Planned Roadworks
You'll find more information on planned roadworks on Scotland's trunk roads below. Alternatively you can view them on our map.
A1 carriageway, linking the A1 to Dunglass Road, near the Railway bridge at Bilsdean
Location:A1 (Dunglass Bridge to U220 Bilsdean), Northbound
Start time:1st of January 2025, 6:00am
Description:Works:
Third Party Works
Traffic Management:
Road Narrowing (Two Way Working).
A7 - NB - South of Fiddleton - Closure
Location:A7 (Meikledale Farm to Jct Unthank), Northbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.
A7 - SB - South of Fiddleton - Closure
Location:A7 (Meikledale Farm to Jct Unthank), Southbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.
A1 - Thistly cross - temp lights
Location:A1 (Thistly Cross Roundabout to Spott Road Roundabout), Southbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A1 - Thistlycross RBT - Lane closure
Location:A1 (Thistly Cross Roundabout to Thistly Cross Roundabout), Eastbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
A1 N/B Cockburnspath Roundabout. Temporary Traffic Lights.
Location:A1 (C130 Cockburnspath to Cockburnspath Rbt) to A1 (Cockburnspath Rbt to Dunglass Bridge), Northboun
Start time:23rd of December 2024, 8:00am
Description:Works:
Kerbing Works
Traffic Management:
Road Narrowing (Two Way Working).
A1 NB Ayton - Contraflow
Location:A1 (Jct A1107 Burnmouth to Jct. Ayton(South)), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Contraflow (30mph)
A1 NB Reston. Lane Closure.
Location:A1 (B6438 Reston to Start Dual Cway Lemington) to A1 (Start Dual Lemington to B6437 Junction), North
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A1 S/B Cockburnspath Roundabout. Temporary Traffic Lights.
Location:A1 (Cockburnspath Rbt to Dunglass Bridge) to A1 (C130 Cockburnspath to Cockburnspath Rbt), Southboun
Start time:23rd of December 2024, 8:00am
Description:Works:
Kerbing Works
Traffic Management:
Road Narrowing (Two Way Working).
A1 SB - TTL - Eyemouth
Location:A1 (Jct. Ayton(South) to Jct (R) Redhall), Southbound
Start time:16th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A1 SB Ayton. Contraflow.
Location:A1 (Jct A1107 Burnmouth to Jct. Ayton(South)), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Contraflow (30mph)
A6091 - NB - Melrose - Temp Lights
Location:A6091 (B6374 Jct to B6361 Jct) to A6091 (Borders Gen Hosp to B6374 Jct), Northbound
Start time:3rd of February 2025, 8:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A6091 - SB - Melrose - Temp Lights
Location:A6091 (Borders Gen Hosp to B6374 Jct) to A6091 (B6374 Jct to B6361 Jct), Southbound
Start time:3rd of February 2025, 8:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A68 - NB - Lauder High Street -TTL
Location:A68 (Factor/S Park to Mid Row) to A68 (Harryburn to C85 Newmills), Northbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A68 - NB - Liliarsedge - temp lights
Location:A68 (C66 Sandystones to C52 Longnewton), Northbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A68 - NB - North of Pathhead / A6196 Rd Junction - Closure
Location:A68 (End Of S/B Climbing to A6124 Jct) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), Northbound
Start time:27th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
NB traffic to exit A68 at Pathhead onto Edgehead Rd to A6106, turn right onto A6094, rejoining A68 at Salters Road Junction.
A68 - SB - Lauder High Street - TTL
Location:A68 (Harryburn to C85 Newmills) to A68 (Factor/S Park to Mid Row), Southbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Pavement Surveys
Traffic Management:
Portable Traffic Lights (TTLS).
A68 - SB - Liliarsedge - temp lights
Location:A68 (C66 Sandystones to C52 Longnewton), Southbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A68 NB at B6414. Contraflow.
Location:A68 (A6093 Oxenford to End Of Sb Climbing Lane) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), N
Start time:20th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Contraflow.
A68 NB at B6414. Portable Traffic Lights.
Location:A68 (A6093 Oxenford to End Of Sb Climbing Lane) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), N
Start time:15th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A68 SB at B6414 Junction. Portable Traffic Lights.
Location:A68 (A6124 Fordel Jct to A6094 Salters Rd Jct) to A68 (A6093 Oxenford to End Of Sb Climbing Lane), S
Start time:15th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A68 SB at B6414. Contraflow.
Location:A68 (A6093 Oxenford to End Of Sb Climbing Lane) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), S
Start time:20th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Contraflow.
A7 - N/B - Galalaw Roundabout - Temporary Traffic Lights
Location:A7 (B6359 Appletreehall to Galalaw Rbt) to A7 (Galalaw Rbt to Boonraw), Northbound
Start time:7th of April 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - NB - Albert Road, Hawick - Temp Lights
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Northbound
Start time:20th of January 2025, 8:00am
Description:Works:
Kerbing Works, Pedestrian Crossing works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - NB - Galashiels - TEMP Traffic lights
Location:A7 (Netherbarns to A6091 Rbt), Northbound
Start time:13th of January 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - NB - South of Hawick - closure
Location:A7 (Southfield to B711 Roberton), Northbound
Start time:23rd of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.
A7 - S/B - Galalaw Roundabout - Temporary Traffic Lights
Location:A7 (Galalaw Rbt to Boonraw) to A7 (B6359 Appletreehall to Galalaw Rbt), Southbound
Start time:7th of April 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - SB - Albert Road, Hawick - Temp Lights
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Southbound
Start time:20th of January 2025, 8:00am
Description:Works:
Kerbing Works, Pedestrian Crossing works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - SB - Commercial Road Hawick - Closure
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt) to A7 (Sandbed Rbt to Sandbed Rbt), Southbound
Start time:3rd of February 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 Southbound will also be closed at Hawick with a signed diversion in place between Dovemount/ N Bridge Roundabout and Sandbed Roundabout. Road users are to follow Mart St and then B6399 to rejoin the A7 at Sandbed Roundabout. "
A7 - SB - Galashiels - TEMP Traffic lights
Location:A7 (Netherbarns to A6091 Rbt), Southbound
Start time:13th of January 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A7 - SB - South of Hawick - closure
Location:A7 (Southfield to B711 Roberton), Southbound
Start time:23rd of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.
A7 NB Hawick. Portable Traffic Lights
Location:A7 (B711 Roberton to 30mph/S Wilton Lodge Br) to A7 (30mph/S Wilton Lodge Br to Buccleuch Place), No
Start time:23rd of December 2024, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 NB Selkirk. Portable Traffic Lights
Location:A7 (A699 St.Boswells to Hill Street), Northbound
Start time:7th of January 2025, 7:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 NB north of Langholm. Portable Traffic Lights
Location:A7 (Jct Hoghill Fm to Kirkstile Br.), Northbound
Start time:16th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 SB Hawick. Portable Traffic Lights
Location:A7 (B711 Roberton to 30mph/S Wilton Lodge Br) to A7 (30mph/S Wilton Lodge Br to Buccleuch Place), So
Start time:23rd of December 2024, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 SB Selkirk. Portable Traffic Lights
Location:A7 (A699 St.Boswells to Hill Street), Southbound
Start time:7th of January 2025, 7:00am
Description:Works:
Footway Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7 SB north of Langholm. Portable Traffic Lights
Location:A7 (Jct Hoghill Fm to Kirkstile Br.), Southbound
Start time:16th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7- NB - Hawick Commercial Road - Temp lights
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Footway Works, Kerbing Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7- SB - Hawick Commercial Road - Temp lights
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Footway Works, Kerbing Works
Traffic Management:
Portable Traffic Lights (TTLS).
A7-NB-Langholm- Temporary Traffic Lights
Location:A7 (B6318 Skipper/S Br to Rhs Jct Langholm) to A7 (B709 Jct to Jct Holmhead), Northbound
Start time:20th of January 2025, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A7-SB-Langholm- Temporary Traffic Lights
Location:A7 (B709 Jct to Jct Holmhead) to A7 (B6318 Skipper/S Br to Rhs Jct Langholm), Southbound
Start time:20th of January 2025, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A701 NB Blackacre - TTL's
Location:A701 (Jct Garrel to Jct Hartfield), Northbound
Start time:13th of January 2025, 9:30am
Description:Works:
Structural Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A701 NB South of Beattock - Stop/Go Boards
Location:A701 (B7076 Junction to Beattock West Rbt), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Stop/Go Boards Traffic Control.
A701 SB South of Beattock - Stop/Go Boards
Location:A701 (B7076 Junction to Beattock West Rbt), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Stop/Go Boards Traffic Control.
A701 Tinwald Downs NB TTL's
Location:A701 (A75 Edinburgh Rd Rbt to Tinwald Downs Rd Rbt) to A701 (Tinwald Downs Rbt to Jct (L) C4 Quarry
Start time:13th of January 2025, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A701 Tinwald Downs Rd (Council Network) - TTL's
Location:A701 (Tinwald Downs Rbt to Tinwald Downs Rbt), Westbound
Start time:13th of January 2025, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A701 Tinwald Downs SB TTL's
Location:A701 (Tinwald Downs Rbt to Jct (L) C4 Quarry Road) to A701 (A75 Edinburgh Rd Rbt to Tinwald Downs Rd
Start time:13th of January 2025, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - NB -Nine Mile Burn - Closure
Location:A702 (End Of Verge to A766 Penicuik) to A702 (A766 Penicuik to C57 Silverburn Rd), Northbound
Start time:8th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Diversion for Traffic Heading Northbound: A702 Northbound, A721 Roman Road Eastbound, A72 Northbound, A701 Northbound, A701 Peebles Road Northbound, A701 Bridge Street Northbound, A701 John Street Northbound, A701 Edinburgh Road Northbound, Gowkley Moss Roundabout, A701 Northbound, A703 Seafield Moor Road Northbound, A702 Northbound.
A702 - NB - Biggar - Temp lights
Location:A702 (A72 South Junction to A72 Jct North Biggar), Northbound
Start time:21st of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - NB - Biggar - Temp lights
Location:A702 (A72 South Junction to A72 Jct North Biggar), Northbound
Start time:17th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - NB - Silverburn - Closure
Location:A702 (A766 Penicuik to C57 Silverburn Rd) to A702 (C57 Silverburn Rd to Jct Grange Dell), Northbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Diversion for Traffic Heading Northbound: A702 Northbound, A766 Junction, A766 Carlops Road Northbound, A701 Northbound, Gowkley Moss Roundabout, Bush Loan Road Westbound, A702 Northbound.
A702 - NB - WEST LINTON - TEMP LIGHTS
Location:A702 (Golf Course Road to Robins Land Roundabout), Northbound
Start time:6th of January 2025, 6:00am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - NB - Wandel - Temp lights
Location:A702 (Maidencots Rbt to Br Over Wandel Burn), Northbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - SB -Nine Mile Burn - Closure
Location:A702 (A766 Penicuik to C57 Silverburn Rd) to A702 (End Of Verge to A766 Penicuik), Southbound
Start time:8th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Diversion for Traffic Heading Southbound: A702 Southbound, A703 Seafield Moor Road Southbound, A701 Southbound, Gowkley Moss Roundabout, A701 Edinburgh Road Southbound, A701 John Street Southbound, A701 Bridge Street Northbound, A701 Peebles Road Southbound, A701 Southbound, A72 Southbound, A721 Roman Road Westbound, A702 Southbound.
