown on Spey- No Obstruction N/B
Location:A95 (Jct A938 Carrbridge to Jct A938 Carrbridge) to A95 (Jct A938 Carrbridge to Inverallan Rbt), Nor
Start time:3rd of July 2024, 10:00am
Description:Works:
Pavement Surveys
Traffic Management:
No Obstruction on Carriageway or Footway.
A95 Lower Balnacrue, Boat of Garten - S/B TTL's
Location:A95 (C39 Boat Of Garten to C36 Skye Of Curr Rd), Southbound
Start time:8th of July 2024, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Alexandra Rd/Cumming Street, Elgin - Diversion Signage for LC road closure
Location:A96 (Tesco Roundabout to Tesco Roundabout) to A96 (Cumming St Rbt to Cumming St Rbt Taper), Eastboun
Start time:1st of July 2024, 9:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A96 Alves - E/B TTL's
Location:A96 (Jct C4 Cloves to Jct Alves Church) to A96 (Jct Smiddy Place to Jct C4 Cloves), Eastbound
Start time:24th of July 2024, 7:30pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Alves- MVMS E/B
Location:A96 (Jct Alves Church to Jct Kinloss), Eastbound
Start time:17th of July 2024, 7:30pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A96 Alves- MVMS W/B
Location:A96 (Jct B9013 Burghead to Kinfauns Jct) to A96 (Jct Alves Church to Jct Kinloss), Westbound
Start time:17th of July 2024, 7:30pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A96 Cairnie WB - Temporary traffic signals
Location:A96 (Jcn To Cairnie to South End Of Coachford Cl), Westbound
Start time:4th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Carden Bridge WB - Temporary traffic signals
Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork) to A96 (Jct B9002 Oyne Fork to Jct B992 Insch), Westbound
Start time:9th of July 2024, 7:00am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Cowfords Roundabout, Fochabers- TTL W/B
Location:A96 (End Eb Climbing Lane to Cowfords Rbt) to A96 (Cowfords Rbt to Marchfield Junction), Westbound
Start time:4th of July 2024, 7:30pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Craibstone EB - Lane closure
Location:A96 (Junction (R) B979 to Dyce Drive Rbt), Eastbound
Start time:17th of July 2024, 7:30pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A96 Elgin -TTL W/B
Location:A96 (End Safety Fence R to Cumming St Rbt) to A96 (Start Of Safety Fence to Tesco Roundabout), Westb
Start time:3rd of July 2024, 7:30pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Elgin- TTL
Location:A96 (Northfield Rbt to Dr. Grays Roundabout), Westbound
Start time:4th of July 2024, 7:30pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Huntly Old Aberdeen Road Junction - TTL's
Location:A96 (Start Newongarry Climbing Lane to Jct A97 Banff) to A96 (Jct Battlehill to River Bogie Br (E)),
Start time:2nd of September 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Huntly- TTL E/B
Location:A96 (Jct B9022 Portsoy to St Climb Lane) to M90 (Off Slip From M90 to Start On Slip To A912), Eastbo
Start time:8th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Inverurie EB - Diversion Signage
Location:A96 (Jct Brandsbott to Jct Whiteford) to A96 (Inverurie Rbt (E) to Inverurie Rbt (E)), Eastbound
Start time:8th of July 2024, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A96 Netherton Farm, Blackhillock - TTL's
Location:A96 (Jct B9115 Drummuir to Jct Keith Mkt Grd), Northbound
Start time:22nd of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Spey Bridge, Fochabers- TTL W/B
Location:A96 (End Eb Climbing Lane to Spey Bay Rbt) to A96 (Fochabers Bridge to Cout Brae Rbt), Westbound
Start time:4th of July 2024, 7:30pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A985 EB Charlestown. Temporary Traffic Lights.
Location:A985 (Jr D14 Crombie Pt to C7 Charlestown (W)), Eastbound
Start time:12th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A985 WB Charlestown. Advance Signage.
Location:A985 (C7 Charlestown (W) to C11 Waggon Rd), Westbound
Start time:8th of July 2024, 10:00pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A985 WB Charlestown. Temporary Traffic Lights.
Location:A985 (Jr D14 Crombie Pt to C7 Charlestown (W)), Westbound
Start time:12th of July 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A99 Toftcarl North of Thrumster - Stop/Go Works
Location:A99 (Junc Swarthouse to Junc Hospital Rd), Southbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Lining Works
Traffic Management:
Stop/Go Boards Traffic Control.
A99 Whaligoe South of Ulbster - Stop/Go Works
Location:A99 (Mid Clyth to Crossrds S Of Ulbster) to A99 (Crossrds S Of Ulbster to Junc Swarthouse), Northbou
Start time:25th of July 2024, 8:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A99 Whiterow South of Wick - Stop/Go Works
Location:A99 (Junc Swarthouse to Junc Hospital Rd), Northbound
Start time:22nd of July 2024, 8:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
Craigens Road - NB - Temp Lights
Location:M8 (Duntilland Road to End Of Se Unit) to M8 (End Of Ppp to Duntilland Road), Northbound
Start time:25th of July 2024, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
Craigens Road - SB - Temp Lights
Location:M8 (End Of Ppp to Duntilland Road) to M8 (Duntilland Road to End Of Se Unit), Southbound
Start time:4th of July 2024, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
M73 Daldowie on-slip to M73 Northbound - Total closure
Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip) to M74 (Start On-Slip to End Of Entry Slip), Nor
Start time:5th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 NB Jct 3A On-slip, M74 NB Jct 2A Off-slip, M74 SB Jct 2A On-slip
M73 Junction 2A overbridge Woodneuk Avenue - Total closure
Location:M73 (Bowling Green Roundabout to Entry To M73 Nb) to M73 (Auldyards Road Roundabout to Entry To M73
Start time:10th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
Northbound - (M73 Junction 2A NB on-slip) M73 Northbound, M73 Northbound Junction 3 off-slip, Mollins road, Cumbernauld Road, M73 Southbound on-slip, M73 Southbound.
Southbound - (M73 Junction 2A on-slip SB) M73 Southbound, M73 Southbound Junction 2 off-slip, Baillieston Roundabout, M73 Northbound Junction 2 on-slip, M73 Northbound.
M73 N/B Between J3 Mollinsburn and the M73/M80 Merge (J4) - Lane Closures
Location:M73 (Mollinsburn O/B to M73 Eb Split) to M73 (M73 Eb Split to Entry Slip), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M73 Northbound Junction 1 to Junction 2
Location:M73 (Start Of 3-Lane Section to Baileston Off Slip) to M73 (Mainline 3 To 2 Lane to Bailleston Int O
Start time:16th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Single Lane Running.
M73 Northbound Junction 2 Baillieston on-slip - Total closure
Location:A8 (Baillieston Int Rbt to Baillieston Int Rbt) to M73 (A8 Bailleston Rbt to On Slip M73 (Nb)), Nort
Start time:4th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 SB, Daldowie, M73 NB
M73 Northbound Junction 2 off-slip - Total closure
Location:M73 (Mainline 3 To 2 Lane to Bailleston Int O/B) to M73 (Off Slip From M73 to A8 Bailleston Rbt), No
Start time:19th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 Northbound, M73 Jct 2A off-slip and return SB
M73 Northbound Junction 2A Gartcosh on-slip - Total closure
Location:M73 (Bowling Green Roundabout to Entry To M73 Nb), Northbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 S/B to Jct 2 and return northbound.
M73 Northbound junction 2 off-slip to junction 2 on-slip -Total closure
Location:M73 (Mainline 3 To 2 Lane to Bailleston Int O/B) to M73 (N/B Baillieston Int to N/B Gartcosh Off Sli
Start time:8th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M73 Northbound Junction 2 off-slip, Baillieston Roundabout, M73 Junction 2 on-slip
M73 Northbound to M8 Westbound - Total closure
Location:M73 (Start Of Ded. Lane to Nosing) to M8 (Nosing to Start M8 Wb), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M73 NB Jct 2 off-slip, Swinton Rbt, Bargeddie Rbt, A8 Westbound to M8 Westbound on-slip.
M73 Southbound Junction 2 off-slip - Total closure
Location:M73 (S/B Gartcosh Int On Ramp to Baillieston Interchange) to M73 (Off Slip From M73 to A8 Bailleston
Start time:5th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 SB, Daldowie, M73 northbound, Baillieston Interchange.
M73 Southbound Junction 2 on-slip - Total closure
Location:M73 (A8 Bailleston Rbt to On Slip M73 (Sb)), Southbound
Start time:4th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 northbound, M73 Jct 2A and return SB
M73 Southbound Junction 2A Gartcosh off-slip - total closure
Location:M73 (M80 Dbfo Sb Extent to Johnston Rd Bridge (Sb)) to M73 (Start Of Slip Road to Roundabout Auldyar
Start time:3rd of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 SB Jct 2 Off-slip, Baillieston Rbt, M73 NB Jct 2 On-slip
M73 Southbound Link road to M74 Southbound - Total closure
Location:M73 (Off Slip To M74 Sb to End Of Broken Laneline) to M73 (End Of Broken Lane Line to Merge To M74 S
Start time:4th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M73 SB Link road to M74 NB, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip
M73 Southbound to Daldowie lights - Total closure
Location:M74 (M73 Int Split to M73 Int W Split), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 NB Jct 2A Off-slip, M74 SB Jct 2A On-slip
M73 Southbound to M74 Southbound Link Road -Total closure
Location:M73 (Off Slip To M74 Sb to End Of Broken Laneline) to M73 (End Of Broken Lane Line to Merge To M74 S
Start time:14th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 SB Link road to M74 NB, M74 NB Jct 2a Off-slip, M74 SB Jct 2a On-slip.
M73 southbound to M74 Northbound link road - Total closure
Location:M73 (M73 Jn 1 Off-Slip to End Two-Lane Slip) to M74 (A721 Bridge to M8ppp Boundary), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M73 Southbound to M74 Southbound link road, M74 Junction 5 off-slip, M74 Junction 5on-slip, M74 Northbound
M74 Jct 1a - Jct 1 NB Road Closure
Location:M74 (Glasgow Rd O/B to Polmadie Junc) to M74 (End Of 3 Lane to Start Of Dedicated C/Way), Northbound
Start time:30th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
Leave M74 at jct 1a- turn right onto Polmadie rd- turn left onto A730- at rbt take 2nd onto A730- at rbt take 1st exit onto A730- at turn jct right onto A728 laurieston rd- at jct turn left onto Ballater st- continue onto Nelson st- turn left Paterson st- turn right Wallace st- follow directional signs- end
M74 EB Jct 3a to 2A - Route Part of Diversion
Location:M74 (Fullarton Rbt to Slip Road On) to M74 (A763 Underbridge to M8 Ppp Boundary), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 EB Jct 3a to Jct 2a - Route Part of Diversion
Location:M74 (Fullarton Rbt to Slip Road On) to M74 (A763 Underbridge to M8 Ppp Boundary), Eastbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 Jct 2 off slip NB Slip Closure
Location:M74 (Slip 2-Lane to Slip To A724 Jnc), Northbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
Leave M74 north at junction 2a- at roundabout take 1st exit onto Fullarton Road- at roundabout take 2nd exit onto Cambuslang Road - at junction turn right onto A724- at roundabout take 2nd exit onto A724 Cambuslang Road- end
M74 Jct 1 NB onto M8 Jct 23 WB - Total Closure
Location:M74 (End Of 3 Lane to Start Of Dedicated C/Way) to M8 (Jct 22 On Slip to Jct 23 Off Slip), Westbound
Start time:27th of July 2024, 9:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Scotland St, Seaward St, Paisley Rd, Paisley Rd West, Helen St
End
M74 Jct 1 off slip NB- Slip Closure
Location:M74 (Slip Off to Slip 2-Lane), Northbound
Start time:30th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
Leave M74 at jct 1a- turn right onto Polmadie rd- turn left onto A730- at rbt take 2nd onto A730- at rbt take 1st exit onto A730- at turn jct right onto A728 laurieston rd- at jct turn left onto Ballater st- continue onto Nelson st- turn left Paterson st- turn right Wallace st- follow directional signs- end
M74 Jct 12 to Jct 10 NB - Total Closure
Location:M74 (N/B Slip Road Off to A70 Overbridge) to M74 (Slip From B7078 to B7086 Underpass), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
M74 Jct 12 NB offslip - Millbank Interchange - A70 Ayr Rd - B7078 - Carlisle Rd - B7078 - Wellburn Interchange - Rejoin M74 NB at Jct 10 onslip
end
M74 Jct 1a on slip NB- Slip Closure
Location:M74 (Polmadie Road to Wb Entry Slip (Left)) to M74 (Polmadie Junc to W/B Diverge), Northbound
Start time:30th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue on Polmadie rd- turn left onto A730- at rbt take 2nd onto A730- at rbt take 1st exit onto A730- at turn jct right onto A728 laurieston rd- at jct turn left onto Ballater st- continue onto Nelson st- turn left Paterson st- turn right Wallace st- follow directional signs- end
M74 Jct 2 to jct 1 north- Road Closure
Location:M74 (Fullarton Junc to A724 Junc) to M74 (Polmadie Junc to W/B Diverge), Northbound
Start time:1st of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 North at jct 2- turn right onto A724 cCambuslang Rd- continue onto A749 Dalmarnock Rd- turn left onto A728- at jct turn right onto A730- at jct turn left- rejoin M74 North at jct 1a
M74 Jct 2a - Jct 2 NB- Road closure
Location:M74 (A763 Junc to Fullarton Junc) to M74 (A724 O/B to Glasgow Rd O/B), Northbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
Leave M74 north at junction 2a- at roundabout take 1st exit onto Fullarton Road- at roundabout take 2nd exit onto Cambuslang Road - at junction turn right onto A724- at roundabout take 2nd exit onto A724 Cambuslang Road- end
M74 Jct 2a on slip - Slip Closure
Location:M74 (T Junction to Slip On) to M74 (Fullarton Junc to A724 Junc), Northbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue on roundabout take 3rd exit onto Fullarton Road- at roundabout take 2nd exit onto Cambuslang Road- at junction turn right onto A724- at roundabout take 2nd exit onto A724 Cambuslang Road- rejoin M74 at junction 2 on slip- end
M74 Jct 6 NB from Hamilton to M74 - Slip Closure
Location:M74 (A723 E/B On Slip Nth/Sth Split to M74 Nb Entry) to M74 (Slip On From A723 to B7012 Underpass),
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue on A723 north- at rbt take 1st exit onto A721 Merry st- take 1st exit onto A721- at rbt take 1st exit and continue onto A721 Muir st/Belshill rd- at rbt take 1st exit onto A721 Motherwell rd- at jct 1st exit onto Crossgates- at jct turn left onto B7070 Hamilton rd- at rbt take 2nd exit and continue on Hamilton rd- at rbt take 1st exit and continue on B7070- at rbt take 2nd exit and join A725 southbound- follow normal directional signs- end
M74 Jct 6 Off Slip SB - Slip Closure
Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (Start Off Slip to S/B Slp East/Wst Split), Southbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 South- leave at jct 7- at jct turn right and join M74 North- leave M74 at jct 6- end
M74 Jct 6 On Slip NB from Hamilton - Slip Closure
Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt), Northbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue on A723 north- at rbt take 1st exit onto A721 Merry st- take 1st exit onto A721- at rbt take 1st exit and continue onto A721 Muir st/Belshill rd- at rbt take 1st exit onto A721 Motherwell rd- at jct 1st exit onto Crossgates- at jct turn left onto B7070 Hamilton rd- at rbt take 2nd exit and continue on Hamilton rd- at rbt take 1st exit and continue on B7070- at rbt take 2nd exit and join A725 southbound- follow normal directional signs- end
M74 Jct 6 SB from Hamilton to M74 - Slip Closure
Location:M74 (A723 Eb Split to M74 Sb) to M74 (A723 Slip Off to A723 O'Bridge), Southbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue on A723 north- at rbt take 1st exit onto A721 Merry st- take 1st exit onto A721- at rbt take 1st exit and continue onto A721 Muir st/Belshill rd- at rbt take 1st exit onto A721 Motherwell rd- at jct 1st exit onto Crossgates- at jct turn left onto B7070 Hamilton rd- at rbt take 2nd exit and continue on Hamilton rd- at rbt take 1st exit and continue on B7070- at rbt take 2nd exit and join A725 southbound- follow normal directional signs- end
M74 Jct 6 off slip to Hamilton SB - Slip Closure
Location:M74 (Start Off Slip to S/B Slp East/Wst Split) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton), So
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 South- leave at jct 7- at jct turn right and join M74 North- leave M74 at jct 6- end
M74 Jct 6 off slip to Motherwell SB - Slip Closure
Location:M74 (Start Off Slip to S/B Slp East/Wst Split) to M74 (S/B Slp East/Wst Split to A723 Eb To Motherwe
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 South- leave at jct 7- at jct turn right and join M74 North- leave M74 at jct 6- end
M74 Junction 8 NB Offslip - Slip Closure
Location:M74 (Start Off Slip to A71 Canderside Toll Rbt), Northbound
Start time:8th of July 2024, 7:00am
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
M74 N/Bound to JCN 6 Hamilton > A723 > A72 > B7078.
