Home> Travel news> Projects and Events> A82 Dumbarton | Resurfacing

A82 Dumbarton | Resurfacing

between Strowan’s Well Road and the Abbotsford Hotel
17th of March 2025, 8:00pm to 1st of April 2025, 6:00am

Amey, on behalf of Transport Scotland, is undertaking essential drainage and resurfacing works on the A82 in Dumbarton, between Strowan’s Well Road and the Abbotsford Hotel, from Monday 17th March until Tuesday 1st April 2025.

Works will take place using signal controlled lane closures on the A82 between 8pm and 6am each night, between Monday 17th March and Sunday 23rd March, with traffic management removed by 6am on Monday 24th March.

Signal controlled lane closures will then resume between 8pm and 6am each night, between Saturday 29th March and Monday 31st March, with traffic management removed by 6am on Tuesday 1st April.

Works will alternate between the southbound and northbound carriageways during the overnight periods.

The junctions with Greenhead Road, Dunbritton Road, Strowan’s Road and Strowan’s Well Road will be closed during the overnight works with local diversions in place. Residential access will be maintained to Barnwell Road.

Access for emergency service vehicles will be maintained throughout these works.

Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.

This scheme will benefit vehicles using this route each day, by improving the condition of the carriageway and reducing the need for more extensive maintenance in the future.

How to get the latest travel and traffic information

For full information on roadworks on trunk roads in the south-west of Scotland, visit the Amey website.

You can report a defect on the network by filling out this form.

Follow Amey South West Trunk Roads on Twitter at @SWTrunkRoads.