A702 - SB - Biggar - Temp lights
Location:A702 (A72 South Junction to A72 Jct North Biggar), Southbound
Start time:21st of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - SB - Biggar - Temp lights
Location:A702 (A72 South Junction to A72 Jct North Biggar), Southbound
Start time:17th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - SB - Silverburn - Closure
Location:A702 (C57 Silverburn Rd to Jct Grange Dell) to A702 (A766 Penicuik to C57 Silverburn Rd), Southbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Turn left onto Bush Loan Road. After 1.2 miles, take the 3rd exit onto A701 for 6.1 miles. Turn Right at Leadburn to continue on A701. After 9.3 miles turn right onto A72 at Blyth Bridge then after 0.7 miles turn right onto A721. Rejoin A702 at Melbourne Crossroads
A702 - SB - WEST LINTON - TEMP LIGHTS
Location:A702 (Golf Course Road to Robins Land Roundabout), Southbound
Start time:6th of January 2025, 9:00am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 - SB - Wandel - Temp lights
Location:A702 (Maidencots Rbt to Br Over Wandel Burn), Southbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 NB Abington. Portable Traffic Lights.
Location:A702 (North End Of Dual C/Way to Maidencots Rbt), Northbound
Start time:21st of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 NB Biggar. Road Closure
Location:A702 (A72 South Junction to A72 Jct North Biggar), Northbound
Start time:31st of December 2024, 8:00pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
Diversion Information:
Divert onto A73 to A70 then A721 and return to A702.
A702 NB Carlops. Portable Traffic Lights.
Location:A702 (Jct. South Mains to Regional Boundary), Northbound
Start time:6th of January 2025, 9:00am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A702 SB Abington. Portable Traffic Lights.
Location:A702 (North End Of Dual C/Way to Maidencots Rbt), Southbound
Start time:21st of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A702 SB Biggar. Road Closure
Location:A702 (A72 South Junction to A72 Jct North Biggar), Southbound
Start time:31st of December 2024, 8:00pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
Diversion Information:
Diverted via A721 then A70 to A73 the return onto A702.
A702 SB Carlops. Portable Traffic Lights.
Location:A702 (Jct. South Mains to Regional Boundary), Southbound
Start time:6th of January 2025, 9:00am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A720 - EB - Baberton - Lane closure
Location:A720 (S Of Calder Jct to Baberton Jct) to A720 (Bonaly Rd Br. to W Dreghorn), Eastbound
Start time:23rd of December 2024, 8:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A720 - EB - Baberton EB On Slip to A720 - Closure
Location:A720 (Sseb Rbt Hunterston to Baberton Entry Slip), Eastbound
Start time:23rd of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - Baberton EB Onslip to A720 - Closure
Location:A720 (Sseb Rbt Hunterston to Baberton Entry Slip), Eastbound
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - Baberton to Bonaly - Closure
Location:A720 (N Of M8 Ext Jct to S Of M8 Ext Jct) to A720 (Eastbound Slip to E Of Dreghorn Jct), Eastbound
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - Calder EB On Slip to A720 - Closure
Location:A720 (A71 Rbt to Eb Slip From A71), Eastbound
Start time:23rd of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - Calder EB Onslip to A720 - Closure
Location:A720 (A71 Rbt to Eb Slip From A71), Eastbound
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - East of Calder to Baberton - Closure
Location:A720 (N Of M8 Ext Jct to S Of M8 Ext Jct) to A720 (Eastbound Slip to E Of Dreghorn Jct), Eastbound
Start time:23rd of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - Hermiston EB On Slip to A720 - Closure
Location:A720 (M8 Hermiston Gait Rbt to Slip To A720), Eastbound
Start time:23rd of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 - EB - Hermiston EB Onslip to A720 - Closure
Location:A720 (M8 Hermiston Gait Rbt to Slip To A720) to A720 (N Of M8 Ext Jct to S Of M8 Ext Jct), Eastbound
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)
A720 WB - Lane Closure - Baberton to Calder
Location:A720 (Baberton Jct to S Of Calder Jct), Westbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A721 Southbound to M74 Southbound - Total closure
Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou
Start time:22nd of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.
A721 Southbound to M74 Southbound on-slip - Total closure
Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou
Start time:10th of January 2025, 8:00pm
Description:Works:
Lighting Works
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.
A725 Kingsway Whitemoss Rbt and Whirlies Rbt - Lane Closure
Location:A725 (Whitemoss Rbt to Whirlies Rbt), Northbound
Start time:7th of January 2025, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A725 Northbound Raith underpass - Progressive nearside / Offside lane closures
Location:A725 (Raith Rbt to Whistleberry Toll Rbt) to A725 (Raith Rbt to Off Slip Orbiston Int), Northbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A725 Southbound Bellziehill main line - Nearside lane closure
Location:A725 (Diamond Int. Ob to Benziehill Int On-Slip) to A725 (Bellziehill On Slip to Off Slip Orbiston I
Start time:8th of January 2025, 8:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A725 Southbound Bellziehill on-slip - Total closure
Location:A725 (Bellziehill Rbt to On Slip Ftom Bellziehill) to A725 (Diamond Int. Ob to Benziehill Int On-Sli
Start time:8th of January 2025, 8:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Bellziehill Roundabout, a725 Northbound on-slip, A725 Northbound Diamond off-slip, A725 Southbound Diamond on-slip.
A725 Southbound Raith Underpass - Progessive nearside / offside lane closures
Location:A725 (Raith Rbt to Off Slip Orbiston Int) to A725 (Raith Rbt to Whistleberry Toll Rbt), Southbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A725 Southbound Raith off-slip - Total closure
Location:A725 (On Slip Orbiston Int to Raith Rbt) to A725 (Raith Rbt to Raith Rbt), Southbound
Start time:23rd of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
A725 Southbound, A725 Southbound Main Street off-slip, A725 Northbound Main Street on-slip.
A725 WB E Kilbride Expy off slip to Hillhouse Rd - Lane closure
Location:A725 (Wb Off Slip to Eb On Slip) to A725 (Wb Off Slip to Newhouse Rbt), Westbound
Start time:13th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
Diversion Information:
Douglas Street - Main Street (B7012) - East Avenue - Hillhouse Road
A737 EB Johnstone off slip Total Closure
Location:A737 (Off Slip To B789 to B789 Rbt), Eastbound
Start time:8th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Road Closure.
Diversion Information:
Follow A737 Exit Linwood - Turn - Join A737 WB - Exit Johnstone off
A737 EB Kilbarchan Lane Closure
Location:A737 (Start Dual Carriageway to On Slip From B787) to A737 (On Slip From B787 to Off Slip To B789),
Start time:8th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Lane Closure.
A737 EB Kilbarchan on slip Total Closure
Location:A737 (B787 Rbt to On Slip From B787) to A737 (Start Dual Carriageway to On Slip From B787), Eastboun
Start time:8th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Road Closure.
Diversion Information:
B787 Kilbarchan Rd - Graham St - Join A737 Johnstone on Slip
A737 Highfield Rbt to Hillend Rbt Dalry SB - Total Closure
Location:A737 (Highfield Jct to B707 Jct) to A737 (Speed Derestriction to Monkcastle), Southbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Road Closure.
Diversion Information:
Diversion For Vehicles not HGV B707 Beith Road - Townend St - Kilwinning Road - End HGV will be escorted through works
A737 Hillend Rbt to Highfield Rbt Dalry NB - Total Closure
Location:A737 (Speed Derestriction to Monkcastle) to A737 (Highfield Jct to B707 Jct), Northbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Road Closure.
Diversion Information:
Diversion For Vehicles not HGV B707 Beith Road - Townend St - Kilwinning Road - End HGV will be escorted through works
A737 Linclive IC WB - Total Closure
Location:A737 (Wb Off Slip to Wb On Slip), Westbound
Start time:7th of January 2025, 10:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
follow diversion -
A737 WB off to Linclive - 2nd exit A737 EB on from Linclive - End
A737 NB Clerksbridge Rbt - TTLS
Location:A737 (Clerksbridge Toll Rbt to North Ayrshire Bdy) to A737 (Roadhead Rbt to Clerksbride Toll Rbt), N
Start time:16th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A737 NB Johnstone On Slip total Closure
Location:A737 (B789 Rbt to On Slip From B789) to A737 (Off Slip To B789 to On Slip From B789), Northbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Road Closure.
Diversion Information:
A737 SB to Kilbarchan - Exit Join A737 NB - End
A737 SB Clerksbridge Rbt - TTLS
Location:A737 (Roadhead Rbt to Clerksbride Toll Rbt) to A737 (Clerksbridge Toll Rbt to North Ayrshire Bdy), S
Start time:16th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A737 SB Johnstone Off Slip total Closure
Location:A737 (Off Slip To B789 to B789 Rbt), Southbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Filter Drain
Traffic Management:
Road Closure.
Diversion Information:
A737 SB to Kilbarchan - Exit Join A737 NB - Exit Johnstone off - End
A737 offslip to Johnstone NB - Total Closure
Location:A737 (Off Slip To B789 to B789 Rbt), Northbound
Start time:13th of January 2025, 10:00pm
Description:Works:
Carriageway Patching, Gully/ironwork repairs
Traffic Management:
Lane Closure.
Diversion Information:
follow diversion -
Continue A737 EB - Linwood EB offslip - 1st exit onto A761 - A761 - 1st exit onto Bridge of Weir Rd - Deafhillock Rbt - End
A737 prior Linclive IC Linwood WB - Lane Closure
Location:A737 (Wb On Slip to Linclive Jct) to A737 (Wb Off Slip to Wb On Slip), Westbound
Start time:7th of January 2025, 10:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A738 EB Stevenston Rd/Byres Road -TTL
Location:A738 (Start Single 3- Lane Cway to A78 Pennyburn Rbt) to A738 (A737 Kilwinning to Pennyburn Rd Jct),
Start time:6th of January 2025, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A738 WB Stevenston Rd/Byres Road - TTL
Location:A738 (A737 Kilwinning to Pennyburn Rd Jct) to A738 (Start Single 3- Lane Cway to A78 Pennyburn Rbt),
Start time:6th of January 2025, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A738 EB Kilwinning Rd to Pennyburn RBT - lane closures
Location:A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated Left Turn Lane) to A78 (Pennyburn Roundab
Start time:20th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
A738 Kilwinning Rd EB - Lane Closure
Location:A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated Left Turn Lane) to A78 (Pennyburn Roundab
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A738 Kilwinning Rd WB - Lane Closure
Location:A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated Left Turn Lane) to A78 (Pennyburn Roundab
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A738 Stevenston Rd NB - Lane Closure
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A738 (Jct Whitehouse Park Rd to Start Single 3
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A738 Stevenston Rd SB- Lane Closure
Location:A738 (Jct Whitehouse Park Rd to Start Single 3- Lane Cway) to A738 (Start Single 3- Lane Cway to A78
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A738 WB Stevenson to Pennyburn RBT - Lane Closure
Location:A738 (Start Single 3- Lane Cway to A78 Pennyburn Rbt) to A78 (Pennyburn Roundabout to Pennyburn Roun
Start time:20th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
A75 - A75/ A701 Rbt Dumfries Bypass EB - Road Narrowing
Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Eastbound
Start time:26th of January 2025, 6:00am
Description:Works:
Structural Repairs
Traffic Management:
Road Narrowing (Two Way Working).