M74 NB Jct 10 off slip Slip Closure
Location:M74 (Slip Off To B7078 to B7078 O'Bridge) to M74 (Slip Off To B7078 to B708 Rbt (W)), Northbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 North- leave M74 at jct 8- at rbt take 4th exit onto A71- rejoin M74 south- leave M74 at jct 9- at jct turn right- at rbt take 2nd exit- end
M74 NB Jct 6 off slip to Hamilton Slip Closure
Location:M74 (Off Slip To A723 to N/B Slip Est/Wst Split) to M74 (N/B Slip Est/Wst Split to Off Slip To Hamil
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 North- leave M74 jct 3- at jct turn right and join M74 South- leave M74 jct 6- take exit for Hamilton- end
M74 NB Jct 6 from Motherwell on Slip - -Slip Closure
Location:M74 (A723 W/B On Slip Nth/Sth Split to Entry M74 Nb) to M74 (A723 Overbridge to Slip On From A723),
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue on A723- at rbt take 5th exit onto A723- turn left- end
M74 NB Jct 8 on slip Slip Closure
Location:M74 (A71 Swinhill Rd to Entry M74 Nb), Northbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A71 Ayr Rd- at rbt take 1st exit onto A72 Lanark Rd- rejoin M74 North at jct 7
M74 NB Jct 8 to Jct 7 Road Closure
Location:M74 (Lochhead O'Bridge to Entry From A71) to M74 (A72 O'Bridge to Merryton Farm O'Bridge), Northboun
Start time:15th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 Jct 8- take 4th exit onto A71 Ayr Rd- at Rbt take 1st exit onto A72 Lanark Rd- rejoin M74 North at Jct 7
M74 NB 2a off slip - Slip Closure
Location:M74 (Slip Road to Slip Lane 3-Lane) to M74 (Slip 3-Lane to Fullarton Rbt), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on M74 north- leave M74 J2- turn right onto A724- turn right onto M74 south- leave M74 J2a- end
M74 NB J1 off slip - Slip Closure
Location:M74 (Slip Off to Slip 2-Lane) to M74 (Slip 1-Lane to T-Junction), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 and join M8 west- leave M8 at jct 23- turn right onto dumbreck road- turn right onto M8 east- turn left onto M8 sec c/way- turn left at seaward st off slip- take 2nd exit on rbt onto scotland st- turn left onto carnoustie st- end
M74 NB J10 on slip - Slip Closure
Location:M74 (B7078 Rbt (W) to Entry M74 Nb) to M74 (Slip From B7078 to B7086 Underpass), Northbound
Start time:19th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 10- at rbt take 4th exit- at rbt 1st exit onto B7078- at rbt take 3rd exit onto A71- rejoin M74 jct 8- end
M74 NB J10 to J8 - Road Closure
Location:M74 (Slip Off To B7078 to B7078 O'Bridge) to M74 (B7019 Overbridge to Off Slip To A71), Northbound
Start time:19th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 J10- at rbt take 4th exit- at rbt 1st exit onto B7078- at rbt take 3rd exit onto A71- rejoin M74 J8- end
M74 NB J11- J9 - Lane closure
Location:M74 (Start Slip On B7078 to Brocketsbrae Underpass) to M74 (End Concrete Section to Slip From B7078)
Start time:10th of July 2024, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Lane Closure.
M74 NB J15-J14 - Single Lane Running
Location:M74 (Moffat Onslip Nb to Coatsgate Bridge Nb) to M74 (Coatsgate Bridge Nb to Crossburn Culvert Nb),
Start time:3rd of July 2024, 9:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Single Lane Running (50mph)
M74 NB J18-J17 - Hard Shoulder Closure
Location:M74 (Off Slip To B723 to B723 O'Bridge) to M74 (B723 O'Bridge to A709 O'Bridge), Northbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Hard Shoulder Closure.
M74 NB J1a off slip - Slip Closure
Location:M74 (Glasgow Rd O/B to Polmadie Junc) to M74 (Slip Off to T-Junction), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 north- leave M74 jct 1- turn left onto carnoustie st- turn left onto scotland st- turn left onto wallace st- turn left and rejoin M74 south jct 1- leave M74 jct 1a- end
M74 NB J1a on slip - Slip Closure
Location:M74 (Polmadie Road to Wb Entry Slip (Left)) to M74 (Polmadie Junc to W/B Diverge), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A728- turn right onto M74 south- leave M74 J2- turn right onto A724- turn right onto M74 north- leave M74 J1a- end
M74 NB J2 off slip - Slip Closure
Location:M74 (Fullarton Junc to A724 Junc) to M74 (End Of 2-Lane to T-Junction), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 NB - leave M74 at J1 - turn left Carnoustie St- turn left onto Scotland St- turn left onto Wallace St- turn left and rejoin M74 SB - leave M74 at J2- end
M74 NB J2 on slip - Slip Closure
Location:M74 (T-Junction to Slip On From A724) to M74 (A724 O/B to Glasgow Rd O/B), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A724- turn right onto M74 SB- leave M74 J3a- turn right onto A721- turn right and rejoin M74 NB - end
M74 NB J2a on slip - Slip Closure
Location:M74 (T Junction to Slip On) to M74 (Fullarton Junc to A724 Junc), Northbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
take 2nd exit onto M74 south- leave m74 jct 3a- turn right onto A721- turn right and rejoin M74 north- end
M74 NB J3 off slip - Slip Closure
Location:M74 (M8 Ppp Boundary to A763 Underbridge) to M74 (Slip Off M74 to A763 Jct), Northbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 NB - leave M74 at J2a- at rbt take 3rd exit- at rbt take 1st exit- turn right onto A74- turn right onto A763- end
M74 NB J7 on slip - Slip Closure
Location:M74 (A72 Exit Jct to Entry M74 On Slip) to M74 (A72 O'Bridge to Merryton Farm O'Bridge), Northbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A72 Lanark Rd- at jct turn right onto Carlisle Rd- at jct turn right onto A723 at rbt take 3rd exit onto Motherwell Rd- take exit for M74 NB -end
M74 NB J8 off slip - Slip Closure
Location:M74 (Lochhead O'Bridge to Entry From A71) to M74 (Start Off Slip to A71 Canderside Toll Rbt), Northb
Start time:19th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 10- at rbt take 4th exit- at rbt 1st exit onto B7078- at rbt take 3rd exit onto A71- M74 jct 8- end
M74 NB Jct 11 - 10 Lane closures
Location:M74 (Start Slip On B7078 to Brocketsbrae Underpass), Northbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M74 NB Jct 11 on slip - Total Closure
Location:M74 (B7078 Rbt (W) to Entry M74 Nb) to M74 (Start Slip On B7078 to Brocketsbrae Underpass), Northbou
Start time:8th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
B7078 - Carlisle Rd - B7078 - Wellburn Interchange - Rejoin M74 NB at Jct 10 onslip
M74 NB Jct 11 on slip Slip Closure
Location:M74 (B7078 Rbt (W) to Entry M74 Nb) to M74 (Start Slip On B7078 to Brocketsbrae Underpass), Northbou
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
at slip rd turn left onto B7078- continue B7078 to rbt- at rbt take 2nd exit onto M74 North at jct 10- end
M74 NB Jct 5 to Jct 6 - Route Part of Diversion
Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (Slip On From A723 to B7012 Underpass), Northbo
Start time:14th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 NB Jct 5 to Jct 6 - Route Part of a Diversion
Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (Slip On From A723 to B7012 Underpass), Northbo
Start time:12th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 NB Jct 6 off slip Slip Closure
Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (Off Slip To A723 to N/B Slip Est/Wst Split),
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 north- leave M74 jct 3- turn right at jct and join M74 south- leave M74 jct 6- end
M74 NB Jct 6 off slip to Hamilton - Total Closure
Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (N/B Slip Est/Wst Split to Off Slip To Hamilto
Start time:23rd of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 5 NB off slip - M74 Jct 5 SB on slip - M74 Jct 6 SB off slip - Diversion end
M74 NB Jct 6 off slip to Hamilton - Total closure
Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (N/B Slip Est/Wst Split to Off Slip To Hamilto
Start time:5th of August 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 5 NB off slip - M74 Jct 5 SB on slip - M74 Jct 6 SB off slips - diversion end
M74 NB Jct 6 off slip to Motherwell - Total Closure
Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (N/B Slip Est/Wst Split to A723 To Motherwell)
Start time:23rd of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 5 NB off slip - M74 Jct 5 SB on slip - M74 Jct 6 SB off slip - Diversion end
M74 NB Jct 6 off slip to Motherwell - Total closure
Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (N/B Slip Est/Wst Split to A723 To Motherwell)
Start time:5th of August 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 5 NB off slip - M74 Jct 5 SB on slip - M74 Jct 6 SB off slips - diversion end
M74 NB Jct 6 off slip to Motherwell Slip Closure
Location:M74 (Off Slip To A723 to N/B Slip Est/Wst Split) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton),
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 North- leave M74 jct 3- at jct turn right and join M74 south- leave M74 jct 6- take exit for Motherwell- end
M74 NB Jct 6 on slip from Hamilton - Total closure
Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (A723 Slip Off to A723 O'Bridge), Northbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A723 EB – Airbles Rd RBT – A723 WB – M74 Jct 6 on slip from Motherwell – Diversion End
M74 NB Jct 6 on slip from Motherwell - Total closure
Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 W/B On Slip Nth/Sth Split to Entry M74
Start time:31st of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A723 SB - A723 NB - M74 Jct 6 on slips from Hamilton - Diversion end
M74 NB Jct 8 to Jct 6 Offslip - Road Part of a Diversion Route
Location:M74 (Start Off Slip to A71 Canderside Toll Rbt) to M74 (Off Slip To A723 to N/B Slip Est/Wst Split),
Start time:8th of July 2024, 7:00am
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 Northbound Junction 2 off-slip - Total closure
Location:M74 (A763 Junc to Fullarton Junc) to M74 (Slip 3-Lane to Fullarton Rbt), Northbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound to M73 Northbound, M73 Northbound Junction 2 off-slip, Baillieston Rbt, Swinton Rbt, Main Street, Glasgow road, Mount Vernon Avenue, A74, M74 Junction 2 on-slip Northbound.
M74 Northbound Junction 3 off-slip - total closure
Location:M74 (M8 Ppp Boundary to A763 Underbridge) to M74 (Slip Off M74 to A763 Jct), Northbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound to M73 Northbound, M73 Northbound Junction 2 off-slip, Baillieston Rbt, Swinton Rbt, Main Street, Glasgow road, Mount Vernon Avenue, A74, M74 Junction 2 on-slip Northbound.
M74 Northbound Junction 3A on-slip - Total closure
Location:M74 (A74 Rbt (S) to Slip Road Diverge) to M74 (Slip Road Split to Entry To M74 Nb), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A721 Southbound to M74 Southbound, M74 Southbound junction 5 off-slip, M74 Northbound Junction 5 on-slip, M74 Northbound.
M74 Northbound Junction 3A on-slip
Location:M74 (A74 Rbt (S) to Slip Road Diverge) to M74 (Secondary Lane to M8ppp Boundary), Northbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 NB Daldowie On-slip, M73 Jct 2 NB Off-slip, Baillieston Rbt, M73 Jct 2 SB On-slip, M73 SB Link Road to M74 NB .
M74 Northbound Junction 4 Maryville to M73 Northbound - Total closure
Location:M74 (Start Of Dedicated Slip to Blantyre Farm Rd O/B) to M74 (End Of Slip With Hs to Merge To M73),
Start time:8th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 NB Jct 2A Off-slip, M74 SB Jct 2A On-slip.
M74 Northbound Junction 5 freeflow on-slip - total closure
Location:A725 (Whistleberry Toll Rbt to Raith Rbt) to M74 (B7012 Rbt to Entry M74 Nb), Northbound
Start time:21st of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 SB Jct 5 On-slip, M74 SB Jct 6 Off-slip, A723, M74 NB Jct 6 On-slip.
M74 Northbound Junction 5 off-slip - Total closure
Location:M74 (Slip On From A723 to B7012 Underpass) to M74 (M74 Nb Off Slip to B702 Rbt), Northbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 NB Link to M73 NB, M73 NB Jct 2 Off-slip, Baillieston Rbt, M73 SB Jct 2 On-slip, M73 SB Link Road to M74 SB, M74 SB Jct 5 Off-slip.
