M90 Muirmont Bridge | Expansion Joint Replacement Works
This page has been archived. For information on live or future events and roadworks view our travel news.
Amey is undertaking expansion joint replacement and localised resurfacing on the M90 Junction 9 Muirmont Bridge at Bridge of Earn in Perthshire from Monday 2nd September to Saturday 14th September.
Work will take place on the Muirmont Bridge both northbound and southbound from 7:30pm to 6:30am, each night.
To ensure the safety of roadworkers and motorists, there will be full road closures northbound and southbound of the M90 at the bridge. Closures will be between the off/on slips on both carriageways with traffic being diverted off/on using the slip roads.
During the first week, work is scheduled with total southbound closure and northbound lane 2 closure.
During the second week, work is scheduled with total northbound closure and southbound lane 2 closure.
Unfortunately, construction noise will occur during these works and Amey are working to programme operations to minimise any disturbance as much as possible.
How to get the latest travel and traffic information
For full information on roadworks on trunk roads in the north-east of Scotland, visit the Amey website.
You can report a defect on the network by filling out this form.
Follow Amey North East Trunk Roads on Twitter at @NETrunkRoads.