A75 - A75/ A701 Rbt Dumfries Bypass WB - Road Narrowing
Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Westbound
Start time:26th of January 2025, 6:00am
Description:Works:
Structural Repairs
Traffic Management:
Road Narrowing (Two Way Working).
A75 from B735 Halfway House Kirkcolm EB- TTL
Location:A75 (Jct Dirnow to B733 Jct), Eastbound
Start time:6th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 from B735 Halfway House Kirkcolm WB- TTL
Location:A75 (Jct Dirnow to B733 Jct), Westbound
Start time:6th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 @ Water of Luce EB - Convoy Working
Location:A75 (Stairhaven Junc to Old A75 Junc), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Convoy Working (10mph)
A75 @ Water of Luce WB - Convoy Working
Location:A75 (Stairhaven Junc to Old A75 Junc), Westbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Convoy Working (10mph)
A75 @ Woodside from Collin Bypass EB - TTLS
Location:A75 (Mousewald Ldge Jct to Torthorwald Jct), Eastbound
Start time:31st of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 @ Woodside from Collin Bypass WB - TTLS
Location:A75 (Mousewald Ldge Jct to Torthorwald Jct), Westbound
Start time:31st of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 A751 Jct Castle Kennedy EB - TTL
Location:A75 (A751 Jct to 40 Mph Xroads) to A75 (Jct Inch Church to A751 Jct), Eastbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 A751 Jct Castle Kennedy WB - TTL
Location:A75 (Jct Inch Church to A751 Jct) to A75 (A751 Jct to 40 Mph Xroads), Westbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Annan EB - TTLS
Location:A75 (Nivenhill O'Bridge to Irvington Fm) to A75 (End Dual C'Way to Nivenhill O'Bridge), Eastbound
Start time:6th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Annan WB - TTLS
Location:A75 (End Dual C'Way to Nivenhill O'Bridge) to A75 (Nivenhill O'Bridge to Irvington Fm), Westbound
Start time:6th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Auchenlarie EB - TTLS
Location:A75 (Auchenlarie Fm to Kirkdale Hse Jct), Eastbound
Start time:7th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Auchenlarie WB - TTLS
Location:A75 (Auchenlarie Fm to Kirkdale Hse Jct), Westbound
Start time:7th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Blackcraig Palnure EB Convoy
Location:A75 (Jct Blackcraig to A712 Jct) to A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A75 Blackcraig Palnure EB TTL's
Location:A75 (Jct Blackcraig to A712 Jct) to A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound
Start time:15th of January 2025, 6:00am
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Blackcraig Palnure WB Convoy
Location:A75 (Jct Muirfad Fm to Jct Blackcraig) to A75 (Jct Blackcraig to A712 Jct), Westbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A75 Blackcraig Palnure WB TTL's
Location:A75 (Jct Muirfad Fm to Jct Blackcraig) to A75 (Jct Blackcraig to A712 Jct), Westbound
Start time:15th of January 2025, 6:00am
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Carsluith Creetown EB TTL
Location:A75 (Carsluith Jct Sth to Carsluith Jct Nth), Eastbound
Start time:10th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Carsluith Creetown WB TTL
Location:A75 (Carsluith Jct Sth to Carsluith Jct Nth), Westbound
Start time:10th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Dancingknowe Rbt Collin EB TTL
Location:A75 (Jct Nether Yett to Dancingknowe Rbt), Eastbound
Start time:27th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Dancingknowe Rbt Collin WB TTL
Location:A75 (Jct Nether Yett to Dancingknowe Rbt), Westbound
Start time:27th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 EB Garroch Rdbt to New Cargen Bridge Rdbt - Total Closure
Location:A75 (Start Garroch Loaning Rbt to End Garroch Loaning Rbt) to A75 (New Cargenbridge Rbt to New Carge
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
National Cycle Rte 7 to A711, onto A780 WB and follow to New Cargen Bridge Rdbt -End Diversion-
A75 EB Auchenreoch Loch, Crocketford - TTL
Location:A75 (Jct Brandedleys to Jct Lairdlaugh), Eastbound
Start time:3rd of January 2025, 9:30am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A75 EB Dumfires Bypass - TTL's
Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Eastbound
Start time:9th of January 2025, 6:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Haugh of Urr EB - TTLs
Location:A75 (Jct Garmartin to B794 Jct), Eastbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Haugh of Urr WB - TTLs
Location:A75 (Jct Garmartin to B794 Jct), Westbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Near Kirtleside Eastriggs EB - TTLS
Location:A75 (End Dual C'Way to Nivenhill O'Bridge), Eastbound
Start time:24th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Near Kirtleside Eastriggs WB - TTLS
Location:A75 (End Dual C'Way to Nivenhill O'Bridge), Westbound
Start time:24th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Palnure Dumfries and Galloway EB- TTL
Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound
Start time:6th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Palnure Dumfries and Galloway WB- TTL
Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Westbound
Start time:6th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Sandgreen Gatehouse of Fleet EB- TTL
Location:A75 (Sandgreen Road to Climbing Lane End), Eastbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Sandgreen Gatehouse of Fleet WB- TTL
Location:A75 (Sandgreen Road to Climbing Lane End), Westbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Shennanton to Glen Luce EB TTL's
Location:A75 (Old Gravel Pit to Jct Dervaird) to A75 (Jct Blackhill Croft to B735 Jct), Eastbound
Start time:13th of January 2025, 6:00am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A75 Shennanton to Glen Luce WB TTL's
Location:A75 (Jct Blackhill Croft to B735 Jct) to A75 (Old Gravel Pit to Jct Dervaird), Westbound
Start time:13th of January 2025, 6:00am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A75 WB Auchenreoch Loch, Crocketford - TTL
Location:A75 (Jct Brandedleys to Jct Lairdlaugh), Westbound
Start time:3rd of January 2025, 9:30am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A75 WB Dumfires Bypass - TTL's
Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Westbound
Start time:9th of January 2025, 6:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A75 WB New Cargen Bridge Rbt to Garroch Rbt - Total Closure
Location:A75 (Cargenbridge Rbt to Garroch Loaning Rbt), Southbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
Diversion is off at Cuckoo Bridge Rdbt to Glasgow Rd to Glasgow St to A780 onto A711 then follow National Cycle Rte 7 back to Garroch Rdbt -End Diversion-
A75 Woodside @ Dumfries EB - Lane Closure
Location:A75 (West Bullnose to B724 Jct) to A75 (B724 Jct to East Bullnose), Eastbound
Start time:7th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A75 from A75/A701 Rbt EB Dumfries Bypass - Total closure
Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Eastbound
Start time:26th of January 2025, 6:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Cuckoo Bridge Rbt - South on A76 Glasgow Rd - A76 Glasgow St - A780 Buccleuch - A780 Church Cres - A780 Academy St - A701 Edinburgh Rd - A75 Bloomfield Rbt - Diversion End
A75 from A75/A701 Rbt WB Dumfries Bypass - Total closure
Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Southbound
Start time:26th of January 2025, 6:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Cuckco Bridge Rbt - South on A76 Glasgow Rd - A76 Glasgow St - A780 Buccleuch - A780 Church Cres - A780 Academy St - A701 Edinburgh Rd - A75 Bloomfield Rbt - Diversion End (IN REVERSE)
A76 NB Caslte New Cumnock - TTLS
Location:A76 (B741 Mossmark Jct to Polqueys Rd Jct), Northbound
Start time:6th of January 2025, 7:00am
Description:Works:
Third Party Works, Skip/Scaffold
Traffic Management:
Portable Traffic Lights (TTLS).
A76 NB Dettingen Rdbt to Templeton Rdbt - Total Closure
Location:A76 (Dettingen Rbt to Templeton Rbt), Southbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
A76 NB High Street, Sanquhar - TTLS
Location:A76 (Jct Esso Ps to Jct To Manse), Northbound
Start time:13th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 NB Main Street Jct Hyslop Street Kirkconnel - TTLs
Location:A76 (Jct To Kelloholm to Jct Kirkconnell Station), Northbound
Start time:18th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 NB at Mennock - TTL's
Location:A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange), Northbound
Start time:6th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 SB Caslte New Cumnock - TTLS
Location:A76 (B741 Mossmark Jct to Polqueys Rd Jct), Southbound
Start time:6th of January 2025, 7:00am
Description:Works:
Third Party Works, Skip/Scaffold
Traffic Management:
Portable Traffic Lights (TTLS).
A76 SB High Street, Sanquhar - TTLS
Location:A76 (Jct Esso Ps to Jct To Manse), Southbound
Start time:13th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 SB Main Street Jct Hyslop Street Kirkconnel - TTLs
Location:A76 (Jct To Kelloholm to Jct Kirkconnell Station), Southbound
Start time:18th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 SB Templeton Rbt to Dettingen Rbt - Total Closure
Location:A76 (Templeton Rbt to Templeton Rbt) to A76 (Dettingen Rbt to Dettingen Rbt), Southbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
B7083 to A70 New Bridge St to A70 Ayr Rd onto Dettingen Rdbt -End Diversion-
A76 SB at Mennock - TTL's
Location:A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange), Southbound
Start time:6th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A76 South of Mennock NB - TTLS
Location:A76 (S End Of Glenairlie 3-Lane to Priority Changeover S End), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A76 South of Mennock SB - TTLS
Location:A76 (S End Of Glenairlie 3-Lane to Priority Changeover S End), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Bankfield to Whitletts NB Road Closure
Location:A77 (Bankfield Rbt to Climbing Lane End) to A77 (Start 3 Lane to End Single Cway), Northbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Northbound traffic will leave the A77 onto A713 Dalmellington road continuing along Castlehill Rd and joining the A70 Station rd. Traffic will comtinue on station rd before turning left onto A79 John St. At the roundabout traffic will take the 3rd exit onto A719 Whittletts rd and contiue to Whitletts Rbt where it will rejoin the A77.
Southbound traffic in reverse
A77 Cairnryan Road to A751 Innermessan Jct NB- Total Closure
Location:A77 (Mcmasters Rd to A751 Dunfries Jct) to A751 (A75 Jct to A77 Jct), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Road Closure.
Diversion Information:
Right turn onto A751 from the A75, Right turn onto A77.