M74 Northbound Junction 5 on-slip - Total closure
Location:M74 (B7012 Rbt to Entry M74 Nb) to M74 (B7012 Underpass to Fallside Rd Bridge), Northbound
Start time:21st of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 SB Jct 5 On-slip, M74 SB Jct 6 Off-slip, A723, M74 NB Jct 6 On-slip.
M74 Northbound Junction 5 on-slip -Total closure
Location:M74 (B7012 Rbt to Entry M74 Nb), Northbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 SB Jct 5 Onslip, M74 SB Jct 6 Offslip, A723, M74 NB Jct 6 Onslip.
M74 Northbound Maryville to Boundary - Total closure
Location:M74 (Mainline 3 To 2 Lane to Blantyre Farm Rd O/B) to M74 (M8 Ppp Boundary to Slip Entry To M74), No
Start time:18th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound to M73 Northbound, M73 Northbound Junction 2 off-slip, Baillieston Rbt, Swinton Rbt, Main Street, Glasgow road, Mount Vernon Avenue, A74, M74 Junction 2 on-slip Northbound.
M74 Northbound Maryville to Boundary Nearside lane closure
Location:M74 (A721 Bridge to M8ppp Boundary) to M74 (M8 Ppp Boundary to Slip Entry To M74), Northbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M74 Northbound Raith overbridge - Nearside lane closure
Location:A725 (Raith Rbt to Raith Rbt) to M74 (B7012 Underpass to Fallside Rd Bridge), Northbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Inspections: Infrastructure / Assets
Traffic Management:
Lane Closure.
M74 Northbound to M73 Northbound link road - Nearside lane closure
Location:M74 (Start Of Dedicated Slip to Blantyre Farm Rd O/B) to M73 (Start Of 3-Lane Section to Baileston O
Start time:5th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M74 SB Jct 10 on slip Slip Closure
Location:M74 (B7078 Rbt (E) to Entry M74 Sb) to M74 (Slip On From B7078 to Nethan Bridge North), Southbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on Carlisle Road- at rbt take 3rd exit onto M74 North- leave M74 at jct 8- at rbt take 3rd exit onto A71- rejoin M74 South- end
M74 SB Jct 11 off slip - Slip Closure
Location:M74 (Brocketsbrae Underpass to Slip Off To B7078) to M74 (Start Off Slip To B7078 to B7078 Rbt (E)),
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 South- leave M74 at jct 13- at rbt take 5th exit- at rbt take 3rd exit onto bM74 North- leave M74 at jct 12- at rbt take 2nd exit onto Ayr Rd- at rbt take 1st exit onto B7078- end
M74 SB J1 off slip - Lane Closure
Location:M74 (Slip 2-Lane to T-Junction), Southbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M74 SB J1 on slip - Slip Closure
Location:M8 (Slip Off M8 Wb to End Slip ?????) to M74 (2 To 1 Lane to Slip On), Southbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on wallace st- join M8 sec c/way at jct 21- continue and join M8 west- leave M8 at jct 23- turn right onto dumbreck road- turn right onto M8 east- turn left onto M8 sec c/way- end
M74 SB J13-J14 - Lane Closure
Location:M74 (Slip Entry From A702 to Slip Exit To A702), Southbound
Start time:3rd of July 2024, 8:00am
Description:Works:
Pothole Repairs
Traffic Management:
Lane Closure.
M74 SB J14-J15 - Single Lane Running
Location:M74 (Crossburn Culvert to Coatsgate Bridge) to M74 (Coatsgate Bridge to Moffat Exit Sb), Southbound
Start time:7th of July 2024, 9:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Single Lane Running (50mph)
M74 SB J15 ENTRY SLIP ROAD - Road Closure
Location:M74 (A701 Moffat Rbt to End Sb On Slip From Moffat) to M74 (A701 Moffat Onslip to Milton Underpass),
Start time:1st of July 2024, 9:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A701 - B7076 - J17 SB ENTRY SLIP
M74 SB J15-J16 - Single Lane Running
Location:M74 (A701 Moffat Exit Sb to A701 Underbridge) to M74 (A701 Moffat Onslip to Milton Underpass), South
Start time:1st of July 2024, 9:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Single Lane Running (50mph)
M74 SB J1a off slip - Slip Closure
Location:M74 (Start Of 3 Lanes to Polmadie Junc) to M74 (Slip 2-Lane to T-Junction), Southbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 South- leave M74 jct 2- at jct turn right- turn right onto M74 North- leave M74 jct 1a- end
M74 SB J1a onslip - Slip Closure
Location:M74 (Slip 1-Lane to Slip On) to M74 (Polmadie Junc to Glasgow Rd O/B), Southbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A728- turn right on M74 North- leave M74 jct 1- at jct turn left onto Carnoustie St- turn left onto Scotland St- continue onto West St- turn left onto Wallace St- turn left and rejoin M74 south- end
M74 SB J2 off slip - Slip Closure
Location:M74 (Slip Off To A724 to Slip 1-Lane) to M74 (Slip 2-Lane Section to Start Of 1-Lane Slip), Southbou
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 south- leave M74 J2a- take 3rd exit and join M74 north- leave M74 J2- end
M74 SB J2 on slip - Slip Closure
Location:M74 (T-Junction to Merge) to M74 (A724 Junc to Fullarton Junc), Southbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A724- turn right onto M74 north- leave M74 J1a- turn right- turn right onto M74 south- end
M74 SB J3 on slip - Slip Closure
Location:M74 (A763 Jct to Entry M74 Sb) to M74 (Sb Start Entry Slip From A763 to End Slip From A763), Southbo
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A763- turn left onto A74- turn left at traffic light Fullarton Rd- join M74 South- end
M74 SB J7 off slip - Slip Closure
Location:M74 (Off Slip To A72 to A72 Lanark Road), Southbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 SB- leave M74 at J8 - at rbt take 5th exit onto A71- at rbt take 1st exit onto A72- end
M74 SB J8 on slip - Slip Closure
Location:M74 (A71 Swinhill Rd to Entry M74 Sb) to M74 (Canderside Off Slip To A71 to Lochhead O'Bridge), Sout
Start time:19th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A71-- at rbt take 1st exit onto B7078- at rbt 2nd exit and rejoin M74 at jct 10
M74 SB J8 to J10 - Road Closure
Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Slip On From B7078 to Nethan Bridge North), Southb
Start time:19th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 8- at rbt take 1st exit onto B7078- at rbt 2nd exit and rejoin M74 at jct 10
M74 SB J9 - J11 off slip - lane closure
Location:M74 (Draffan Underpass to B7086 Underpass) to M74 (Brocketsbrae Underpass to Slip Off To B7078), Sou
Start time:10th of July 2024, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Lane Closure.
M74 SB J9 off slip - Slip Closure
Location:M74 (Off Slip To B7078 to Jct B7078), Southbound
Start time:18th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 SB - leave M74 at J11 - at rbt take 2nd exit - at rbt take 2nd exit and join M74 NB - leave M74 North at J10- at rbt take 4th exit for Carlisle Rd- at rbt take 1st exit - end
M74 SB J9 off slip - Slip Closure
Location:M74 (Draffan Underpass to B7086 Underpass) to M74 (Off Slip To B7078 to Jct B7078), Southbound
Start time:19th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 8- at rbt take 1st exit onto B7078- end
M74 SB J9 to J10 - Total closure
Location:M74 (Draffan Underpass to B7086 Underpass) to M74 (Slip On From B7078 to Nethan Bridge North), South
Start time:11th of July 2024, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
Off at M74 SB off slip - B7078 Carlisle road - back on M74 SB at J10
M74 SB Jct 1 - 1A HS Closure
Location:M74 (2 To 1 Lane to Slip On) to M74 (Start Of 3 Lanes to Polmadie Junc), Southbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Drainage Works, Sweeping
Traffic Management:
Hard Shoulder Closure.
M74 SB Jct 2a off slip Slip Closure
Location:M74 (A724 Junc to Fullarton Junc) to M74 (Slip Off to T Junction), Southbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue m74 South- leave M74 jct 3a- turn right onto A721- turn right M74 North- leave M74 jct 2a- end
M74 SB Jct 2a on slip Slip Closure
Location:M74 (A74 Rbt to Start Of M74) to M74 (Fullarton Junc to A763 Junc), Southbound
Start time:16th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
take 2nd exit onto M74 North- continue M74 North- leave M74 jct 1- turn left Carnoustie St- turn left onto Scotland St- turn - left onto Wallace St- turn left and rejoin M74 South- leave m74 jct 2a- end
M74 SB Jct 5 to Jct 6 - Route Part of Diversion
Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton), Southbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 SB Jct 5 to Jct 6 - Route Part of a Diversion
Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 SB Jct 6 combined slip from Motherwell Slip Closure
Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split), Southbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue on A723- at rbt take 5th exit onto A723- turn left- end
M74 SB Jct 6 from Motherwell on slip - Slip Closure
Location:M74 (A723 W/B On Slip Nth/Sth Split to Start Entry M74 Sb), Southbound
Start time:17th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue on A723- at rbt take 5th exit onto A723- turn left- end
M74 SB Jct 6 off slip to Hamilton - Total Closure
Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (Sb Slip E/W Split to A723 Wb To Hamilton), Southbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 7 SB off slip - M74 Jct 7 NB on slip - M74 Jct 6 NB off slip - Diversion end
M74 SB Jct 6 off slip to Motherwell - Total Closure
Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (S/B Slp East/Wst Split to A723 Eb To Motherwell), Sou
Start time:24th of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 7 sb off slip - M74 Jct 7 NB on slip - M74 Jct 6 NB off slips - Diversion end
M74 SB Jct 6 on slip from Hamilton - Total closure
Location:M74 (A723 Eb to A723 Eb On Slip Nth/Sth Splt) to M74 (Slip On From A723 to B7012 Underpass), Northbo
Start time:29th of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A723 EB – Airbles Rd RBT – A723 WB – M74 Jct 6 on slip from Motherwell – Diversion End
M74 SB Jct 6 on slip from Motherwell - Total closure
Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 Underpass to Slip Entry From A723), Sou
Start time:31st of July 2024, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A723 SB - A723 NB - M74 Jct 6 on slips from Hamilton - Diversion end
M74 SB Jct 7 to Jct 8 - Road closure
Location:M74 (Off Slip to A72 Overbridge) to M74 (Canderside Off Slip To A71 to Lochhead O'Bridge), Southboun
Start time:15th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 Jct 7- at jct turn left onto A72 Lanark Rd- at jct turn left onto onto B7808 Ayr Rd- at rbt take 1st exit onto A71- rejoin M74 south jct 8 on slip.
M74 SB Jct 8 off slip - road closure
Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Off Slip To A71 to A71 U'Pass), Southbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 Jct 7- at jct turn left onto A72 Lanark Rd- at jct turn left onto onto B7808 Ayr Rd- at rbt take 1st exit onto A71- end
M74 Southbound Between Junction 5 off to Junction 5 on-slip - Nearside lane closure
Location:M74 (Fallside Rd Bridge to B7012 Underpass) to M74 (B7012 Underpass to A723 Slip Off), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M74 Southbound Junction 3A off-slip - Total closure
Location:M74 (M8ppp Boundary to A721 Gantry) to M74 (M74 Sb Off Slip to A74 Rbt (N)), Southbound
Start time:9th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 SB Jct 5 Off-slip, M74 NB Jct 5 On-slip, M74 NB Jct 4 Link Road to Daldowie.
M74 Southbound Junction 4 - Nearside lane closure
Location:M74 (Start Of Hs to Blantype Farm Rd O/B) to M74 (Blantype Farm Rd O/B to Fallside Rd O/B), Southbou
Start time:4th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M74 Southbound Junction 5 off-slip - Total closure
Location:M74 (Fallside Rd Bridge to B7012 Underpass) to M74 (Slip From M74 to B7012 Rbt), Southbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 SB Jct 6 Off-slip, A723, M74 NB Jct 6 On-slip
M74 Southbound Junction 5 on-slip - Total closure
Location:M74 (B7012 Rbt to Entry M74 Sb) to M74 (B7012 Underpass to A723 Slip Off), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M74 NB Jct 5 On-slip, M74 NB Link to M73 NB, M73 NB Jct 2 Off-slip, Baillieston Rbt, M73 SB Jct 2 On-slip, M73 SB Link to M74 SB
M74 Southbound Junction 5 to Junction 6 - Offside & Adjacent lane closure
Location:M74 (B7012 Underpass to A723 Slip Off), Southbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M74 Southbound to M73 Northbound link road - Total closure
Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip) to M74 (Start On-Slip to End Of Entry Slip), Sou
Start time:5th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 SB, Junction 5 SB Raith SB Off-slip, Raith Rbt, Junction 5 NB On-slip
M74 WB Jct 3a to 2A - Route Part of Diversion
Location:M74 (M8 Ppp Boundary to A763 Underbridge) to M74 (Slip 3-Lane to Fullarton Rbt), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 WB Jct 3a to Jct 2a - Route Part of Diversion
Location:M74 (M8 Ppp Boundary to A763 Underbridge) to M74 (Slip 3-Lane to Fullarton Rbt), Westbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Road Part of a Diversion Route
Traffic Management:
No Obstruction on Carriageway or Footway.
M74 jct 1 NB-Lane 2 closure
Location:M74 (End Of 3 Lane to Start Of Dedicated C/Way), Northbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M74 jct 1 SB-Lane 2 closure
Location:M74 (End Of Dedicated C/Way to Start Of 3 Lanes), Northbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M74 jct 1 to Jct 1a south- Road Closure
Location:M74 (End Of Dedicated C/Way to Start Of 3 Lanes) to M74 (Polmadie Junc to Glasgow Rd O/B), Southboun
Start time:29th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 1- turn right onto A8 Kingston St- turn right onto Eglinton st – turn left onto Norfolk st- continue onto Ballater st- Turn right onto A728- Turn left onto A730- at rbt take 2nd exit onto A730- at rbt take 1st exit onto A803- at traffic lights turn right and re-join M74 at jct 1a- end
M74 jct 1a off slip north- road closure
Location:M74 (Slip Off to T-Junction), Northbound
Start time:1st of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 2- turn right and continue A724 Cambuslang Rd- continue onto A749 Dalmarnock Rd- turn left onto A728- at jct turn right onto A730- at jct turn left- end
M74 jct 1a on slip south- Road Closure
Location:M74 (T-Junction to Slip On), Southbound
Start time:31st of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue Polmadie Rd- at jct jct right onto A730- at jct keep left onto A728- at jct turn right onto A729 Dalmarnock Rd- at jct turn left onto A724 Cambuslang Rd- re join M74 South at jct 2- end
M74 jct 1a to jct 2 south- Road Closure
Location:M74 (Start Of 3 Lanes to Polmadie Junc) to M74 (A724 Junc to Fullarton Junc), Southbound
Start time:31st of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 at jct 1a- at jct turn left onto Polmadie Rd- at jct jct right onto A730- at jct keep left onto A728- at jct turn right onto A729 Dalmarnock Rd- at jct turn left onto A724 Cambuslang Rd- re join M74 South at jct 2- end
M74 jct 2 off slip south- road closure
Location:M74 (T-Junction to Merge) to M74 (A724 Junc to Fullarton Junc), Southbound
Start time:31st of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 at jct 1a- at jct turn left onto Polmadie Rd- at jct jct right onto A730- at jct keep left onto A728- at jct turn right onto A729 Dalmarnock Rd- at jct turn left onto A724 Cambuslang Rd- end
M74 jct 2 on slip north- Road Closure
Location:M74 (T-Junction to Slip On From A724) to M74 (A724 O/B to Glasgow Rd O/B), Northbound
Start time:1st of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue A724 Cambuslang Rd- continue onto A749 Dalmarnock Rd- turn left onto A728- at jct turn right onto A730- at jct turn left- rejoin M74 North at jct 1a
M74 jct 2 on slip south- Road Closure
Location:M74 (T-Junction to Merge) to M74 (A724 Junc to Fullarton Junc), Southbound
Start time:2nd of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue on A724- at rbt take 1st exit onto A724- at jct turn left onto Cambuslang Rd- at rbt take 2nd exit- at rbt take 1st exit onto Fullarton Rd at rbt take 2nd exit- at rbt take 3rd exit and re join M74 South jct 2a
M74 jct 2 to jct 2a south- Road Closure
Location:M74 (Glasgow Rd O/B to A724 Junc) to M74 (Fullarton Junc to A763 Junc), Southbound
Start time:2nd of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 2- at jct turn right onto A724- at rbt take 1st exit onto A724- at jct turn left onto Cambuslang Rd- at rbt take 2nd exit- at rbt take 1st exit onto Fullarton Rd at rbt take 2nd exit- at rbt take 3rd exit and re join M74 South jct 2a
M74 jct 2a off slip- road closure
Location:M74 (Slip Off to Slip 2-Lane) to M74 (Slip Off to T Junction), Southbound
Start time:2nd of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 2- at jct turn right onto A724- at rbt take 1st exit onto A724- at jct turn left onto Cambuslang Rd- at rbt take 2nd exit- at rbt take 1st exit onto Fullarton Rd at rbt take 2nd exit- follow signs- end
M74 jct onslipsouth- Road Closure
Location:M8 (Slip Off M8 Wb to End Slip ?????) to M74 (2 To 1 Lane to Slip On), Southbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
turn left onto Carnoustie st- turn right onto A8 Kingston St- turn right onto Eglinton st – turn left onto Norfolk st- continue onto Ballater st - Turn left onto A730- at rbt take 2nd exit onto A730- at rbt take 1st exit onto A803- at traffic lights turn right and re-join M74 at jct 1a- end.
M77 - Jct 5 to Jct 8 SB total closure
Location:M77 (A77 Overbridge Malletsheugh to Maidenhill Interchange Overbridge) to A77 (End Of Motorway to B7
Start time:7th of July 2024, 8:00pm
Description:Works:
Grass Cutting, Litter Picking
Traffic Management:
Road Closure.
M77 - Meiklewood to Junction 5 NB total closure
Location:A77 (Slip Road Exit Nb to On Slip From B7038) to M77 (Maidenhill Interchange Overbridge to A77 Overb
Start time:10th of July 2024, 8:00pm
Description:Works:
Grass Cutting, Litter Picking
Traffic Management:
Road Closure.
M77 Jct 1 NB offside lane closure
Location:M77 (B762 Barrhead Rd Int (N) to B768 Dumbreck Rd Int (S)) to M77 (B768 Dumbreck Rd Int (S) to B768
Start time:3rd of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (50mph)
M77 Jct 2 to Jct 1 NB - HS Closure
Location:M77 (B762 Barrhead Rd Int (N) to B768 Dumbreck Rd Int (S)), Northbound
Start time:5th of July 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Hard Shoulder Closure.
M77 Jct 5 to Jct 4 NB - HS Closure
Location:M77 (A77 Overbridge to Crookfur Int.), Northbound
Start time:4th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M77 NB Jct 1 onslip from Dumbreck Road - Slip Closure
Location:M77 (N/B Slip Road On To M77 From Dumbreck Road to N/B Slip Road On To M77), Northbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue Dumbeck road- join M8 east at jct 23- end
M77 NB Jct 1 to M8 EB sec c/way- Closure
Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Lhs Slip To M8 to Entry To M8), Northbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 jct 1- at jct turn left onto Dumbeck Road- return M8 east at jct 23- end
M77 NB Jct 1 to M8 Jct 22- Road Closure
Location:M77 (B768 Dumbreck Rd Int (S) to B768 Dumbreck Rd Int (N)) to M77 (B768 Dumbreck Rd Int (N) to Slip
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 jct 1- at jct turn left onto Dumbeck Road- return M8 east at jct 23- end
M77 NB Link Road to M8 EB Jct 22 - Closure
Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry), Northb
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 jct 1- at jct turn left onto Dumbeck Road- return M8 east at jct 23- end
M77 NB from Jct 1 slip to M8 EB Jct 22 OSL closure
Location:M77 (End Of Hs to On-Slip Merge) to M77 (Rhs Slip To M8 to Entry To M8), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (50mph)
M77 jct 1 off slip north- slip road closure
Location:M77 (B768 Dumbreck Rd Int (S) to B768 Dumbreck Rd Int (N)) to M77 (N/B Slip Road Off To Dumbreck Roa
Start time:6th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue on M77 North- leave M77 at link for M8 sec c/way- leave sec c/way at jct 21- turn right for slip for M8 sec c/way West- join M8 sec c/way West- leave sec/way for M77 south- leave M77 South at jct 1- end
M77 link to M8 sec c/way east- road closure
Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Lhs Slip To M8 to Entry To M8), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue onto M8 east- leave M8 at jct 19 Bothwell st- turn left onto Pitt st- turn left onto St Vincent st- turn left and rejoin M8- leave M8 at West st off ramp- follow directional signs- end
M77 prior to Jct 2 SB - HS Closure
Location:M77 (B768 Dumbreck Rd Int (S) to B762 Barrhead Rd Int (N)), Southbound
Start time:4th of July 2024, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M8 EB Jct 17 onslip from A82 Great Western Road Slip Closure
Location:M8 (A82 Exit to Entry M8 Eb), Eastbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A82- at jct turn left onto Garscube rd- at rbt take 3rd exit onto A804- at jct turn left- rejoin M8 east at jct 16- end
M8 J17 - J16 E/B Lane 1 & HS closure
Location:M8 (A81 Underpass to Craighall Rd Underpass) to M8 (Craighall Rd to Entry M8 Eb), Eastbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Lane Closure.
M8 Jct 22 WB - Lane Closure
Location:M8 (Off Slip Jct 20 to M77 In Jct 22), Westbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (50mph)
M8 Jct 24 to Jct 22 EB lane closures
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry), Eastbou
Start time:3rd of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (50mph)
M8 - EB - Jct 2 off slip - Lane Closure
Location:M8 (Freelands Rd Br. to Wb Slip To Newbridge) to M8 (Start Nb Off Slip To Newbridge to End Of M8 Eb
Start time:24th of July 2024, 12:01am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure (40mph)
M8 - EB - Jct 4A - 4 - Lane closure
Location:M8 (Council Boundary to A706 Bridge) to M8 (A706 Bridge to E Whitburn Jct (W)), Eastbound
Start time:22nd of July 2024, 8:30pm
Description:Works:
Inspections
Traffic Management:
Lane Closure (50mph)
M8 - EB - Jct 4A - 4 - Lane closure
Location:M8 (Council Boundary to A706 Bridge) to M8 (A706 Bridge to E Whitburn Jct (W)), Eastbound
Start time:23rd of July 2024, 8:30pm
Description:Works:
Inspections
Traffic Management:
Lane Closure (50mph)
M8 - EB- Jct 2 - Closure
Location:M8 (Jct Off From M8 to East Of Claylands Jct), Eastbound
Start time:5th of August 2024, 7:30pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
East bound traffic diverted off at slip road onto the M9 northbound, diverted round Newbridge Roundabout onto M9 southbound and diverted to re-join M8 eastbound at south bound slip road.
M8 - WB - Jct 2 off slip - Closure
Location:M8 (Start Nb Off Slip To Newbridge to End Of M8 Eb Off Slip), Northbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M9 Northbound traffic directed to remain on A720 at Hermiston Gait, then onto A8 Glasgow Road at Gogar roundabout and onto northbound M9 at J1.
M8 - WB - Jct 2 off slip - Closure
Location:M8 (Start Nb Off Slip To Newbridge to End Of M8 Eb Off Slip), Westbound
Start time:5th of August 2024, 7:30pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M9 Northbound traffic directed to remain on A720 at Hermiston Gait, then onto A8 Glasgow Road at Gogar roundabout and onto northbound M9 at J1.
M8 - WB - Jct 2 on slip - Closure
Location:M8 (Start M8 Eb Off Slip to On To M8 W.Bound), Westbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M8 Westbound traffic directed to join M8 East bound to Hermiston Gait J1, diverted round roundabout to return on the M8 westbound
M8 - WB - Jct 3 - Closure
Location:M8 (Drumshoreland Br to Uphall Stat. Br) to M8 (Start Wb Slip Off to Livingston East Rbt), Westbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic diverted via M8 Jct 2 WB Offslip, M9 NB, M9 Jct 1 NB Offslip, A89 WB, A899 SB where traffic will rejoin the M8 at Jct 3 WB Onslip
M8 - WB - Jct 3 - Hard Shoulder Closure
Location:M8 (Drumshoreland Br to Uphall Stat. Br) to M8 (Start Wb Slip Off to Livingston East Rbt), Westbound
Start time:16th of July 2024, 6:00am
Description:Works:
Resurfacing
Traffic Management:
Hard Shoulder Closure.
M8 - WB - Jct 4A - 4 - Lane closure
Location:M8 (East Whitburn Junction (West) to A706 Bridge) to M8 (A706 Bridge to Council Bdy), Westbound
Start time:22nd of July 2024, 8:30pm
Description:Works:
Inspections
Traffic Management:
Lane Closure (50mph)
M8 - WB - Jct 5 on slip - Closure
Location:M8 (Off Slip To B7057 to Entry To M8 Wb), Westbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
M8 Closed at Jct 5 WB follow B7057, B7066, A73, A8 M8 Jct 6a
M8 - WB- Jct 2 Closure
Location:M8 (Wb Slip To Newbridge to M8 N.Bound On Slip), Eastbound
Start time:5th of August 2024, 7:30pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M8 westbound traffic directed to remain on A720 at Hermiston Gait, then onto A8 Glasgow Road at Gogar roundabout and onto southbound M9 at J1 to take the slip road onto M8 west bound.
M8 E/B J15 off slip to Stirling Road - Total closure
Location:M8 (Off Slip M8 Eb to Slip To A803) to M8 (A803 Exit to Entry Eb M8), Eastbound
Start time:7th of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
continue on m8 to j14 eb ofslip then turn right onto veiw park avenue and right to rejoin m8 wb and follow to j15 end
M8 E/B J18- J15 OSL Closures
Location:M8 (A82 Exit to Entry M8 Eb) to M8 (A803 Exit to Entry Wb M8), Eastbound
Start time:7th of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Lane Closure.
M8 E/B J27-J26 - Lane Closure
Location:M8 (A741 Renfrew Rd O'Br to Slip Rd Off M8 Eb) to M8 (Arkleston On Slip to Off To Hillington Int), E
Start time:22nd of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Lane Closure.