A77 Cairnryan Road to A751 Innermessan Jct SB - Total Closure
Location:A751 (A75 Jct to A77 Jct) to A77 (Mcmasters Rd to A751 Dunfries Jct), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Road Closure.
Diversion Information:
Left turn onto A751 from the A77, Left turn onto A75.
A77 Carlock Ballantrae SB - TTL
Location:A77 (Jct At Carlock House to Jct At Ballochdowan) to A77 (North Mark Br to Jct Carlock Hse), Southbo
Start time:21st of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Carlock Ballantrae NB TTL
Location:A77 (North Mark Br to Jct Carlock Hse) to A77 (Jct At Carlock House to Jct At Ballochdowan), Northbo
Start time:21st of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Dalrymple St Girvan - Total Closure
Location:A77 (Stumpy Corner to Wesley Road) to A77 (Start Kirkpatrick St Rbt to End Kirkpatrick St Rbt), Sout
Start time:6th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
Continue onto A77 Henrietta St.
A77 Glendoune St Girvan - Total Closure
Location:A77 (Stumpy Corner to Wesley Road) to A77 (Duff Street to Kirkpatrick Street Rbt), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
Continue onto A77 Henrietta St.
A77 Holmston Rbt Ayr NB - TTL
Location:A77 (Climbing Lane End to Start Of 4 Lane Single), Northbound
Start time:26th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Holmston Rbt Ayr - TTL
Location:A77 (Climbing Lane End to Start Of 4 Lane Single), Southbound
Start time:26th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Holmston Rbt SB Ayr - Lane 1 Closure
Location:A77 (Start Of 4 Lane to Holmston Roundabout) to A77 (Climbing Lane End to Start Of 4 Lane Single), S
Start time:26th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Mobile Lane Closures.
A77 Holmston Rbt to Maybole Rd - SB Road Closure
Location:A77 (Start Of 4 Lane to Holmston Roundabout) to A77 (A79 Jct Maybole Rd to Bankhead Rbt), Southbound
Start time:17th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
traffic will leave the A77 at Holmston rbt and continue on Holmston Rd joinining the A70 Station rd, station rd bridge and Parkhouse St. traffic will then turn onto the A79 and continue along Beresford Terr, Carrick Rd, St Leonards Rd & Maybole rd rejoining the A77 at the A77/Maybole rd junction.
A77 Holmston Roundabout NB - TTLS
Location:A77 (Start Of 4 Lane to Holmston Roundabout) to A77 (Holmston Rbt to Start 3 Lane), Northbound
Start time:10th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Holmston Roundabout SB - TTLS
Location:A77 (Holmston Rbt to Start 3 Lane) to A77 (Start Of 4 Lane to Holmston Roundabout), Southbound
Start time:10th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Kirkoswald Road Turnberry NB TTL
Location:A77 (Dipple,Factory Ent to A719 Jct) to A77 (A719 Junction to South End Turnberry Climbing Lane), No
Start time:3rd of January 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Kirkoswald Road Turnberry SB - TTLS
Location:A77 (A719 Junction to South End Turnberry Climbing Lane) to A77 (Dipple,Factory Ent to A719 Jct), So
Start time:3rd of January 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Main Street Ballantrae NB - TTLS
Location:A77 (B7044 Jct to Start Climbing Lane), Northbound
Start time:30th of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Main Street Ballantrae SB - TTLS
Location:A77 (B7044 Jct to Start Climbing Lane), Southbound
Start time:30th of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Maybole Rd to Holmston Rbt - NB Road closure
Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt) to A77 (Start Of 4 Lane to Holmston Roundabout), Northbound
Start time:17th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Traffic will leave the A77 at the Maybole Rd junction and continue on A79 Maybole Rd, St Leonards Rd and turn right onto A79 Carrick Rd continuing on the A79 Beresford Terrace and turning right onto A70 Station Rd. Traffic will continue on the A70 Station Rd & Station bridge rd. At the first roundabout traffic will take the first exit onto A70 Holmston Rd and at the next rbt take the second exit onto A70 Holmston Rd. Traffic will continue on Holmston Rd rejoining the A77 at Holmston Rbt
A77 NB Bankfield Roundabout - TTL's
Location:A77 (Bankfield Rbt to Bankfield Rbt), Northbound
Start time:17th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Portable Traffic Lights (TTLS).
A77 NB from A751 Innermessan at Loch Ryan Port. Carinryan -TTls
Location:A77 (Jct Bonny Braes to S Ayrshire Bdy), Northbound
Start time:15th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 NB Kirkoswald Rd Turnberry - TTLS
Location:A77 (Dipple,Factory Ent to A719 Jct), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 NB Kirkoswald Rd at Turnberry - TTLs
Location:A77 (A719 Junction to South End Turnberry Climbing Lane), Northbound
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 NB Prior to Glenapp Church - TTL
Location:A77 (North Mark Br to Jct Carlock Hse), Northbound
Start time:15th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 NB Sandyford Toll Rbt to Dutch House Rbt - Offside Lane Closure
Location:A77 (Sandyford Toll Roundabout to Sandyford Toll Roundabout) to A77 (Sandyford Toll Roundabout to Du
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure.
A77 NB Sandyford Toll Rbt to Dutch House Rbt- Total Closure
Location:A77 (Sandyford Toll Roundabout to Sandyford Toll Roundabout) to A77 (Dutch Hse Rbt to Dutch Hse Rbt)
Start time:13th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A719 to A76 Cross Roads Rdbt to Bellfield I/C then onto A77 SB to Dutch House Rdbt - End Diversion-
A77 NB Smithston Roundabout, Minishant - Lane Closure
Location:A77 (Smithston Br to Jct Kewnston), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A77 NB approach to Holmston Rbt - Lane Closure
Location:A77 (Climbing Lane End to Start Of 4 Lane Single) to A77 (Start Of 4 Lane to Holmston Roundabout), N
Start time:10th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
10/01/2025 - Lane Closure, 11/01/2025 - Lane Closure, 12/01/2025 - Lane Closure, 13/01/2025 - Lane Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Portable Traffic Lights (TTLS)
A77 NB at Innermessan - TTLS
Location:A77 (Mcmasters Rd to A751 Dunfries Jct) to A77 (A751 Dumfries Jct to Jct Beoch), Northbound
Start time:13th of January 2025, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Dutch House Rbt to Sandyford Toll Rbt - Offside Lane Closure
Location:A77 (Dutch House R/Bout to Sandyford Toll Roundabout) to A77 (Sandyford Toll Roundabout to Sandyford
Start time:13th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure.
A77 SB from A751 Innermessan at Loch Ryan Port. Carinryan - TTls
Location:A77 (Jct Bonny Braes to S Ayrshire Bdy), Southbound
Start time:15th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Dutch House Rbt to Sandyford Toll Rbt - Total Closure
Location:A77 (Dutch Hse Rbt to Dutch Hse Rbt) to A77 (Sandyford Toll Roundabout to Sandyford Toll Roundabout)
Start time:20th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
Diversion Information:
A77 to Bellfield Interchange then onto A76 EB to Crossroads Rdbt onto A719 WB to Sandyford Toll Rdbt -End Diversion-
A77 SB Kirkoswald Rd Turnberry - TTLS
Location:A77 (Dipple,Factory Ent to A719 Jct), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Kirkoswald Rd at Turnberry - TTLs
Location:A77 (A719 Junction to South End Turnberry Climbing Lane), Southbound
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Prior to Glenapp Church - TTL
Location:A77 (North Mark Br to Jct Carlock Hse), Southbound
Start time:15th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A77 SB Smithston Roundabout,Minishant- Lane Closure
Location:A77 (Smithston Br to Jct Kewnston), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A77 SB approach to Holmston Rbt - lane closure
Location:A77 (Holmston Rbt to Start 3 Lane) to A77 (Holmston Rbt to Holmston Rbt), Southbound
Start time:10th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
10/01/2025 - Lane Closure, 11/01/2025 - Lane Closure, 12/01/2025 - Lane Closure, 13/01/2025 - Lane Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Portable Traffic Lights (TTLS)
A77 SB at Innermessan - TTLS
Location:A77 (A751 Dumfries Jct to Jct Beoch) to A77 (Mcmasters Rd to A751 Dunfries Jct), Southbound
Start time:13th of January 2025, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A77 To A751 Innermess Cairnryan SB - TTL
Location:A77 (Drummuckloch Fm to Derest Sign) to A77 (Jct Beoch to Drummuckloch Fm), Southbound
Start time:7th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A77 Whitletts to Meiklewood NB Lane Closure
Location:A77 (Whitletts Roundabout to Sandyford Toll Roundabout) to A77 (M77 Dbfo Boundary to Slip Road Exit
Start time:8th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A77 Whitletts to Meiklewood SB Lane Closure
Location:A77 (M77 Dbfo Boundary to Off Slip To A76/A71) to A77 (Start Of 4 Lane to Whitletts Rbt), Southbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A77 Whittlets Rbt to Bankfield Rbt SB Road Closure
Location:A77 (Start 3 Lane to End Single Cway) to A77 (Bankfield Rbt to Bankfield Rbt), Southbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Northbound traffic will leave the A77 onto A713 Dalmellington road continuing along Castlehill Rd and joining the A70 Station rd. Traffic will comtinue on station rd before turning left onto A79 John St. At the roundabout traffic will take the 3rd exit onto A719 Whittletts rd and contiue to Whitletts Rbt where it will rejoin the A77.
Southbound traffic in reverse
A77 from A751 Innermessan Cairnryan NB- TTL
Location:A77 (Jct Beoch to Drummuckloch Fm) to A77 (Drummuckloch Fm to Derest Sign), Northbound
Start time:7th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Irvine Road/Snowdon Terrace South of Farlie TTL
Location:A78 (Sseb Rbt Hunterston to Sseb Rbt Hunterston) to A78 (Lodge At Sou'An Rd End to Bsc Rbt Huntersto
Start time:16th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Irvine Rd @ Hunterson Rbt SB - Lane Closure
Location:A78 (Bsc Rbt Hunterston to Sseb Rbt Hunterston) to A78 (Sseb Rbt Hunterston to Jct B782), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A78 Irvine Rd NB - TTLS
Location:A78 (Jct B782 to Jct B7048), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Irvine Rd NB - TTLS
Location:A78 (Sseb Rbt Hunterston to Jct B782), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Irvine Rd NB - TTLS
Location:A78 (Jct B782 to Jct B7048) to A78 (Sseb Rbt Hunterston to Jct B782), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Irvine Rd SB - TTLS
Location:A78 (Jct B782 to Jct B7048), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Irvine Rd SB - TTLS
Location:A78 (Sseb Rbt Hunterston to Jct B782) to A78 (Jct B782 to Jct B7048), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Irvine Rd SB - TTLS
Location:A78 (Jct B782 to Jct B7048), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Montfode to Monktonhead NB - Lane Closure
Location:A78 (Monkton Rbt to Off Slip B746) to A78 (Montfode Roundabout to Montfode Roundabout), Northbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A78 Montfode to Monktonhead NB - Lane closure
Location:A78 (Monkton Rbt to Off Slip B746) to A78 (Montfode Roundabout to Montfode Roundabout), Northbound
Start time:30th of December 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A78 Montfode to Monktonhead NB - Mobile Lane Closures
Location:A78 (Monkton Rbt to Off Slip B746) to A78 (Montfode Roundabout to Montfode Roundabout), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Mobile Lane Closures.