M8 EB Jct 15 off slip to Stirling Road/Castle Street - Slip Closure
Location:M8 (Off Slip M8 Eb to Slip To A803) to M8 (A803 Exit to Entry Eb M8), Eastbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 14- at jct turn right- return M8 west- leave M8 west jct 15 castle st- end
M8 EB Jct 18 to Jct 13 - Lane Closure
Location:M8 (Eb On Slip to Entry From A82) to M8 (Jct 14 Off Slip to Off Slip To M80), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB Jct 23 on slip from Dumbreck Road - Slip Closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end
M8 EB Jct 24 on slip from Helen Street - Slip Closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue onto Helen st- at rbt take 3rd exit onto Edminston dr- at rbt take 3rd exit onto Broomloan Rd- at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end
M8 EB Jct 24 to Jct 22 - Lane Closure
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB Approach to Kingston Br - Lane Closures
Location:M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry) to M8 (Jct 20 Slip Rd Entry to Jct 19 Off Slip), Eastbou
Start time:23rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB J10 off slip - Slip Closure
Location:M8 (Exit M8 Eb to End Eb Off Slip), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 East- leave m8 at jct 9- at jct turn right- rejoin M8 West- leave m8 at jct 10- end
M8 EB J11 off slip - Slip Closure
Location:M8 (Jct 12 Off Slip to Jct 11 On Slip) to M8 (Slip Rd Off M8 Eb to Stepps Rd Jct), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 EB - leave M8 at J9- at jct turn right - rejoin M8 going WB - leave M8 at J11- end
M8 EB J11 on slip - Slip Closure
Location:M8 (Stepps Rd Jct to Entry M8 Eb) to M8 (Jct 11 Eb Off Slip to Jct 11 Eb Entry), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue B765 - at jct turn left onto Edinburgh rd A8- at jct turn right - turn left onto Bartiebeith rd- rejoin M8 at jct 10- end
M8 EB J12 off slip - Slip Closure
Location:M8 (Jct 12 Eb Off Slip to Jct 12 Eb Entry Slip) to M8 (Slip Off M8 Eb to Cumbanauld Rd), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 EB - leave M8 at J9- at jct turn right - rejoin M8 going WB - leave M8 At J12- end
M8 EB J13 onslip - Slip Closure
Location:M8 (Start Provan Rd Underpass to End Provan Rd Underpass), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on Provan Rd - at jct turn right onto A80 Cumbernauld Rd - at jct turn left onto Edinburgh Rd - turn left onto B765 Stepps Rd - rejoin M8 EB via J11 on slip east - end
M8 EB J13 to J12 - Lane Closure
Location:M8 (Slip On From M80 to Off Slip Jct 12), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB J30 Craigton off slip - Slip Closure
Location:M8 (Slip Off M8 Eb to Greenock Rd O'Br) to M8 (Slip Off M8 Wb to Greenock Rd O'Bridge), Eastbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 29- at rbt take 5th exit and rejoin M8 west- leave M8 at jct 30- end
M8 EB Jct 22 to Jct 20 - Lane 1 Closure
Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB Jct 13 Link Road to M80 NB Jct 2 - Closure
Location:M8 (Jct 14 Off Slip to Off Slip To M80) to M80 (South Extent Of M80 Dbfo to E.Dunbartonshire Council
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn left onto A80- at jct turn left onto Royston Road- at rbt take 2nd exit onto B765 Robroyston Rd- at rbt take 4th exit onto B765- at rbt take 2nd exit onto M80 north- end
M8 EB Jct 14 offslip to Viewpark Avenue - Closure
Location:M8 (Eb Jct 14 Off Slip to Viewpark Avenue), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn right- at jct turn left onto M8 west- leave M8 west jct 13- turn right at jct- at rbt take 1st exit Blochairn Road- at rbt take 1st exit Viewpark Road- end
M8 EB Jct 15 offslip to Springburn Expressway - Closure
Location:M8 (Slip Off M8 Eb to A803 Jct), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn right- at jct turn left onto M8 west- leave M8 west jct 15 stirling rd- turn left onto cathederal st- turn left onto castle st- turn right onto A803 springburn expressway- end
M8 EB Jct 15 onslip from Castle Street - Closure
Location:M8 (Castle St Jct to Entry M8 Eb Jct 15) to M8MONKLANDS (Junction 15 Secondary Carriageway to South
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow castle st- at jct turn right onto A804 royston rd- turn right onto Blochairn rd- at rbt turn left- at rbt turn right onto provan rd- turn left and rejoin M8 east at jct 13- end
M8 EB Jct 15 onslip from Stirling Road - Closure
Location:M8 (A803 Exit to Entry Eb M8) to M8MONKLANDS (Junction 16 Eastbound On Slip to Junction 15 Secondary
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A803- leave A803 for A804- turn left onto A804 baird st- - follow road to A804 royston rd- turn right onto Blochairn rd- at rbt turn left- at rbt turn right onto provan rd- turn left and rejoin M8 east at jct 13- end
M8 EB Jct 16 onslip from Craighall Closure
Location:M8 (Craighall Rd Underpass to Eb On Slip Jct 16) to M8 (Jct 16 On Slip to Jct 15 Off Slip), Eastboun
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow A804- at jct right onto A804 Dobbies loan- turn left onto A804 Baird St-follow Road to A804 Royston rd- turn right onto Blochairn Rd- at Rbt turn left- at Rbt turn right onto Provan Rd- turn left and rejoin M8 east at Jct 13- end
M8 EB Jct 18 onslip from Charing Cross - Closure
Location:M8 (Sauchiehall Jct to Entry M8 Eb) to M8 (Eb On Slip to Entry From A82), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow A804 North st- at Jct turn right onto A804 phoenix road- at Rbt take 3rd exit onto Garscube rd- at Jct jct left onto Cowcaddens rd- turn left onto A804 - follow road to A804 Royston Rd- turn right onto Blochairn rd- at Rbt turn left- at Rbt turn right onto Provan rd- turn left and rejoin M8 east at Jct 13- end
M8 EB Jct 19 Off slip - Advance Signage
Location:M8 (Slip Off M8 Eb to A814 Entry), Eastbound
Start time:3rd of July 2024, 9:00pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
M8 EB Jct 2 off-slip. Hard Shoulder Closure.
Location:M8 (Jct Off From M8 Eb to On To M8 W.Bound) to M9 (Start Off M8 Nb Off Slip to End M8 Off Slip Newbr
Start time:5th of August 2024, 6:00am
Description:Works:
Lighting Works
Traffic Management:
Hard Shoulder Closure.
M8 EB Jct 21 off slip ro Paisley Road - lane Closure
Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (Slip 2-Lane to T-Junction), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB Jct 22 off slip Seaward St - Slip Closure
Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (End Of 2-Lane to Searward St Jn), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue to M74 and leave at Jct 1a- at Jct turn right- rejoin M74 north- leave M74 at Jct 1- follow directional signs
M8 EB Jct 22 to M74 Jct 1 - Closure
Location:M74 (Start Of M74 to 2 To 3 Lane) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 19 Bothwell st- turn left at Pitt st- turn left onto st Vincent st- turn left onto M8 West- leave M8 at jct 20 west st- follow directional signs
M8 EB Jct 22 to M74 SB Jct 1 - Total Closure
Location:M8 (M77 Int Off Slip to M77 Int On Slip) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Dumbreck Rd, M8 EB. M8 Jct 19 EB Off slip. Pitt St, St Vincent St, Newton St, M8 WB, M8 Jct 21 WB Offslip, Wallace St, Dalintober St, M74 Jct 1 SB on slip
end
M8 EB Jct 25 Off slip - Advance Signage
Location:M8 (Jct 25 Eb Off Slip to A739 Entry), Eastbound
Start time:3rd of July 2024, 9:00pm
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
M8 EB Jct 30 Offslip Total Closure
Location:M8 (Slip On From Ferryhill to Slip Off At Ferry Int) to M8 (Slip Off M8 Wb to Greenock Rd O'Bridge),
Start time:4th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
Diversion Information:
Follow Diversion M8 EB - exit Jct 29 - Turn - Joinn M8 WB - Exit Jct 30 - End
M8 EB Jct 4 - 3A. Lane Closures.
Location:M8 (Easter Inch Footbridge to Starlaw Br) to M8 (Starlaw Br to End Of Slip Road), Eastbound
Start time:3rd of July 2024, 8:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M8 EB Prior to Jct 17 on slip to Jct 15 - OSL Closure
Location:M8 (A82 Exit to Entry M8 Eb) to M8 (Off Slip To A803 to On Slip From A803), Eastbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB slip to M80 NB - Total Closure
Location:M8 (Off Slip To M80 to Entry From M80) to M80 (M8 Off Slip to Entry M80 Nb), Eastbound
Start time:7th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Road Closure.
Diversion Information:
continue on M8 EB - Off at M8 J12 - left onto A89 Cumbernauld road - left onto B765 Provanmill road - right onto B765 Royston road - first left at the R'about on to B765 Robroyston road - Join M80 NB on slip at J2 - diversion ends
M8 Eastbound Newhouse Junction - Nearside lane closure
Location:M8 (Newhouse Interchange to End Of Ppp), Eastbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Inspections: Infrastructure / Assets
Traffic Management:
Lane Closure.
M8 Hillington Rbt inner - lane closure
Location:M8 (Wb Off Slip to Mid Point Hillington Int Bridges), Southbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 J15 EB off slip - Closure
Location:M8 (Off Slip To A803 to On Slip From A803) to M8 (Slip Off M8 Eb to A803 Jct), Eastbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
Carry on to J14 Eb off slip, back on J14 WB on slip, off at J15 WB off slip, end
M8 J15 EB on slip from Castle St - Total Closure
Location:M8 (Castle St Jct to Entry M8 Eb Jct 15) to M8 (Jct 15 On Slip to Jct 14 Off Slip), Eastbound
Start time:7th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Road Closure.
Diversion Information:
continue on Castle St - right onto A803 - right again on A803 Springburn road - Take the M8 EB on slip from stirling road - diversion ends
M8 J15/J13 EB - lane closure
Location:M8 (Jct 15 On Slip to Jct 14 Off Slip) to M8 (Jct 14 Off Slip to Off Slip To M80), Eastbound
Start time:7th of July 2024, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 J16 E/B on slip Closure
Location:M8 (Craighall Rd Underpass to Eb On Slip Jct 16) to M8 (Jct 16 On Slip to Jct 15 Off Slip), Eastboun
Start time:14th of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
alternate route, A804, left and follow A804, Royston rd, right onto castle street, right A803NB, j15 on slip, end
M8 J16-15 E/B lane HS closure
Location:M8 (Jct 16 On Slip to Jct 15 Off Slip) to M8 (Off Slip To A803 to On Slip From A803), Eastbound
Start time:14th of July 2024, 8:00pm
Description:Works:
Inspections, Trial hole investigation
Traffic Management:
Lane Closure.
M8 J22 off slip Seward Street EB - Closure
Location:M74 (End Of 2-Lane to Start Of 1-Lane), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via:
Seaward St, Paisley Rd, Helen St, End
M8 J23 EB on slip Total closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: Dumbreck Rd, End
M8 J23 EB on slip Total closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb) to M8 (A8 O'Bridge to Jct 23 Slip Rd Entry), Eastbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: Dumbeck Rd, End
M8 J24 EB on slip Total closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: Helen St, Edmiston Drive, Broomloan Rd, Dumbeck Rd, End
M8 J24 EB on slip Total closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: Helen St, Edmiston Drive, Broomloan Rd, Dumbreck Rd, End
M8 J24 to J22 EB - Total closure
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: M8 Jct 24 EB Off slip, Helen St, Edmiston Drive, Broamloan Rd, Dumbeck Rd, End
M8 J24 to J22 EB Total closure
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: M8 Jct 24 EB Off slip, Helen St, Edmiston Drive, Broomloan Rd, Dumbreck Rd, End
M8 J25 to J24 EB lane closure
Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip) to M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip), Eastbo
Start time:10th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure.
M8 J25 to J24 Lane closures
Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip), Eastbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure.
M8 J27 E/B on slip - Total Closure
Location:M8 (A741 Arkleston Rd to Entry M8 Eb), Eastbound
Start time:22nd of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
A741 Renfrew Rd, A761 Glasgow Rd, Sandwood Rd, A736 Hillington Rd, M8 Jct 26 E/B onslip diversion End.
M8 Jct 10 off slip EB- Slip Closure
Location:M8 (Exit M8 Eb to End Eb Off Slip), Eastbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M8 jct 11- at jct turn right onto B765- at jct turn left onto Edinburgh rd- turn left onto Bartiebeth rd- end
M8 Jct 11 on slip EB Slip Closure
Location:M8 (Stepps Rd Jct to Entry M8 Eb) to M8 (Jct 11 Eb Off Slip to Jct 11 Eb Entry), Eastbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue on B765- at jct turn left onto Edinburgh rd- turn left onto Bartiebeth rd- rejoin M8 at jct 10- end
M8 Jct 11 to jct 10 EB - Road Closure
Location:M8 (Jct 12 Off Slip to Jct 11 On Slip) to M8 (End Of Nosing to Jnct 10 On Slip (Nosing)), Eastbound
Start time:6th of August 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M8 jct 11- at jct turn right onto B765- at jct turn left onto Edinburgh rd- turn left onto Bartiebeth rd- rejoin M8 at jct 10- end
M8 Jct 13 to Jct 15 WB - Lane Closures
Location:M8 (Off Slip To M80 to Entry Slip From M80) to M8 (Jct 16 Wb Off Slip to Slip To Craighall Rd), West
Start time:12th of July 2024, 8:00pm
Description:Works:
Barrier Repair, Inspections
Traffic Management:
Lane Closure.
M8 Jct 14 onslip WB - Total Closure
Location:M8 (New Park Avenue to Entry M8 Wb) to M8 (On Slip Jct 14 to Off Slip Jct 15), Westbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Barrier Repair, Inspections
Traffic Management:
Road Closure.
Diversion Information:
follow diversion
Viewpark Ave, Alexandra Parade, Cumbernauld Rd, M8 Jct 12 WB On slip, End
M8 Jct 15 on Slip from Springburn Expressway Loop U WB - Total Closure
Location:M8 (Jct 15 Off Slip to M8 O'Bridge), Westbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Barrier Repair, Inspections
Traffic Management:
Road Closure.
Diversion Information:
follow diversion
Castle St, Cathedral St, Cowcaddens Rd, West Graham St, M8 Jct 17 WB On slip, End
M8 Jct 21 - 22 WB - Lane Closures
Location:M8 (Off Slip Jct 20 to M77 In Jct 22), Westbound
Start time:30th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure.
M8 Jct 22 Secondary carriageway WB NSL closure
Location:M74 (Start Ded. Lane to M8 & M77 Split) to M77 (Off Slip From M8 Wb to Entry To M77 Sb), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
M8 Jct 22 WB - Lane Closure
Location:M8 (Off Slip Jct 20 to M77 In Jct 22) to M8 (Jct 22 On Slip to Jct 23 Off Slip), Westbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure.
M8 Jct 22 WB on slip Seaward Street Closure
Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Eastbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via:
Seaward St, Paisley Rd, Helen St, End
M8 Jct 22 off slip Seaward St Loop EB - Total Closure
Location:M74 (End Of 2-Lane to Start Of 1-Lane) to M74 (Roundabout to Start Of 1-Lane), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion
Seaward St - Scotland St - Carnoustie St - M8 WB onslip
end
M8 Jct 22 sec c/way WB - Lane Closures
Location:M74 (Carnoustie St Crossroads to Entry M8 Slip) to M74 (Start Ded. Lane to M8 & M77 Split), Westboun
Start time:30th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure.
M8 Jct 22 to Jct 23 Secondary Carriageway WB lane closure
Location:M74 (M8 & M77 Split to End Of M74) to M8 (Jct 22 On Slip to Jct 23 Off Slip), Westbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (50mph)
M8 Jct 22 to Jct 23 sec c/way WB - Total Closure
Location:M74 (M8 & M77 Split to End Of M74) to M8 (Jct 22 On Slip to Jct 23 Off Slip), Westbound
Start time:1st of August 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
M77 SB, M77 Jct 1 SB offslip, Dumbreck Rd, Paisley Rd West, Helen St, M8 Jct 24 WB On slip
end
M8 Jct 23 onslip EB - Total Closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Dumbreck Rd, M77 Jct 1 NB On slip
end
M8 Jct 24 onslip EB - Total Closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Helen St, Edmiston Drive, Dumbreck Rd, M77 Jct 1 NB On slip
end
M8 Jct 24 onslip EB - Total Closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Traffic going NB on Helen St follow diversion -
Continue on Helen St - 4th Exit on the Rbt to Helen St SB - Paisley Rd W - Dumbreck Rd - Join M8 EB Jct 23
Traffic going SB on Helen ST follow diversion -
Paisley Rd W - Dumbreck Rd - Join M8 EB Jct 23
M8 Jct 24 to Jct 22 EB - Lane Closure
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure.
M8 Jct 24 to Jct 23 EB - Lane Closures
Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip) to M8 (A8 O'Bridge to Jct 23 Slip Rd Entry), Eastbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M8 Jct 28A WB Offslip - Jct 29 WB Onslip - Total Closure
Location:M8 (Slip Entry From A737 Int to Slip Off M8 Eb) to M8 (Slip Off M8 Eb to A737 Rbt), Westbound
Start time:15th of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Div 1 A737 – Linclive – Return A737 EB, Offslip – St James
Div 2 Follow Div 1 and continue - A726 Barnsford Road travel through several roundabouts to east most roundabout at Erskine Bridge - take 1st exit onto slip road for M898 to Junction 30 M8 Craigton – bear right to join slip road for M8 westbound.
M8 Jct 29 WB Offslip - Total Closure
Location:M8 (Slip Off M8 Wb to A737 Rbt), Westbound
Start time:15th of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Div 1 A737 – Linclive – Return A737 EB - Offslip – St James
Div 2 Airport onslip - M8 EB Jct 28 onslip - Jct 27 EB Offslip - Return Jct 27 WB Onslip to follow Div 1
M8 Jct 29 WB Onslip - Total Closure
Location:M8 (A737 Rbt to M8 Wb From St A737), Westbound
Start time:15th of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A726 Barnsford Road travel through several roundabouts to east most roundabout at Erskine Bridge - take 1st exit onto slip road for M898 to Junction 30 M8 Craigton – bear right to join slip road for M8 westbound.
M8 Jct 30 Craigton EB Total Closure
Location:M8 (Slip To M898 to Craigton Int Underpass) to M8 (Craigton Int to M898 Entry), Eastbound
Start time:22nd of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
M8 Jct 30 EB Offslip - M898 NB - Offslip - A726 Spectacles – turn right at roundabout 2nd exit onto A726 – straight ahead 2nd exit at roundabout A726 (junction with Barrhill Road) – straight ahead 2nd exit at Centrholm Roundabout continuing on A726 - straight ahead 2nd exit at roundabout A726 (junction with Parkway / Old Greenock Road) – straight ahead 2nd exit at roundabout (junction with A8 Greenock Road) continuing on A726 – straight ahead 2nd exit at roundabout (junction with Inchinnan Drive) – continue on A726 to St James’ Interchange roundabout thereafter follow permanent signs.
M8 Jct 30 EB Onslip- Total Closure
Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Craigton Int to M898 Entry), Eastbound
Start time:21st of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A726 - Spectacles – turn right at roundabout 2nd exit onto A726 – straight ahead 2nd exit at roundabout A726 (junction with Barrhill Road) – straight ahead 2nd exit at Centrholm Roundabout continuing on A726 - straight ahead 2nd exit at roundabout A726 (junction with Parkway / Old Greenock Road) – straight ahead 2nd exit at roundabout (junction with A8 Greenock Road) continuing on A726 – straight ahead 2nd exit at roundabout (junction with Inchinnan Drive) – continue on A726 to St James’ Interchange roundabout thereafter follow permanent signs.
M8 Kingston Br EB- Lane 1 closure
Location:M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry) to M8 (Jct 20 Slip Rd Entry to Jct 19 Off Slip), Eastbou
Start time:22nd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 Sec c/way Jct 21 onslip WB - Total Closure
Location:M74 (Carnoustie St Crossroads to Entry M8 Slip), Westbound
Start time:27th of July 2024, 9:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Scotland St, Seaward St, Paisley Rd, Paisley Rd West, Helen St
End
M8 Sec c/way Seaward St onslip WB - Total Closure
Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Westbound
Start time:27th of July 2024, 9:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Seaward St, Paisley Rd, Paisley Rd West, Helen St
End
M8 WB 27 offslip - Total Closure
Location:M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip) to M8 (Slip Off M8 Wb to A741 Renfrew Rd), We
Start time:5th of July 2024, 8:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Overnight
Leave by taking JCT 26 offslip - Hillington Roundabout – take 3rd exit onto A736 to Hillington – take 1st exit onto A8 Glasgow Road/Glebe Street to traffic light junction (A741 Paisley Road) – turn left onto Paisley Road to roundabout - take 2nd exit - cross over M8 to Renfrew Rd - End
Daytime
Continue M8 WB - Jct 29 St James - return M8 EB Jct 27 offslip
M8 WB Jct 15 to Jct 18 offside and adjacent - Lane Closures
Location:M8 (M8 Overbridge to Entry M8 Wb) to M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19), Westbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 WB Jct 17 offslip - Slip Closure
Location:M8 (Start Slip To M8 to Entry M8 Wb), Westbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 west- leave m8 at jct 19 for Argyle st-8 turn right at jct onto Argyle st- turn right at jct onto North street- follow to Charing cross- end
M8 WB Jct 21 to Jct 22 Lane 3 & 4 Closure
Location:M74 (Start Ded. Lane to M8 & M77 Split) to M74 (M8 & M77 Split to End Of M74), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 WB Jct 21 onslip from Carnoustie St on slip - Slip Closure
Location:M74 (Carnoustie St Crossroads to Entry M8 Slip), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
North diversion; follow Carnoustie st- at Jct turn left onto Paisley Rd- turn left onto Seaward St-re Join M8 west- end.
South diversion; follow Carnoustie- at Jct turn right onto Scotland St- rejoin M8 west- end
M8 WB 26 onslip - Total Closure
Location:M8 (Hillington Int Rbt to Entry M8 Wb) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), We
Start time:5th of July 2024, 8:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Hillington Roundabout – take 3rd exit onto A736 to Hillington – take 1st exit onto A8 Glasgow Road/Glebe Street to traffic light junction (A741 Paisley Road) – turn left onto Paisley Road to roundabout - take 2nd exit - cross over M8 to roundabout – take 3rd exit to rejoin M8 westbound at Junction 27 Arkleston.
M8 WB J11 off slip - Slip Closure
Location:M8 (Start Wb Off Slip Junction 11 to End Wb Off Slip Junction 11), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 West- leave M8 jct 15 Castle St- turn right at jct- return M8 Jct 15 East- leave M8 jct 11- end
M8 WB J11 on slip - Slip Closure
Location:M8 (Start Wb On Slip Junction 11 to End Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on B765 - join M8 EB J11 - leave M8 J10 Auchinlea Way - turn right onto Westerhouse Rbt - rejoin M8 WB- end
M8 WB J12 off slip - Slip Closure
Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (2 Way Slip to Cumbanauld Rd Jct), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 west- leave M8 jct 15 Castle St- turn right at jct- return M8 Jct 15 east- leave M8 jct 12- end
M8 WB J12 on slip - Slip Closure
Location:M8 (Cumbanauld Rd to 2 Way Slip) to M8 (Jct 12 Off Slip to Jct 12 Entry Slip), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A80 Cumbernauld Road- at jct turn right Alexandra Parade- turn right onto Alexandra Park st- rejoin M8 west at jct 14- end
M8 WB J12 to J13 - Lane Closure
Location:M8 (Jct 12 Wb On Slip to Off Slip To M80) to M8 (Off Slip To M80 to Entry Slip From M80), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 WB J13 off slip - Slip Closure
Location:M8 (Off Slip To M80 to Entry Slip From M80) to M8 (Start M8 Slip to End Slip), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 west- leave M8 jct 15 Castle St- turn right at jct- turn right onto Royston Rd- at rbt take 1st exit onto Blochairn Rd- at rbt take 2nd exit Provan Rd- end
M8 WB J29 off slip to St James IC - Slip Closure
Location:M8 (Slip Off M8 Wb to A737 Rbt), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 west- leave M8 jct 30 to M898- leave M898 to spectacles- at rbt take 3rd exit- at rbt take 2nd exit onto M898 north- rejoin M8 east- leave M8 at jct 29- end
M8 WB J29 on slip St James IC - Slip Closure
Location:M8 (A737 Rbt to M8 Wb From St A737), Westbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on St James Rbt - take 2nd exit for M8 east - leave M8 at J27- at rbt take 1st exit Renfrew Rd - at take rbt 3rd exit onto M8 west- end
M8 WB Jct 15 on slip from Stirling Rd - Slip Closure
Location:M8 (A803 Exit to Entry Wb M8) to M8 (Entry M8 Wb to Jct 16 Off Slip), Westbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A803 north- leave A803 for A804- turn left onto Royston Rd- turn left onto A803 south- rejoin M8 at jct 15 lane onslip- end
M8 WB Jct 21 on Slip from Carnoustie Street- Total Closure
Location:M74 (Carnoustie St Crossroads to Entry M8 Slip), Westbound
Start time:30th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Carnoustie St, Scotland St, Seaward St on slip
end
M8 WB Jct 22 - HS Closure
Location:M8 (M77 Int Off Slip to M77 Int On Slip), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Hard Shoulder Closure.
M8 WB Jct 22 Seward Street- Slip Closure
Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Westbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
circle Rbt and take 2nd exit onto Scotland st- turn left onto Carnoustie st- rejoin M8 sec c/way east - end
M8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure
Location:M74 (M8 & M77 Split to End Of M74) to M77 (Off Slip From M8 Wb to Entry To M77 Sb), Westbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 WB Jct 23 offslip to Dumbreck Road - Slip Closure
Location:M8 (Jct 23 Off Slip to B768 Dumbrek Rd), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue onto M77 south- leave M77 at jct 1- at jct turn right onto Dumbreck Rd- end
M8 WB Jct 24 Offslip to Helen Street - Slip Closure
Location:M8 (Wb Jct 24 Off Slip to Helen St Jct), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 west- leave m8 at jct 26- circle rbt and rejoin m8 east- follow m8 east- leave m8 at jct 24- end
M8 WB Jct 26 - 27 - Daytime Lane closures
Location:M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), Westbound
Start time:6th of July 2024, 6:01am
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Lane Closure.
M8 WB Jct 26 - 27 - Total Closure
Location:M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip) to M8 (Renfrew Rd Off Slip to A741 Renfrew Rd
Start time:5th of July 2024, 8:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Leave by taking JCT 26 offslip - Hillington Roundabout – take 3rd exit onto A736 to Hillington – take 1st exit onto A8 Glasgow Road/Glebe Street to traffic light junction (A741 Paisley Road) – turn left onto Paisley Road to roundabout - take 2nd exit - cross over M8 to roundabout – take 3rd exit to rejoin M8 westbound at Junction 27 Arkleston.
M8 WB Jct 26 -27 - Lane Closure
Location:M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Landscape Maintenance
Traffic Management:
Lane Closure.
M8 WB Jct 26 on slip from Hillington IC - Slip Closure
Location:M8 (Hillington Int Rbt to Entry M8 Wb) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), We
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue onto Hillington road- at roundabout take 1st exit onto Glasgow rd- rbt 2nd exit onto Glebe st- jct turn left onto A741 Paisley rd- rbt take 2nd exit- end
M8 WB Jct 27 Lane Closures
Location:M8 (A741 Renfrew Rd O'Br to Start White Cart Viaduct Wb) to M8 (End Of Viaduct Wbnd to Slip Road Off
Start time:6th of August 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Lane Closure.
M8 WB Jct 27 On slip Total Closure
Location:M8 (Slip From Renfrew Rd Rbt to Start White Cart Viaduct) to M8 (Start White Cart Viad Wb to End Of
Start time:6th of August 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
Follow Diversion signs- Join M8 EB Jct 27 on - Exit Jct 26 EB Off - Turn - Join M8 WB 26 On slip - End
M8 WB Jct 29 @ St James IC HS closure
Location:M8 (Slip Off Wb M8 to Mid Point A737 Bridges) to M8 (Mid Point A737 Bridges to Entry Slip), Westboun
Start time:4th of July 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Hard Shoulder Closure.
M8 WB Jct 30 off slip Slip Closure
Location:M8 (Slip Off M8 Wb to Greenock Rd O'Bridge), Westbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 West- leave M8 at jct 31- take 4th exit onto M8 East- leave M8 at jct 30- end
M8 WB Junction 3 off slip. Road Closure
Location:M8 (Slip Road Split to End Of On Slip), Westbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Ecological Survey
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted to Livingston east roundabout. Take the first exit onto A899 Livingston Road
M8 WB Junction 3 off slip. Road Closure
Location:M8 (Slip Road Split to End Of On Slip), Westbound
Start time:2nd of August 2024, 8:00pm
Description:Works:
Ecological Survey
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted to Livingston east roundabout. Take the first exit onto A899 Livingston road
M8 WB M74 Jct 1 - 22 Sec Cway - Closure
Location:M74 (M8 & M77 Split to End Of M74) to M8 (Wb Jct 24 Off Slip to Wb Jct 24 On Slip), Westbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
Continue onto M77 south- leave M77 Jct 1- at Jct turn right onto Dumbeck Rd- at Jct turn left onto Paisley Rd- at Rbt take 2nd exit onto Helen St- rejoin M8 west Jct 24- end.
M8 WB on to Kingston Br - Lane Closure
Location:M8 (Woodlands Rd O'Br to Slip Off M8 Jct 19) to M8 (Off Slip Jct 20 to M77 In Jct 22), Westbound
Start time:23rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 West St on slip - slip closure
Location:M8 (Jct Gloucester / West Rd To Start Of Elevated Sect to Start Of Elevated Section) to M8 (Slip Off
Start time:5th of August 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
Div 1: West St. – Kingston Street – Commerce St. – GV Bridge – Broomielaw – North St. – Jct19 Anderston e/b on slip
M8 Westbound Baillieston off-slip - Nearside lane closure
Location:A8 (Bargeddie Underbridge to Baillieston Off Slip) to A8 (Slip Rd Off A8 Wb to Bailleston Rbt), West
Start time:10th of July 2024, 8:00pm
Description:Works:
Inspections: Infrastructure / Assets
Traffic Management:
Lane Closure.
M8 Westbound Junction 6A Chapelhall on-slip - Total closure
Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip) to A8 (Chapelhall Overbridge to Eurocentra
Start time:17th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
Diversion Information:
A8 WB, M8 WB Jct 7 Eurocentral On-slip.
M8 Westbound Junction 7 to Junction 8 - Nearside lane closure
Location:A8 (Shawhead Overbridge to Bargeddie) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Northbo
Start time:17th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
M8 Westbound Newhouse overbridge - Nearside lane closure
Location:M8 (End Of Se Unit to A73 On Slip), Westbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M8 Westbound between Junction 8 off-slip to Junction 8 on-slip - Nearside lane closure
Location:A8 (Bargeddie Underbridge to Baillieston Off Slip) to M8 (Start M8 Bailleston to Railway Underbridge
Start time:7th of July 2024, 8:00pm
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
M8 Westbound to A725 Southbound link road - Total closure
Location:A8 (Orchard Farm Access to Shawhead Overbridge) to A725 (Start 2 Lane to Diamond Int. O/B), Westboun
Start time:24th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M8 Westbound, A8(M) Baillieston Roundabout, M73 Southbound Junction 2 on-slip.
M8 Westbound to A725 Southbound link road - Total closure
Location:A8 (Orchard Farm Access to Shawhead Overbridge) to A725 (Start 2 Lane to Diamond Int. O/B), Westboun
Start time:18th of July 2024, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M8 WB Jct 8 Off-slip, A8(M) Baillieston Rbt, A8 Swinton Rbt, A8 EB Bargeddie Rbt, A8 EB Shawhead Off-slip.