A78 Montfode to Monktonhead SB - Lane Closure
Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (Entry Slip B746 to Monkton Rbt), Southbound
Start time:30th of December 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A78 Montfode to Monktonhead SB - Lane Closure
Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (Entry Slip B746 to Monkton Rbt), Southbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Inspections
Traffic Management:
Lane Closure.
A78 Montfode to Monktonhead SB - Mobile Lane Closures
Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (Entry Slip B746 to Monkton Rbt), Southbound
Start time:20th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Mobile Lane Closures.
A78 NB Wemyss Bay TTL
Location:A78 (40mph Wemyss Bay to Kelly Bridge), Northbound
Start time:27th of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Greenock Rd, Largs - Stop and Go
Location:A78 (Acc To Service Rd to Nelson St), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Gully Emptying
Traffic Management:
Stop/Go Boards Traffic Control.
A78 NB Greenock Rd, Wemyss Bay - Priority System Traffic Control
Location:A78 (40mph Wemyss Bay to Kelly Bridge), Northbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works
Traffic Management:
Priority System Traffic Control.
A78 NB Meigle Rd South of Skelmorlie - TTLS
Location:A78 (Eglinton Terr to Glenhaven House), Northbound
Start time:25th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Pennyburn RBT - Lane Closures
Location:A78 (40 Mph Speed Limit to Pennyburn Roundabout), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
A78 NB Shore Rd Skelmorlie at Eglinton Terrace - TTLS
Location:A78 (Eglinton Terr to Glenhaven House) to A78 (Kelly Bridge to Eglinton Terr), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 NB Shore Rd, Skelmorlie - Stop and Go
Location:A78 (Kelly Bridge to Eglinton Terr), Northbound
Start time:27th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A78 NB at Pennyburn RBT - TTLS
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Speed Derestriction Sign to Sharphill Rou
Start time:20th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Pennyburn Rbt SB - Lane Closure
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout), Southbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A78 Pennyburn Rbt to Irvine Rd Overbridge SB - Total Closure
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Rail Overbridge to Irvine Rd Overbridge),
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Road Closure.
Diversion Information:
Continue onto Stevenston Rd, Continue onto A737 Lauchlan Way then onto Irvine Rd.
A78 SB Irvine Road/Snowdon Terrace South of Farlie TTL
Location:A78 (Lodge At Sou'An Rd End to Bsc Rbt Hunterston) to A78 (Sseb Rbt Hunterston to Sseb Rbt Huntersto
Start time:16th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB Shore Rd Skelmorlie at Eglinton Terrace - TTLS
Location:A78 (Kelly Bridge to Eglinton Terr) to A78 (Eglinton Terr to Glenhaven House), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB Skelmorlie - Stop and Go
Location:A78 (Kelly Bridge to Eglinton Terr), Southbound
Start time:27th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A78 SB Wemyss Bay - TTLS
Location:A78 (40mph Wemyss Bay to Kelly Bridge), Southbound
Start time:27th of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A78 SB at Pennyburn RBT - TTLS
Location:A78 (Sharphill Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Pennyburn Roundabout)
Start time:20th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Sharphill Rbt to Pennyburn Rbt NB - Lane Closure
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Speed Derestriction Sign to Sharphill Rou
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A78 Sharphill Rbt to Pennyburn Rbt SB - Lane Closures
Location:A78 (Sharphill Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Pennyburn Roundabout)
Start time:20th of January 2025, 8:00pm
Description:Works:
Pavement Surveys
Traffic Management:
Lane Closure.
A78 Shore Rd Skelmorlie NB - TTLS
Location:A78 (Kelly Bridge to Eglinton Terr), Northbound
Start time:21st of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Shore Rd Skelmorlie SB - TTLS
Location:A78 (Kelly Bridge to Eglinton Terr), Southbound
Start time:21st of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Snowdon Terrace NB - TTLS
Location:A78 (Jct B7048 to Yerton Brae Jct), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Snowdon Terrace SB - TTLS
Location:A78 (Jct B7048 to Yerton Brae Jct), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Wemyss Bay NB - TTLs
Location:A78 (40mph Wemyss Bay to Kelly Bridge), Northbound
Start time:13th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 Wemyss Bay SB - TTLs
Location:A78 (Jct Inverkip to Exit Power Stat) to A78 (40mph Wemyss Bay to Kelly Bridge), Southbound
Start time:13th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A78 on Pennyburn RBT - Lane Closures
Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
A78 sB Greenock Rd, Largs- Stop and Go
Location:A78 (Acc To Service Rd to Nelson St), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Gully Emptying
Traffic Management:
Stop/Go Boards Traffic Control.
A8 B789 WB Langbank off slip -Slip Closure
Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow road to woodhall rbt- leave woodhall at 4th exit for A8 east- at rbt take 2nd exit - end
A8 Bargeddie Rbt to Showcase - Offside lane closure
Location:M73 (Off Slip From M73 to A8 Bailleston Rbt) to A8 (Baillieston On Slip to Bargeddie Underbridge), E
Start time:24th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A8 Chapelhall South Rbt to Chapelhall North Rbt
Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip) to A8 (Start Chapelhall Eb Off Slip to Sta
Start time:20th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A8 Chapellhall North to South Rbt - B799 Bo'ness Road
A8 EB Greenock Road Langbank Lane closure
Location:A8 (Inverclyde Cty Bdy to Langbank Rbt E/B Entry) to A8 (West Ferry Toll Int W/B On Slip to Langbank
Start time:3rd of January 2025, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A8 EB Greenock Rd to M8 Jct 31- Lane Closures
Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Langbank Rbt E/B Exit to West Ferry Toll Int E/B Off Slip), E
Start time:6th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 EB Greenock Road - Woodhall Rbt to West Ferry IC - Lane Closure
Location:A8 (Woodhall Rbt to Pt Glasgow Bdy) to M8 (Slip Off To A8 to Slip Entry From A8), Eastbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A8 EB Greenock Road - Newark Rbt to Woodhall Rbt - Road closure
Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Woodhall Rbt), Eastbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave Newark Rbt onto A761 - at rbt take 1st exit onto Glasgow Rd - at Woodhall Rbt follow signs
A8 Eastbound Baillieston Lights to Bargeddie Rbt - Progressive nearside & offside lane closures
Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to M73 (Off Slip From M73 to A8 Bailleston Rbt)
Start time:23rd of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
A8 Eastbound Bargeddie Roundabout to Eurocentral - Hard Shoulder Closure
Location:M73 (Off Slip From M73 to A8 Bailleston Rbt) to A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
A8 Eastbound Carnbroe off-slip -Total closure
Location:A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound
Start time:20th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 Eastbound Eurocentral North Rbt, A8 Eastbound Chapelhall North Rbt, B799 Bo'ness Road, B802 Woodhall Mill Road, Sykeside Road, Paddock Street, Park Place, Carnbroe Road, Sweethill Terrace.
A8 Eastbound Chaphall North Rbt from Bo'ness Road - Total closure
Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A8 EB Chapelhall North to Newhouse - Bo'ness road, Lancaster Avenue, M73 Newhouse Rbt.
A8 Eastbound Eurocentral North Rbt - Inner ring closure
Location:A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound
Start time:23rd of January 2025, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A8 Eastbound Eurocentral to Chapelhall approach - Total approach
Location:A8 (Eurocentral N.Rbt to Eb On Slip) to A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Euro to Chapelhall Div - Townhead Avenue, McNeil Drive.
A8 Eastbound Newhouse - Nearside lane closure
Location:M8 (A73 Newhouse Rbt to On To M8 Eb) to M8 (Newhouse Interchange to End Of Ppp), Eastbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A8 Eastbound Shawhead on-slip - Total closure
Location:A8 (Start 2 Way Slip to Start 4 Lane) to A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound
Start time:20th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 Westbound Shawhead on-slip, A8 Westbound Showcase off-slip, A8 Eastbound Shocase on-slip. A8 Eastbound
A8 Greenock Rd @ Kingston Rbt EB - Lane Closure
Location:A8 (Port Glasgow Western Rbt to Port Glasgow Northern Rbt) to A8 (Port Glasgow Northern Rbt to Port
Start time:23rd of December 2024, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A8 Greenock Rd Langbank EB - Lane Closure
Location:A8 (Inverclyde Cty Bdy to Langbank Rbt E/B Entry) to A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy
Start time:12th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A8 Greenock Rd Langbank WB - Lane Closure
Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound
Start time:12th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A8 Showcase on-slip Eastbound - Total closure
Location:A8 (2 Way Split to A752 Langmuir Rbt) to A8 (Bargeddie Underbridge to Shawhead Overbridge), Eastboun
Start time:24th of January 2025, 9:30am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
Diversion Information:
A8 Westbound Showcase on-slip, A8 Bargeddie Rbt & return Eastbound.
A8 WB Greenock Road Newark - Lane Closures
Location:A8 (Woodhall Rbt to Newark Rbt) to A8 (Newark Rbt to Port Glasgow Eastern Rbt), Westbound
Start time:8th of January 2025, 9:30am
Description:Works:
Trial hole investigation
Traffic Management:
Lane Closure.
A8 WB Langbank on slip - Slip Closure
Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow B789 main rd- at jct take 1st left onto rbt- at rbt take 1st exit onto A8 west- end
A8 WB - M8 J31 to Woodhall Rbt - Lane Closures
Location:M8 (Slip From M8 Wb to Slip Entry From A8) to A8 (Woodhall Rbt to Woodhall Rbt), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
A8 WB Greenock Road Woodhall Rbt to Newark Rbt - Road Closure
Location:A8 (Woodhall Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Newark Rbt), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave woodhall rbt onto Glasgow rd- at rbt take 2nd exit onto A761- end
A8 WB Rue End Street @ Cathcart Street Lane Closure
Location:A8 (B788 Jct to Bull Ring Rbt), Westbound
Start time:20th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A8 WB on Mainstreet to Rue End St - Lane closure
Location:A8 (Cartsdyke Rbt to Cartsburn St Rbt) to A8 (Cartsburn St Rbt to B788 Jct), Westbound
Start time:17th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A8 WB, Parklea Rd off slip - Slip Closure
Location:A8 (Woodhall Rbt to Newark Rbt), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave woodhall rbt onto parklea rd- follow road- end
A8 WB, Parklea Rd on slip - Slip Closure
Location:A8 (Woodhall Rbt to Newark Rbt), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
follow parklea rd onto woodhall rbt-leave woodhall rbt onto Glasgow rd- at rbt take 2nd exit onto A761- end
A8 Westbound Eurocentral to Bargeddie Roundabout - Hard Shoulder Closure
Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to M73 (Off Slip From M73 to A8 Bailleston Rbt), Westboun
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
A8 Westbound Eurocentral to Shawhead main line - Total closure
Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to A8 (Shawhead Overbridge to Bargeddie), Westbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
Townhead Avenue, McNeil Drive, B799, A775 Main Street, A775 Holytown Road, A775 Main Street, A721 Gartcosh Walk.