M8 Woodside - M8 EB Jct 18 (Charing X) On Slip - Closure
Location:M8 (Sauchiehall Jct to Entry M8 Eb) to M8 (Eb On Slip to Entry From A82), Eastbound
Start time:4th of August 2024, 10:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Local Traffic diverted along NB St Georges Rd to join mainline diversion to Jct 16 (Craighall).
No LEZ camera's affected.
M8 Woodside - M8 EB Jct 18 to Jct 16 - Closure
Location:M8 (Woodlands Rd O'Bridge to Entry M8 Eb) to M8 (Jct 16 On Slip to Jct 15 Off Slip), Eastbound
Start time:4th of August 2024, 10:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
M8 Traffic diverted off at Jct 18 (St Georges Rd) then follow NB St Georges Rd/SB Garscube Rd/EB Dobbie's Loan then back on at Jct 16 (Craighall).
No LEZ camera's affected
M8 Woodside - M8 EB Jct 19 (Anderston) On Slip - Closure
Location:M8 (Slip Off M8 Eb to Bothwell St) to M8 (Start On Slip to Entry M8 Eb), Eastbound
Start time:4th of August 2024, 10:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Local traffic diverted via NB North St/St Georges rd to join mainline diversion to Jct 16 (Craighall).
No LEZ camera's affected.
M8 sec c/way Seaward St onslip WB - Total Closure
Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Westbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
Scotland St, Carnoustie St, M8 WB On slip,
End
M8 sec c/way east- Lane 3 and 4 closure
Location:M77 (Lhs Slip To M8 to Entry To M8) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound
Start time:29th of July 2024, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Lane Closure.
M80 Jct 2 to Jct 1 SB - Lane Closure
Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs, Inspections
Traffic Management:
Lane Closure.
M80 N/B J3 Hornshill on-slip - Road Closure
Location:M80 (Hornshill Int to Entry Slip) to M80 (Hornshill Int. O/B to Lindsaybeg Rd O/B), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A806 Rdbt - A806 S/B - Crowwood Rdbt - A80 N/B - M73 N/B J3 on slip - M73 N/B - end.
M80 N/B J4a Low Wood Off Slip - Slip Closure
Location:M80 (North Rd O/B to Auchenkilns O/B) to M80 (Lane Split to Chevron Nose), Northbound
Start time:7th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M80 N/B - M80 N/B J5 off slip - B8048 - Back O'Hill Rdbt. - end.
M80 N/B J5 Auchenkilns on-slip - Road Closure
Location:M80 (Northside Rbt to Start Ded. Slip) to M80 (Auchenkilns O/B to Old Inns U/B), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
B8048 - Back O'Hill Rdbt - B8048 - Craiglinn Rdbt - B8048 - Blackwood Rdbt - Howe Road - B802 - A803 WB - M80 N/B J7 Haggs on slip - end.
M80 N/B J5 Auchenkilns on-slip - Road Closure
Location:M80 (Northside Rbt to Start Ded. Slip) to M80 (Auchenkilns O/B to Old Inns U/B), Northbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
B8048 - Back O'Hill Rdbt - B8048 - Craiglinn Rdbt - B8048 - Blackwood Rdbt - Howe Road - B802 - A803 WB - M80 N/B J7 Haggs on slip - end.
M80 N/B J6 Old Inns on-slip - Road Closure
Location:M80 (2-Way Slip to Nb Entry Slip) to M80 (Old Inns U/B to Start 3-Lane), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 S/B J6 On slip - M80 S/B - M80 S/B J5 Auchenkilns off slip - B8048 - Back O'Hill Rdbt - B8048 - Craiglinn Rdbt - B8048 - Blackwood Rdbt - Howe Road - B802 - A803 WB - M80 N/B J7 Haggs on slip - end.
M80 N/B J6 Old Inns on-slip - Road Closure
Location:M80 (2-Way Slip to Nb Entry Slip) to M80 (Old Inns U/B to Start 3-Lane), Northbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 S/B J6 On slip - M80 S/B - M80 S/B J5 Auchenkilns off slip - B8048 - Back O'Hill Rdbt - B8048 - Craiglinn Rdbt - B8048 - Blackwood Rdbt - Howe Road - B802 - A803 WB - M80 N/B J7 Haggs on slip - end.
M80 N/B J6a Castlecary on-slip - Road Closure
Location:M80 (T Junction to Entry Slip) to M80 (Start 3-Lane to Haggs Nb Split), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
B816 E/B - Bridge Street - B816 - High Street - Bonnybridge Road W/B - Glasgow Road W/B - Kilsyth Road W/B - J7 N/B on-slip - end.
M80 N/B J6a Castlecary on-slip - Road Closure
Location:M80 (T Junction to Entry Slip) to M80 (Start 3-Lane to Haggs Nb Split), Northbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
B816 E/B - Bridge Street - B816 - High Street - Bonnybridge Road W/B - Glasgow Road W/B - Kilsyth Road W/B - J7 N/B on-slip - end.
M80 N/B between J3 Hornshill and J4 Westfield - Road Closure
Location:M80 (East Dumbarton Boundary to Hornshill Overbridge) to M80 (Auchengeich Rd O/B to Westfield Link O
Start time:3rd of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M80 N/B J3 off slip - A806 Rdbt - A806 S/B - Crowwood Rdbt - A80 N/B - M73 N/B J3 on slip - M73 N/B - end.
M80 N/B between J4a Low Wood and J7 Auchenkilns - Road Closure
Location:M80 (North Rd O/B to Auchenkilns O/B) to M80 (Mainline Split to End Of M80 Dbfo), Northbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 N/B J4a off slip - Back O'Hill Rdbt - B8048 - Craiglinn Rdbt - B8048 - Blackwood Rdbt - Howe Road - B802 - A803 WB - M80 N/B J7 Haggs on slip - end.
M80 N/B between J4a Low Wood and J7 Auchenkilns - Road Closure
Location:M80 (North Rd O/B to Auchenkilns O/B) to M80 (Mainline Split to End Of M80 Dbfo), Northbound
Start time:15th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 N/B J4a off slip - Back O'Hill Rdbt - B8048 - Craiglinn Rdbt - B8048 - Blackwood Rdbt - Howe Road - B802 - A803 WB - M80 N/B J7 Haggs on slip - end.
M80 N/B between J6a Castlecary on-slip to end of the M80 DBFO - Lane Closures
Location:M80 (Start 3-Lane to Haggs Nb Split) to M80 (North Extent Nb M80 Dbfo to Slip Off To M876 Bankhead),
Start time:8th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M80 N/B between J7 Haggs on-slip to end of DBFO - Lane Closures
Location:M80 (Mainline Split to End Of M80 Dbfo) to M80 (North Extent Nb M80 Dbfo to Slip Off To M876 Bankhea
Start time:8th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M80 NB J2 on slip - Slip Closure
Location:M80 (B765 Rbt (N) to M80 Nb Slip Entry), Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue B765 - join M80 SB J2 - leave M80 SB at J1 - at rbt take 2nd exit - at jct turn right onto Provan Road - at mini rbt take 2nd exit onto M80 NB J1 onslip - end
M80 NB Jct 1 on slip from Blochairn Road - Slip Closure
Location:M80 (Blochairn Road to Slip Rd Entry M80 Nb) to M80 (M80 Nb Slip Entry to Slip Off To B765), Northbo
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
at rbt follow Provan Rd- turn left and join M8 east at jct 13- continue M8 east- leave M8 at jct 12- at jct turn left onto A80- at jct turn left onto Royston Road- at rbt take 2nd exit onto B765 Robroyston Rd- at rbt take 4th exit onto B765- at rbt take 2nd exit onto M80 north- end
M80 NB Jct 2 offslip to Robroyston Link Road - Slip Closure
Location:M80 (Slip Off To B765 to South Extent Of M80 Dbfo) to M80 (Slip Off M80 Nb to B765 Rbt (N)), Northbo
Start time:4th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 12- at jct turn left onto A80- at jct turn left onto Royston Road- at rbt take 2nd exit onto B765 Robroyston Rd- at rbt take 4th exit onto B765- end
M80 S/B Between J4 Westfield and J3 Hornshill - Lane Closure
Location:M80 (Westfield Link Rd O/B to Auchengeich Rd O/B) to M80 (Hornshill O/B to N.Lanark Boundary), South
Start time:7th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M80 S/B Between J5 Auchenkilns and the M73/M80 Diverge (J4) - Lane Closures
Location:M80 (Auchenkilns O/B to Start 3-Lane) to M80 (Start 3-Lane to End 3-Lane), Southbound
Start time:6th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M80 S/B J3 Hornshill on-slip - Road Closure
Location:M80 (Hornshill Int to Entry Slip) to M80 (Hornshill O/B to N.Lanark Boundary), Southbound
Start time:11th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Hornshill rbt. - A806 - Crowwood rbt - Cumbernauld Road - Royston Road - B765 - Robroyston Road - B765 - J2 N/B on-slip - end.
M80 S/B J4 Westfield on-slip - Road Closure
Location:M80 (Westfield Link Rd to Entry Slip) to M80 (Westfield Link Rd O/B to Auchengeich Rd O/B), Southbou
Start time:11th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Mollins Road - Mollinsburn I/C - A80 S/B - Crowwood rbt - Cumbernauld Road - Royston Road - B765 - Robroyston Road - B765 - J2 N/B on-slip - end.
M80 S/B J4a Low Wood On Slip - Slip Closure
Location:M80 (Diverge A8011 to Entry Slip) to M80 (Start 3-Lane to End 3-Lane), Southbound
Start time:6th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8011 - Back O'Hill Rdbt - B8048 - M80 S/B J5 on slip - M80 S/B - end.
M80 S/B J6 Old Inns on-slip - Road Closure
Location:M80 (Jn With A8011 to Sb Entry Slip) to M80 (Old Inns U/B to Auchenkilns O/B), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A8011 - Town Centre East Rdbt - A8011 - Town Centre West Rdbt - A8011 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end.
M80 S/B J6 Old Inns on-slip - Road Closure
Location:M80 (Jn With A8011 to Sb Entry Slip) to M80 (Old Inns U/B to Auchenkilns O/B), Southbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A8011 - Town Centre East Rdbt - A8011 - Town Centre West Rdbt - A8011 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end.
M80 S/B J6 Old Inns on-slip - Road Closure
Location:M80 (Jn With A8011 to Sb Entry Slip) to M80 (Old Inns U/B to Auchenkilns O/B), Southbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A8011 - Town Centre East Rdbt - A8011 - Town Centre West Rdbt - A8011 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end.
M80 S/B J7 Haggs on-slip - Road Closure
Location:M80 (Roundabout to Entry Slip) to M80 (Start 3lane to Castlecary Sb Split), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A803 W/B - B802 - Howe Road - Blackwood Rdbt - B8048 - Craiglinn Rdbt - B8048 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end.
M80 S/B J7 Haggs on-slip - Road Closure
Location:M80 (Roundabout to Entry Slip) to M80 (Start 3lane to Castlecary Sb Split), Southbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A803 W/B - B802 - Howe Road - Blackwood Rdbt - B8048 - Craiglinn Rdbt - B8048 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end.
M80 S/B J7 Haggs on-slip - Road Closure
Location:M80 (Roundabout to Entry Slip) to M80 (Start 3lane to Castlecary Sb Split), Southbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A803 W/B - B802 - Howe Road - Blackwood Rdbt - B8048 - Craiglinn Rdbt - B8048 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end.
M80 S/B between J3 Hornshill and J2 Robroyston - Lane Closure
Location:M80 (Hornshill O/B to N.Lanark Boundary) to M80 (N.Lanarkshire C.Boundary to South Extent Sb M80 Dbf
Start time:5th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M80 S/B between J7 Haggs and J5 Auchenkilns - Road Closure
Location:M80 (Start 3lane to Castlecary Sb Split) to M80 (Auchenkilns O/B to Start 3-Lane), Southbound
Start time:10th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 S/B J7 Haggs off slip - A803 WB - B802 - Howe Road - Blackwood Rdbt - B8048 - Craiglinn Rdbt - B8048 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end./
M80 S/B between J7 Haggs and J5 Auchenkilns - Road Closure
Location:M80 (Start 3lane to Castlecary Sb Split) to M80 (Auchenkilns O/B to Start 3-Lane), Southbound
Start time:24th of July 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 S/B J7 Haggs off slip - A803 WB - B802 - Howe Road - Blackwood Rdbt - B8048 - Craiglinn Rdbt - B8048 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end./
M80 S/B between J7 Haggs and J5 Auchenkilns - Road Closure
Location:M80 (Start 3lane to Castlecary Sb Split) to M80 (Auchenkilns O/B to Start 3-Lane), Southbound
Start time:5th of August 2024, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
M80 S/B J7 Haggs off slip - A803 WB - B802 - Howe Road - Blackwood Rdbt - B8048 - Craiglinn Rdbt - B8048 - Back O'Hill Rdbt - B8048 - J5 Auchenkilns S/B on-slip - end./
M80 S/B between M73 diverge (J4) and J2 Robroyston - Road Closure
Location:M80 (End Of 3 Lane to Westfield Rd O/B) to M80 (N.Lanarkshire C.Boundary to South Extent Sb M80 Dbfo
Start time:11th of July 2024, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 S/B Link Road - M73 SB - M73 S/B Jct 2 Gartcosh off slip - M73 N/B Jct 2 Gartcosh on slip - M73 N/B - M73 N/B Jct 3 Moodiesburn off slip - A80 S/B - Royston Road - B765 - Robroyston Road - B765 - J2 N/B on-slip - end.
M80 SB J1 off slip - Slip Closure
Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb) to M80 (Slip Off M80 Sb to Maxwelton Rbt), Southbou
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M80 onto M8 WB - leave M8 J15 Castle St - turn right onto Castle St - turn right onto M8 EB J15 - leave M8 at J14 - turn right onto Alexandria Park St - turn left onto Alexandra Parade - turn left onto A80 - turn left onto Provan Road - end
M80 SB J2 off slip - Slip Closure
Location:M80 (Slip Off From M80 Sb to B765 Rbt (S)), Southbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M80 SB - leave M80 J1 - Rbt take 2nd exit - at Jct turn right onto Provan Rd - at mini Bbt take 2nd exit onto M80 NB J1 on slip - leave M80 NB J2 - end
M80 SB J2 on slip - Slip Closure
Location:M80 (B765 Rbt (S) to Entry M80 Sb) to M80 (Slip Entry From B765 to Slip Rd Off M80 Sb), Southbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on B765 - rbt 1st exit - rbt 1st exit - rbt 1st exit onto Robroyston Rd - jct turn right onto A80, Cumbernauld Rd - follow signs for M8 east/west - end
M80 SB Jct 1 to M8 WB Jct 13 - Total Closure
Location:M80 (Slip Entry From B765 to Slip Rd Off M80 Sb) to M8 (On Slip From M80 to Jct 14 Off Slip), Southb
Start time:12th of July 2024, 8:00pm
Description:Works:
Barrier Repair, Inspections
Traffic Management:
Road Closure.
Diversion Information:
follow diversion
M8 Jct 13 EB on slip, M8 EB, M8 Jct 12 EB Off slip, Cumbernauld Rd, M8 Jct 12 WB On, End
M80 SB Jct 9 to Jct 8 - Lane Closure
Location:M80 (Foot Green O'Bridge to Northfield Underpass), Southbound
Start time:5th of July 2024, 6:30am
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M876 & A876 - NB - Bowtrees Jct to Higgins' Neuk Rbt - Lane Closure
Location:M876 (Kinnaird House to Bowtrees Int) to A876 (Bowtrees Int to Higgins Neuk Rbt), Northbound
Start time:5th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure (50mph)
M876 - NB - Jct 3 off slip
Location:M876 (Kinnaird House to Bowtrees Int) to M876 (Slip Off To Bowtrees Int to Bowtrees Int), Northbound
Start time:22nd of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
Northbound off-slip traffic diverted to follow M876/A876 Mainline towards Higgins' Neuk Roundabout. Take the 4th exit back down the A876 towards Bowtrees Jct southbound off-slip.
M876 - NB - Jct 3 on slip. Closure.
Location:A876 (With: Bowtrees Int Slip Road On From A905 to With: Bowtrees Int Slip Road On From A905) to A87
Start time:24th of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
Northbound on-slip traffic diverted from A905 to Bowtrees southbound onslip and onto M876. Traffic to continue on M876 towards Junction 2 (North Broomage). Traffic to be directed to Jct 2 Northbound Onslip via Stirling Rd. Diversion to continue back up M876 Northbound until Bowtrees Jct Mainline.
M876 - SB - Jct 3 off slip. Closure.
Location:A876 (Slip Road Off To A905 to Bowtrees Int), Southbound
Start time:23rd of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
Southbound Offslip traffic initially diverted prior to slip via parallel local authority road (Advance Signage in place). Secondary Diversion in place via M876 Southbound, Jct 2 (North Broomage), Stirling Rd, M876 Northbound & Bowtrees Jct NB Offslip.
M876 - SB - Jct 3 on slip . Closure.
Location:M876 (Bowtrees Int to Slip On From Bowtrees Int) to M876 (Bowtrees Int to Kinnaird House), Southboun
Start time:22nd of July 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
Southbound on-slip traffic diverted from A905 to Bowtrees northbound on-slip towards Higgins Neuk Rbt. Take the 4th exit back down the A876 towards Bowtrees Jct & continue on the M876 Mainline.
M898 Craigton IC NB Lane Closures
Location:M8 (Slip Off M8 Wb to Greenock Rd O'Bridge) to M898 (Craigend O'Bridge to A726 Rbt), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
M898 EB off slip to M8 Jct 30 Slip Closure
Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Craigton Int to M898 Entry), Eastbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on M8 West- leave M8 at jct 31- take 4th exit onto M8 East- end
M898 NB off slip to A726 - Slip Closure
Location:M898 (Craigend O'Bridge to A726 Rbt) to M898 (Slip Off From M898 Sb to A726 Rbt), Northbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A898 north- leave A898 and join A82 SB - leave A82 at Mountblow Road- turn right and join A82 north - turn left onto A898 Erskine Br- leave A898 at Spectacles off slip - end
M898 NB Craigton IC to Erskine Bridge - Lane Closure
Location:M8 (Slip Off M8 Wb to Greenock Rd O'Bridge) to A898 (M898 to Start Of Cycle Way), Northbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M898 NB Spectacles on slip - Slip Closure
Location:A898 (A726 Rbt to On Slip To A898) to A898 (M898 to Start Of Cycle Way), Northbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
circle rbt and stay on A726- at rbt take 1st exit- at Barholm Rbt take 2nd exit- at Centreholm Rbt take 2nd exit- at Southholm Rbt take 2nd exit- at Red Smiddy Rbt take 1st exit onto Greenock Rd- at rbt take 1st exit Greenock Rd at jct turn left onto Inchinnan Rd- at rbt take 2nd exit- at jct go straight ahead onto Glebe St- at rbt take 2nd exit for Glasgow Rd- at rbt take 2nd exit for Renfrew Rd- at rbt take 2nd exit on Shieldhall Rd- at rbt take 1st exit onto A739 Clyde Tunnel- continue onto Crow Rd- take left onto A82 Great Western Rd- at rbt take 2nd exit- at Kilbowie Rbt take 3rd exit- end
M898 SB Erskine Bridge to M8 Onslip Total Closure
Location:M898 (A726 Rbt to Entry M898 Nb) to M898 (On Slip From A726 to Off Slip To M8), Southbound
Start time:21st of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A726 - Spectacles – turn right at roundabout 2nd exit onto A726 – straight ahead 2nd exit at roundabout A726 (junction with Barrhill Road) – straight ahead 2nd exit at Centrholm Roundabout continuing on A726 - straight ahead 2nd exit at roundabout A726 (junction with Parkway / Old Greenock Road) – straight ahead 2nd exit at roundabout (junction with A8 Greenock Road) continuing on A726 – straight ahead 2nd exit at roundabout (junction with Inchinnan Drive) – continue on A726 to St James’ Interchange roundabout thereafter follow permanent signs.
M898 SB onslip from A726 Slip Closure
Location:M898 (A726 Rbt to Entry M898 Nb) to M898 (On Slip From A726 to Off Slip To M8), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on A726- join A898 Erskine Br North- leave A898 to A82 South Great Western Rd- leave A82 south onto Mountblow Rd- turn right onto A82 North- turn left onto A898 South- end
M898 SB - M8 WB Onslip - Total Closure
Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Under Craigton Inter to Slip Entry From M898), Sou
Start time:21st of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A726 - Spectacles – turn right at roundabout 2nd exit onto A726 – straight ahead 2nd exit at roundabout A726 (junction with Barrhill Road) – straight ahead 2nd exit at Centrholm Roundabout continuing on A726 - straight ahead 2nd exit at roundabout A726 (junction with Parkway / Old Greenock Road) – straight ahead 2nd exit at roundabout (junction with A8 Greenock Road) continuing on A726 – straight ahead 2nd exit at roundabout (junction with Inchinnan Drive) – continue on A726 to St James’ Interchange roundabout thereafter follow permanent signs.
M898 SB A726 off slip safety coning
Location:A898 (End Of Cycle Way to M898) to A898 (A898 Off Slip to A726 Roundabout), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
No Obstruction on Carriageway or Footway.
M898 SB Old toll to Jct 30 slips - lane closure
Location:A898 (End Of Cycle Way to M898) to M898 (On Slip From A726 to Off Slip To M8), Southbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M898 SB onslip from A726 - Total Closure
Location:M898 (A726 Rbt to Entry M898 Nb), Southbound
Start time:21st of July 2024, 9:00pm
Description:Works:
Landscape Maintenance, Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A726 - Spectacles – turn right at roundabout 2nd exit onto A726 – straight ahead 2nd exit at roundabout A726 (junction with Barrhill Road) – straight ahead 2nd exit at Centrholm Roundabout continuing on A726 - straight ahead 2nd exit at roundabout A726 (junction with Parkway / Old Greenock Road) – straight ahead 2nd exit at roundabout (junction with A8 Greenock Road) continuing on A726 – straight ahead 2nd exit at roundabout (junction with Inchinnan Drive) – continue on A726 to St James’ Interchange roundabout thereafter follow permanent signs.
M898 WB off slip to M8 Jct 31 Slip Closure
Location:M8 (Greenock Road Bridge to Entry M8 Wb) to M8 (Slip From M898 to Slip Off To Ferry Int), Westbound
Start time:12th of July 2024, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue on M8 East- leave M8 at jct 29- take 5th exit onto M8 West- end
M9 - NB - Jct 7 Off-slip - Lane Closure
Location:M9 (M876 O'Bridge to 3 Lane Section Wb) to M876 (Kinnaird House to Bowtrees Int), Northbound
Start time:4th of July 2024, 6:30am
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M9 - SB - Cambusbarron - Lane Closure
Location:M9 (C4 O'Bridge Cambusbarron to M80 Junction), Southbound
Start time:5th of July 2024, 7:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M9 Bridge of Allan NB - Lane Closure
Location:M9 (A84 O'Bridge Craigforth to C34 O'Bridge Knockhill), Northbound
Start time:6th of July 2024, 12:01am
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M9 NB Jct 3 to Jct 4. Lane Closure.
Location:M9 (Burghmuir Interchange to Coal Road) to M9 (Avonbank to E Br. Lathallan), Northbound
Start time:15th of July 2024, 8:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
M90 Broxden to Craigend- signage only- N/B
Location:A90 (Start Circ. Section to End Of Circ. Section) to A90 (Rhs Turn Circ. Section to Start 2-Way Sing
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
M90 Craigend- Signage only N/B
Location:M90 (On Slip From A912 to Off Slip To M90 Interchange) to A90 (Start A90 to Kinfauns Jct), Northboun
Start time:5th of July 2024, 9:30am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
M90 Gairneybank NB - Lane closure
Location:M90 (Entry Slip From B9097 to Off Slip To A977 Rbt), Northbound
Start time:3rd of July 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
M90 Glenfarg - S/B lane 1 closure
Location:M90 (Entry Slip From A912 to Glenfarg Overbridge), Southbound
Start time:4th of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M90 Jct 1C NB On-slip. Closure.
Location:A985 (Admiralty Road Roundabout At North Point to Admiralty Road Roundabout At North Point) to M90 (
Start time:9th of July 2024, 8:00pm
Description:Works:
Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
At Kings Road Roundabout, take the 1st exit onto King's road/ B980. Follow B980 to Pitreavie Roundabout/Dunfermline. At Pitreavie Rounabout, take the 3rd exit onto A823(M) heading to Kirkcaldy/Edinburgh/M90. Using the left lane, take the M90(N) exit to Perth/Kirkcaldy/A92. Merge onto M90
M90 Milnathort, Kinross - S/B lane 1 closure
Location:M90 (Glenfarg Overbridge to Start Concrete Sb) to M90 (Entry Slip From A912 to Glenfarg Overbridge),
Start time:4th of July 2024, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M90 N/B Between Jcts 8-9 Balmanno - Hard Shoulder Closure
Location:M90 (Glenfarg Overbridge to Start Off Slip To A912), Northbound
Start time:5th of August 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Lane Closure (50mph)
M90 N/B Craigend towards Broxden Rbt - S/B Lane 1 closures
Location:M90 (On Slip to A9 Broxden Rbt), Southbound
Start time:23rd of September 2024, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure (50mph)
M90 NB Jct 1 to 1A. Lane Closures.
Location:M90 (Farm Rd O/B to Chevron) to Off Network, Northbound
Start time:3rd of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Lane Closure.
M90 NB Jct 1B on-slip. Road Closure.
Location:A90 (Castlelandhill Rd Rbt to Castlelandhill Rd Rbt) to A90 (B980 Junction to End Of Nb Slip Road En
Start time:4th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Take 4th exit onto B981, Milne Road, Barham Road. Take 3rd exit onto Millennium Avenue. Take 2nd exit onto Castle Road, then continue on Castle Road until King's Road Roundabout and take 2nd exit onto B980 to Pitreavie Roundabout then take the 3rd exit onto A823(M) to M90 Jct 2 NB on-slip.
M90 NB Jct 1B to Jct 2. Road Closure.
Location:A90 (Frb to Ferrytoll Jn Ub) to M90 (Off Slip To A985 to Mastertown O'Bridge), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Take Jct 1B NB off-slip. Take 1st exit onto B981, Milne Road, Barham Road. Take 3rd exit onto Millennium Avenue. Take 2nd exit onto Castle Road, then continue on Castle Road until King's Road Roundabout and take 2nd exit onto B980 to Pitreavie Roundabout then take the 3rd exit onto A823(M) to M90 Jct 2 NB on-slip.
M90 NB Jct 1C off-slip. Road Closure.
Location:A90 (Exit Slip to Admiratly Jn Rbt) to A985 (Admiralty Road Roundabout At North Point to Admiralty R
Start time:4th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Take Jct 1B NB off-slip. Take 1st exit onto B981, Milne Road, Barham Road. Take 3rd exit onto Millennium Avenue. Take 2nd exit onto Castle Road, then continue on Castle Road until King's Road Roundabout and take 3rd exit onto A985. Continue to Admiralty Roundabout.
M90 NB Jct 1C on-slip. Road Closure.
Location:M90 (On Slip to Off Slip), Northbound
Start time:4th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Take 4th exit returning A985 to King's Road roundabout. Take 3rd exit onto B980 to Pitreavie Roundabout then take the 3rd exit onto A823(M) to M90 Jct 2 NB on-slip.
M90 NB Jct 2 off-slip. Road Closure.
Location:M90 (Off Slip To A985 to Mastertown O'Bridge) to M823 (N/B & S/B Slips From M90 to A823 Rbt), Northb
Start time:4th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Take Jct 1B NB off-slip. Take 1st exit onto B981, Milne Road, Barham Road. Take 3rd exit onto Millennium Avenue. Take 2nd exit onto Castle Road, then continue on Castle Road until King's Road Roundabout and take 2nd exit onto B980 to Pitreavie Roundabout then take the 3rd exit onto A823(M) to M90 Jct 2 NB on-slip.
M90 S/B Between Jcts 9-8 Balmanno - Hard Shoulder Closure
Location:M90 (Entry Slip From A912 to Glenfarg Overbridge), Southbound
Start time:5th of August 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Lane Closure (50mph)
M90 SB Jct 1C to Jct 1B. Road Closure.
Location:M90 (M823 O'Bridge to Slip Entry From A921) to A90 (Frb to Ferrytoll Jn Ub), Southbound
Start time:8th of July 2024, 8:00pm
Description:Works:
Painting Works
Traffic Management:
Road Closure.
Diversion Information:
Exit M90 SB Jct 1C, take 2nd exit onto M90 SB Jct 1C on-slip. Continue M90 then exit M90 SB Jct 1B off-slip then take 2nd exit onto M90 SB Jct 1B on-slip.
M90 SB Jct 2 Off-slip. Hard Shoulder Closure
Location:M823 (M90 Off Slip (S) to Entry M823), Southbound
Start time:5th of July 2024, 8:00pm
Description:Works:
Inspections
Traffic Management:
Hard Shoulder Closure (60mph)
M90 Sth of Broxden - N/B Hard Shoulder closure
Location:M90 (On Slip to A9 Broxden Rbt), Northbound
Start time:11th of July 2024, 7:30pm
Description:Works:
Landscape Maintenance
Traffic Management:
Hard Shoulder Closure.