A8 Westbound Showcase on-slip - Total closure
Location:A8 (A752 Jct to 2 Way Split) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westbound
Start time:10th of January 2025, 10:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 Westbound Off-slip, Langmuir Road, Coatbridge Road.
A8 Westbound Showcase to Bargeddie main line - Total closure
Location:A8 (Shawhead Overbridge to Bargeddie) to M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound
Start time:10th of January 2025, 10:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8 Westbound Off-slip, Langmuir Road, Coatbridge Road.
A8 Woodhall Rbt EB - Lane Closure
Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Pt Glasgow Bdy), Westbound
Start time:23rd of December 2024, 10:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A8 Woodhall Rbt WB - Lane Closure
Location:A8 (Pt Glasgow Bdy to Woodhall Rbt) to A8 (Woodhall Rbt to Newark Rbt), Westbound
Start time:23rd of December 2024, 10:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
A8(M) Eastbound Swinton Roundabout to Baillieston Roundabout - Hard Shoulder Closure
Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to A8 (Baillieston Int Rbt to Baillieston Int R
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
A8(M) Westbound Baillieston Roundabout to Swinton Roundabout - Hard Shoulder Closure
Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd), Eastbound
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
A814 to M8 Kingston Bridge WB - Slip Closure
Location:M8 (A814 Exit to Entry M8 Wb), Westbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Road Closure.
Diversion Information:
A814 EB, North Street, St Vincent Street, A804, M8.
A82 Achintore Rd Fort William - Stop/Go Works
Location:A82 (Cemetery Entrance to Past Mercury M/Inn) to A82 (Past Mercury Inn to West End Rbt), Northbound
Start time:13th of January 2025, 9:30am
Description:Works:
Inspections
Traffic Management:
Stop/Go Boards Traffic Control.
A82 Altsigh NB - TTL
Location:A82 (A887 Junction to 23ml Milestone), Northbound
Start time:22nd of January 2025, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Altsigh SB - TTL
Location:A82 (A887 Junction to 23ml Milestone), Southbound
Start time:22nd of January 2025, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Ardvorlich NB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station), Northbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Ardvorlich SB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station), Southbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Arvorlich NB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Arvorlich SB - TTL
Location:A82 (Loch Sloy Power Stat to Ardlui Station), Southbound
Start time:20th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Ballchraggen to Urquhart Castle Dumnadrochit NB - TTL
Location:A82 (450m N Of Cobb Meml to Borlum Bridge) to A82 (12ml Milestone to Clansman Hotel), Northbound
Start time:6th of January 2025, 7:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Ballchraggen to Urquhart Castle Dumnadrochit SB - TTL
Location:A82 (12ml Milestone to Clansman Hotel) to A82 (450m N Of Cobb Meml to Borlum Bridge), Southbound
Start time:6th of January 2025, 7:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Blairannaich North of Tarbet NB - TTL
Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Blairannaich North of Tarbet SB - TTL
Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Southbound
Start time:20th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Bonnie Braes South of Inveruglas - Stop/Go Works
Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Northbound
Start time:24th of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Stop/Go Boards Traffic Control (30mph)
A82 Bridge of Orchy - Stop/Go Works
Location:A82 (Ms Coille B/Liath to Ms Clach A Bhein), Northbound
Start time:16th of January 2025, 9:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A82 Clachaig Inn South of Glencoe NB - Road Closure with Amnesties
Location:A82 (Start Crash Barrier to Rd To Clachaig Ho), Northbound
Start time:9th of March 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400
A82 Clachaig Inn South of Glencoe SB - Road Closure with Amnesties
Location:A82 (Start Crash Barrier to Rd To Clachaig Ho), Southbound
Start time:9th of March 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties.
Diversion Information:
NO DIVERSION
Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400
A82 Corran North of Onich NB - TTL
Location:A82 (A861 Corran Ferry Jct to Cemetery Entrance) to A82 (Cemetery Entrance to Past Mercury M/Inn), N
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Corran North of Onich SB - TTL
Location:A82 (A861 Corran Ferry Jct to Cemetery Entrance), Southbound
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Fort Augustus NB - Road Closure
Location:A82 (B862 Foyers Jct to Inchnacardoch Hotel), Northbound
Start time:20th of January 2025, 7:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
via A87 & A887
A82 Fort Augustus SB - Road Closure
Location:A82 (B862 Foyers Jct to Inchnacardoch Hotel), Northbound
Start time:20th of January 2025, 7:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
via A87 & A887
A82 Glencoe to Ballachulish NB - TTL
Location:A82 (Rd To Clachaig Ho to 09740) to A82 (S Ballachulish Rbt to Kinlochleven Junc B863), Northbound
Start time:13th of January 2025, 7:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Glencoe to Ballachulish SB - TTL
Location:A82 (Rd To Clachaig Ho to 09740) to A82 (S Ballachulish Rbt to Kinlochleven Junc B863), Southbound
Start time:13th of January 2025, 7:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Glenurquhart Rd to Kenneth St Inverness - Vergeworks SS
Location:A82 (Tomnahurich Br. to B862 Kenneth St.) to A82 (Kenneth St. to Telford St Rbt), Northbound
Start time:6th of January 2025, 12:00am
Description:Works:
Inspections
Traffic Management:
No Obstruction on Carriageway or Footway.
A82 Highland Boundary Loch Tulla - Stop/Go Works
Location:A82 (Creagan Criche Milestone to Highland Bdy), Northbound
Start time:14th of January 2025, 9:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A82 Inverarnan NB - Stop/Go Works
Location:A82 (Ardlui to Stirling/Argyle Bdy), Northbound
Start time:24th of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Stop/Go Boards Traffic Control (30mph)
A82 Inverbeg NB - Stop/Go Works
Location:A82 (Luss Access Nth to Inverbeg Bridge), Northbound
Start time:3rd of January 2025, 10:00am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control (30mph)
A82 Invergloy NB - TTL
Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Northbound
Start time:23rd of December 2024, 8:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Invergloy SB - TTL
Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Southbound
Start time:23rd of December 2024, 8:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Inverhervie North of Crianlarich NB - TTL
Location:A82 (Derest Sign to Euich Bridge) to A82 (Euich Bridge to Fillan Bridge), Northbound
Start time:27th of December 2024, 8:00am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A82 Inverhervie North of Crianlarich SB - TTL
Location:A82 (Euich Bridge to Fillan Bridge) to A82 (Derest Sign to Euich Bridge), Southbound
Start time:27th of December 2024, 8:00am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A82 Kingshouse NB - TTL
Location:A82 (White Corries to Junc To Glenetive) to A82 (Junc To Glenetive to Start Crash Barrier), Northbou
Start time:20th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Kingshouse SB - TTL
Location:A82 (White Corries to Junc To Glenetive) to A82 (Junc To Glenetive to Start Crash Barrier), Southbou
Start time:20th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Laggan NB - TTL
Location:A82 (Culvert Past Layby to Laggan Swing Br), Northbound
Start time:23rd of January 2025, 7:00am
Description:Works:
Parapet Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Laggan SB - TTL
Location:A82 (Culvert Past Layby to Laggan Swing Br), Southbound
Start time:23rd of January 2025, 7:00am
Description:Works:
Parapet Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Letterfinlay NB - TTL
Location:A82 (200m N Of 17m Milestone to L/Findlay North), Northbound
Start time:9th of January 2025, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Letterfinlay SB - TTL
Location:A82 (200m N Of 17m Milestone to L/Findlay North), Southbound
Start time:9th of January 2025, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Luss NB - TTL
Location:A82 (Luss Access Sth to Luss Bridge) to A82 (Luss Access Nth to Inverbeg Bridge), Northbound
Start time:6th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Luss SB - TTL
Location:A82 (Luss Access Nth to Inverbeg Bridge) to A82 (Luss Access Sth to Luss Bridge), Southbound
Start time:6th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 NB Dumbarton Road - Lane Closure with Diverson
Location:A82 (Dunglass Roundabout to A914 Dumbuck) to A82 (A914 Dumbuck to Greenhead Road), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
Diversion Information:
Access from A82 Dumbarton Road to A814 Glasgow Road will be closed during off peak hours (09.30-15.30). Below diversion route will be in place for all vehicles including HGV.
Traffic will continue West on the A82 > Turn left onto Greenhead Road > Re-join A814 Glasgow Road at Greenhead Road junction.
A82 Nevis Rnbt Fort William - Convoy Works
Location:A82 (Nevis Br Mini Rbt to Nevis Br Mini Rbt), Southbound
Start time:16th of March 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A82 SB Stirling Road - Lane Closure
Location:A82 (Barloan Rbt to Greenhead Rd) to A82 (Greenhead Rd to A914 Dumbuck), Southbound
Start time:30th of December 2024, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
A82 Shorelands Lodges North of Fort Augustus NB - TTL
Location:A82 (Inchnacardoch Hotel to 1st L B4 C/Site), Northbound
Start time:13th of January 2025, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Shorelands Lodges North of Fort Augustus SB - TTL
Location:A82 (Inchnacardoch Hotel to 1st L B4 C/Site), Southbound
Start time:13th of January 2025, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Spean Bridge NB - TTL
Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Northbound
Start time:16th of January 2025, 7:00am
Description:Works:
Parapet Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Spean Bridge NB - TTL
Location:A82 (A86 Jct to B8004 Jct), Northbound
Start time:13th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Spean Bridge SB - TTL
Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Southbound
Start time:16th of January 2025, 7:00am
Description:Works:
Parapet Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Spean Bridge SB - TTL
Location:A82 (A86 Jct to B8004 Jct), Southbound
Start time:13th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A82 Tyndrum - Stop/Go Works
Location:A82 (Fillan Bridge to A85 Jct), Southbound
Start time:3rd of January 2025, 12:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control.
A828 Beinn Sgluish North of Appin NB - Road Closure with Amnesties
Location:A828 (Milestone to Mile Stone), Northbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 & 0400
A828 Beinn Sgluish North of Appin SB - Road Closure with Amnesties
Location:A828 (Milestone to Mile Stone), Southbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
No Diversion - Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 & 0400
A828 Glenachulish West of Ballachulish NB - TTL
Location:A828 (Inshaig Br to Under Ballachulish Br), Northbound
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A828 Glenachulish West of Ballachulish SB - TTL
Location:A828 (Inshaig Br to Under Ballachulish Br), Southbound
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A828 Ledaig NB - TTL
Location:A828 (Nth Side Connel Br to Ledaig House), Northbound
Start time:10th of January 2025, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A828 Ledaig SB - TTL
Location:A828 (Nth Side Connel Br to Ledaig House), Southbound
Start time:10th of January 2025, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Aray Bridge East of Inveraray NB - TTL
Location:A83 (Shira Bridge to A819 Jct), Northbound
Start time:15th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Aray Bridge East of Inveraray SB - TTL
Location:A83 (Shira Bridge to A819 Jct), Southbound
Start time:15th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Ardgarten South of Arrochar NB - Road Closure with Amnesties
Location:A83 (Ardgarten Caravan Pk to Jct B828), Northbound
Start time:14th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0100 & 0300
A83 Ardgarten South of Arrochar SB - Road Closure with Amnesties
Location:A83 (Ardgarten Caravan Pk to Jct B828), Southbound
Start time:14th of January 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties.
Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0100 & 0300
A83 Arrochar - Stop/Go Works
Location:A83 (Tarbet to A814 Jct) to A83 (A814 Jct to R. Loin O/Bridge), Southbound
Start time:21st of January 2025, 10:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A83 Arrochar - Stop/Go Works
Location:A83 (A814 Jct to R. Loin O/Bridge) to A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Southbound
Start time:23rd of January 2025, 10:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A83 Auchindrain South of Inveraray SB - TTL
Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Southbound
Start time:3rd of February 2025, 7:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Douglas Water South of Inveraray - Convoy Works
Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Northbound
Start time:13th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A83 Glenbarr NB - TTL
Location:A83 (Killiegruer Junc to Argyll Hotel) to A83 (Glenbarr Junc to Killegruer Junc), Northbound
Start time:14th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Glenbarr SB - TTL
Location:A83 (Glenbarr Junc to Killegruer Junc) to A83 (Killiegruer Junc to Argyll Hotel), Southbound
Start time:14th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Kilmory Lochgilphead NB - TTL
Location:A83 (Kilmory Castle Rbt to 30mph Lochgilphead South), Northbound
Start time:14th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Kilmory Lochgilphead SB - TTL
Location:A83 (Kilmory Castle Rbt to 30mph Lochgilphead South), Southbound
Start time:14th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 OMR Rest and Be Thankful NB - TTL
Location:A83 (Diversion Route Start to Diversion Route End), Northbound
Start time:6th of January 2025, 7:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A83 OMR Rest and Be Thankful SB - TTL
Location:A83 (Diversion Route Start to Diversion Route End), Southbound
Start time:6th of January 2025, 7:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A83 Succoth Arrochar NB - TTL
Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Northbound
Start time:13th of January 2025, 8:00am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A83 Succoth Arrochar SB - TTL
Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Southbound
Start time:13th of January 2025, 8:00am
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A83 West Loch Tarbert NB - TTL
Location:A83 (C23 Glenakill Jct to B8026 W Loch Pier), Northbound
Start time:13th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A83 West Loch Tarbert SB - TTL
Location:A83 (C23 Glenakill Jct to B8026 W Loch Pier), Southbound
Start time:13th of January 2025, 7:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A830 Arieniskill Lochailort - Stop/Go Works
Location:A830 (Br E. Of Loch Eilt to Boatshed W. L.Eilt) to A830 (Boatshed W. L.Eilt to A861 Junction), Westb
Start time:13th of January 2025, 10:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A830 Banavie - Convoy Works
Location:A830 (Corpach Roundabout to B8004 Banavie Junction), Eastbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A830 Lubfearn North of Inchbae WB - TTL
Location:A835 (Inchbae Lodge to 150m Past Black Br), Westbound
Start time:16th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A830 Ranochan EB - TTL
Location:A830 (Br E. Of Loch Eilt to Boatshed W. L.Eilt), Eastbound
Start time:16th of January 2025, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A830 Ranochan WB - TTL
Location:A830 (Br E. Of Loch Eilt to Boatshed W. L.Eilt), Westbound
Start time:16th of January 2025, 8:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Achnaclerach West of Gorstan - Vergworks
Location:A835 (A832 Gorstan Jct to Silverbridge) to A835 (Silverbridge to Inchbae Lodge), Westbound
Start time:13th of January 2025, 7:00am
Description:Works:
Drainage Works, Structural Repairs
Traffic Management:
No Obstruction on Carriageway or Footway.
A835 Contin EB - Road Closure
Location:A835 (Kinnahaird to A834 Jct), Eastbound
Start time:7th of January 2025, 7:00pm
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion EB via A834 to Dingwall, then A862 to rejoin A835 Maryburgh Rnbt, WB reverse
A835 Contin WB - Road Closure
Location:A835 (Kinnahaird to A834 Jct), Westbound
Start time:7th of January 2025, 7:00pm
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion EB via A834 to Dingwall, then A862 to rejoin A835 Maryburgh Rnbt, WB reverse
A835 Garve EB - TTL
Location:A835 (1 Mile West Of Tarvie to Garve Level Xing), Eastbound
Start time:13th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Garve WB - TTL
Location:A835 (1 Mile West Of Tarvie to Garve Level Xing), Westbound
Start time:13th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Gorstan EB - TTL
Location:A835 (A832 Gorstan Jct to Silverbridge) to A835 (Garve Level Xing to A832 Gorstan Jct), Eastbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Gorstan WB - TTL
Location:A835 (Garve Level Xing to A832 Gorstan Jct) to A835 (A832 Gorstan Jct to Silverbridge), Westbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Lael Forest West of Braemore EB - TTL
Location:A835 (A832 Braemore Jct to Inverlael Farm), Eastbound
Start time:23rd of December 2024, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A835 Lael Forest West of Braemore WB - TTL
Location:A835 (A832 Braemore Jct to Inverlael Farm), Westbound
Start time:23rd of December 2024, 7:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A84 Callander EB - TTL
Location:A84 (Start Main St to A81 Jct) to A84 (Station Rd to Derest Callander Nth), Eastbound
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A84 Callander WB - TTL
Location:A84 (Start Main St to A81 Jct) to A84 (Station Rd to Derest Callander Nth), Westbound
Start time:13th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A84 Main St Callander NB - TTL
Location:A84 (A81 Jct to Station Rd) to A84 (Station Rd to Derest Callander Nth), Northbound
Start time:6th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A84 Main St Callander SB - TTL
Location:A84 (Station Rd to Derest Callander Nth) to A84 (A81 Jct to Station Rd), Southbound
Start time:6th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A84 Straid House South of Callander NB - TTL
Location:A84 (W Coillechat Rd to Cambusbeg Fm Rd), Northbound
Start time:10th of February 2025, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A84 Straid House South of Callander SB - TTL
Location:A84 (W Coillechat Rd to Cambusbeg Fm Rd), Southbound
Start time:10th of February 2025, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Achnacloich East of Connel EB - TTL
Location:A85 (Jct Ardnaskie Wood to A85 Jct), Eastbound
Start time:14th of January 2025, 8:00am
Description:Works:
Traffic Loops
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Achnacloich East of Connel WB - TTL
Location:A85 (Jct Ardnaskie Wood to A85 Jct), Westbound
Start time:14th of January 2025, 8:00am
Description:Works:
Traffic Loops
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Arinbea West of Tyndrum - Stop/Go Works
Location:A85 (Stirling/Argyle Bndy to M.S Nr Arinabea), Westbound
Start time:24th of December 2024, 10:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Stop/Go Boards Traffic Control (30mph)
A85 Arinbea West of Tyndrum EB - TTL
Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Eastbound
Start time:31st of December 2024, 12:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Arinbea West of Tyndrum WB - TTL
Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Westbound
Start time:31st of December 2024, 12:00pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Arrivain EB - TTL
Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Eastbound
Start time:23rd of December 2024, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Arrivain East of Dalmally EB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Eastbound
Start time:31st of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Arrivain East of Dalmally WB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound
Start time:31st of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Arrivain WB - TTL
Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Westbound
Start time:23rd of December 2024, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Arrivain West of Tyndrum EB - TTL
Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain) to A85 (Milestone Nr Arivain to Mile Stone), Eastbound
Start time:13th of January 2025, 7:00am
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Arrivain West of Tyndrum WB - TTL
Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain) to A85 (Milestone Nr Arivain to Mile Stone), Westbound
Start time:13th of January 2025, 7:00am
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Balgowan Forbrae EB - TTL
Location:A85 (30 Mph West Of Methven to U4 To Keillour (East)), Eastbound
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Balgowan Forbrae WB - TTL
Location:A85 (30 Mph West Of Methven to U4 To Keillour (East)), Westbound
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Comrie - Event
Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie) to A85 (30 Mph W Of Comrie to U197 Dalchonzie), Westbou
Start time:31st of December 2024, 10:00pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
A85 Crianlarich EB - Road Closure
Location:A85 (A82 Junction to Crianlarich Nrth R/About), Eastbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
A82 > Glenfalloch Road & Vice Versa
A85 Crianlarich WB - Road Closure
Location:A85 (A82 Junction to Crianlarich Nrth R/About), Westbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
A82 > Glenfalloch Road & Vice Versa
A85 Cruachan EB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Eastbound
Start time:20th of January 2025, 9:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Cruachan WB - TTL
Location:A85 (School Lochawe to M.S. Jct Lorn Area), Westbound
Start time:20th of January 2025, 9:00am
Description:Works:
Ecological Survey
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dunbeg EB - TTL
Location:A85 (A85 Jct to Sewage Plant Dunbeg), Eastbound
Start time:17th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dunbeg WB - TTL
Location:A85 (A85 Jct to Sewage Plant Dunbeg), Westbound
Start time:17th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Dunollie Rd Oban EB - Road Closure with Amnesties
Location:A85 (Jct Croft Rd to Jct Corran Park Mini Rbt) to A85 (Lodge to Jct Croft Rd), Eastbound
Start time:2nd of February 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION -
Amnesties at 9,10,11,12,02,04.
A85 Dunollie Rd Oban WB - Road Closure with Amnesties
Location:A85 (Lodge to Jct Croft Rd) to A85 (Jct Croft Rd to Jct Corran Park Mini Rbt), Westbound
Start time:2nd of February 2025, 8:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION -
Amnesties at 9,10,11,12,02,04.
A85 Gilmerton EB - TTL
Location:A85 (30 Mph E Of Gilmerton to A822 Junction) to A85 (U7 Milton Of Cultoquehy to 30 Mph E Of Gilmerto
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Gilmerton WB - TTL
Location:A85 (U7 Milton Of Cultoquehy to 30 Mph E Of Gilmerton) to A85 (30 Mph E Of Gilmerton to A822 Junctio
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Glen Lochy East of Dalmally EB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Eastbound
Start time:31st of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Glen Lochy East of Dalmally WB - TTL
Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound
Start time:31st of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Glen Ogle North of Lochearnhead EB - TTL
Location:A85 (Derest Sign to Stone Culvert), Eastbound
Start time:30th of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Glen Ogle North of Lochearnhead WB - TTL
Location:A85 (Derest Sign to Stone Culvert), Westbound
Start time:30th of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Huntingtower EB - TTL
Location:A85 (U45 Ruthvenfield to C410 Huntingtower) to A85 (A85 Rbt West Of A9 to U45 Ruthvenfield), Eastbou
Start time:8th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Huntingtower WB - TTL
Location:A85 (A85 Rbt West Of A9 to U45 Ruthvenfield) to A85 (U45 Ruthvenfield to C410 Huntingtower), Westbou
Start time:8th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Lix Toll Killin EB - TTL
Location:A85 (Glenoglehead Cott to A827 Jct), Eastbound
Start time:30th of December 2024, 10:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Lix Toll Killin WB - TTL
Location:A85 (Glenoglehead Cott to A827 Jct), Westbound
Start time:30th of December 2024, 10:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS) (30mph)
A85 Lochearnhead - MLC
Location:A85 (40 Mph Signs to A84 Junction), Westbound
Start time:24th of December 2024, 10:00am
Description:Works:
Gully Emptying
Traffic Management:
Mobile Lane Closures (30mph)
A85 Main Street Methven - Scaffold
Location:A85 (Church Road to College Road), Eastbound
Start time:13th of January 2025, 7:00am
Description:Works:
Skip/Scaffold
Traffic Management:
No Obstruction on Carriageway or Footway.
A85 Methven EB - TTL
Location:A85 (30 Mph West Of Methven to U4 To Keillour (East)) to A85 (James Street to 30 Mph West Of Methven
Start time:14th of January 2025, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 Methven WB - TTL
Location:A85 (James Street to 30 Mph West Of Methven) to A85 (30 Mph West Of Methven to U4 To Keillour (East)
Start time:14th of January 2025, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A85 North of Lochearnhead - Stop/Go Works
Location:A85 (Derest Sign to Stone Culvert), Westbound
Start time:3rd of January 2025, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Stop/Go Boards Traffic Control (30mph)
A85 Stronmilchan Junction East of Lochawe EB - Road Closure with Amnesties
Location:A85 (A819 Junction to School Lochawe), Eastbound
Start time:12th of February 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400
A85 Stronmilchan Junction East of Lochawe WB - Road Closure with Amnesties
Location:A85 (A819 Junction to School Lochawe), Westbound
Start time:12th of February 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure with Amnesties (10mph)
Diversion Information:
NO DIVERSION
Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400
A85 West Lodge Estate Comrie EB - TTL
Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie), Eastbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Gully Emptying
Traffic Management:
Portable Traffic Lights (TTLS).
A85 West Lodge Estate Comrie WB - TTL
Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie), Westbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Gully Emptying
Traffic Management:
Portable Traffic Lights (TTLS).
A86 Kinloch Laggan West of Strathmashie -Stop/Go Works
Location:A86 (Ardverikie Hse Acc to Aberarder Acc), Westbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Stop/Go Boards Traffic Control.
A86 Kinloch Laggan West of Strathmashie EB - TTL
Location:A86 (Strathmashie Hse Sth Acc to Ardverikie Hse Acc), Eastbound
Start time:27th of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A86 Kinloch Laggan West of Strathmashie WB - TTL
Location:A86 (Strathmashie Hse Sth Acc to Ardverikie Hse Acc), Westbound
Start time:27th of December 2024, 8:00am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A87 Bun Loyne EB - TTL
Location:A87 (Inverness Dist Bdy to A887 Jct), Eastbound
Start time:9th of January 2025, 7:00am
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A87 Bun Loyne WB - TTL
Location:A87 (Inverness Dist Bdy to A887 Jct), Westbound
Start time:9th of January 2025, 7:00am
Description:Works:
Barrier Repair
Traffic Management:
Portable Traffic Lights (TTLS).
A887 Livishie Power Station Dundreggan EB - TTL
Location:A887 (Dund'An Dam Acc Rd to U137 Inverwick Jct), Eastbound
Start time:23rd of January 2025, 7:00am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A887 Livishie Power Station Dundreggan WB - TTL
Location:A887 (Dund'An Dam Acc Rd to U137 Inverwick Jct), Westbound
Start time:23rd of January 2025, 7:00am
Description:Works:
Inspections
Traffic Management:
Portable Traffic Lights (TTLS).
A889 Dochaid Abhacain Dalwhinnie - TTL
Location:A889 (A9 Jct to Speed Rest), Southbound
Start time:2nd of June 2025, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Aberuthven- Convoy S/B
Location:A9 (Aberuthven Jct to Abbey Rd Br.), Southbound
Start time:15th of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Convoy Working.
A9 Aberuthven- Lane Closure/Convoy N/B
Location:A9 (Abbey Rd Br. to A824 Jct Aberuthven), Northbound
Start time:14th of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
14/11/2024 - Lane Closure, 15/11/2024 - Lane Closure, 15/11/2024 - Convoy Working, 16/11/2024 - Convoy Working, 16/11/2024 - Convoy Working, 17/11/2024 - Convoy Working
A9 Ballachraggan Farm Alness NB - Road Closure
Location:A9 (B9176 Struie Jct to B817 Dalmore Jct), Northbound
Start time:19th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
DIVERSION VIA B9176 + B817
A9 Ballachraggan Farm Alness SB - Road Closure
Location:A9 (B9176 Struie Jct to B817 Dalmore Jct), Southbound
Start time:19th of January 2025, 7:00pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
DIVERSION VIA B9176 + B817
A9 Ballinluig NB - Convoy
Location:A9 (Jct (R) To Guay to Start Of Dual Cway) to A9 (Start Of Dual C/Way to A827 Jct Nb), Northbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Lining Works, Resurfacing
Traffic Management:
Convoy Working (10mph)
A9 Ballinluig NB - Lane Closure
Location:A9 (Jct (R) To Guay to Start Of Dual Cway) to A9 (Start Of Dual C/Way to A827 Jct Nb), Northbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Lining Works, Resurfacing
Traffic Management:
Lane Closure (50mph)
A9 Ballinluig Off Slip NB - Full Slip Closure
Location:A9 (Slip Off From A9 To A827 Rbt to A827 Rbt), Northbound
Start time:14th of January 2025, 7:00pm
Description:Works:
Lining Works, Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
Follow A9 Pitlochry North to A924 junction, thereafter travel south on A9
A9 Berridale NB - TTL
Location:A9 (Snowgates Berriedale to P.O. Berriedale) to A9 (P.O. Berriedale to S Jct Newport), Northbound
Start time:27th of December 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Berridale SB - TTL
Location:A9 (P.O. Berriedale to S Jct Newport) to A9 (Snowgates Berriedale to P.O. Berriedale), Southbound
Start time:27th of December 2024, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Blackford- lane Closure S/B
Location:A9 (B8081 Blackford to U/C To Tarneybackle), Southbound
Start time:27th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A9 Brora - Planned Event
Location:A9 (D'Geon Pk Rd to Fountain Sq) to A9 (Mill Jct to S Dalchalm Jct), Northbound
Start time:1st of January 2025, 4:30pm
Description:Works:
Planned Event
Traffic Management:
Road Closure.
Diversion Information:
via Lower Brora & Harbour Road, Brora
A9 Carrbridge NB - TTL
Location:A9 (River Dulnain to A938 Carrbridge Jct), Northbound
Start time:14th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Carrbridge SB - TTL
Location:A9 (River Dulnain to A938 Carrbridge Jct) to A9 (End Of Climbing Lane to River Dulnain), Southbound
Start time:14th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Crossgates NB - Lane closure
Location:A9 (Broxden Rbt to Burnside Lodge), Northbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Crossgates to Forgandenny, Forteviot SB - Lane closure
Location:A9 (Broxden Rbt to Burnside Lodge) to A9 (Burnside Lodge to Aberuthven Jct), Southbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Dalguise North of Dunkeld - Vergeworks
Location:A9 (B898 Jct to Jct (R) To Guay), Northbound
Start time:23rd of January 2025, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Dalguise North of Dunkeld NB - TTL
Location:A9 (B898 Jct to Jct (R) To Guay), Northbound
Start time:23rd of January 2025, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalguise North of Dunkeld SB - TTL
Location:A9 (B898 Jct to Jct (R) To Guay), Southbound
Start time:23rd of January 2025, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalnamein South of Drumochter NB - TTL
Location:A9 (B847 Calvine Jct to Start Dual Calvine), Northbound
Start time:20th of January 2025, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalnamein South of Drumochter SB - TTL
Location:A9 (B847 Calvine Jct to Start Dual Calvine), Southbound
Start time:20th of January 2025, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalnamien NB - TTL
Location:A9 (B847 Calvine Jct to Start Dual Calvine), Northbound
Start time:23rd of December 2024, 7:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dalnamien SB - TTL
Location:A9 (B847 Calvine Jct to Start Dual Calvine), Southbound
Start time:23rd of December 2024, 7:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Daviot SB - Lane Closure
Location:A9 (B9177 Jct to B851 Culloden Jct), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A9 Delny North of Tomich - Stop/Go Works
Location:A9 (Smelter Junction Tomich to B817 Kildary Junction), Northbound
Start time:10th of February 2025, 10:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A9 Dowally North of Dunkeld NB - TTL
Location:A9 (B898 Jct to Jct (R) To Guay), Northbound
Start time:14th of January 2025, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dowally North of Dunkeld SB - TTL
Location:A9 (B898 Jct to Jct (R) To Guay), Southbound
Start time:14th of January 2025, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Dunfallandy Pitlochry - Vergeworks
Location:A9 (End Of Dual to Start Of Dual), Northbound
Start time:20th of January 2025, 9:00am
Description:Works:
Drainage Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Essangal Blair Atholl NB - TTL
Location:A9 (End Of Slip to Bruar Jct Nb), Northbound
Start time:10th of February 2025, 6:01am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Essangal Blair Atholl SB - TTL
Location:A9 (End Of Slip to Bruar Jct Nb) to A9 (A9 On Slip (Eb) to End Of Slip), Southbound
Start time:10th of February 2025, 6:01am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Forgandenny, Crossgates NB - Lane closure
Location:A9 (A824 Jct Aberuthven to Burnside Lodge) to A9 (Burnside Lodge to Broxden Rbt), Northbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Greenloaning NB - Lane closure
Location:A9 (Council Bdy to A822 Jct) to A9 (A822 Jct to U/C To Tarneybackle), Northbound
Start time:23rd of December 2024, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A9 Greenloaning NB- Lane closure
Location:A9 (A822 Jct to U/C To Tarneybackle), Southbound
Start time:22nd of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A9 Inveralmond Rnbt Perth to Luncarty NB - Lane Closure
Location:A9 (End Dual Cway to Jct (R) To Luncarty), Northbound
Start time:13th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure (50mph)
A9 Inveralmond Rnbt Perth to Luncarty SB - Lane Closure
Location:A9 (End Dual Cway to Jct (R) To Luncarty) to A9 (End Dual Cway to Inveralmond Rbt), Southbound
Start time:13th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Lane Closure (50mph)
A9 Keir to Stockbridge NB - Lane closure
Location:A9 (Keir Rbt to Off Slip To A820) to A9 (A820 O'Bridge to On Slip From A820), Northbound
Start time:12th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Keir to Stockbridge SB - Lane closure
Location:A9 (Off Slip To A820 to A820 O'Bridge) to A9 (On Slip From A820 to Keir Rbt), Southbound
Start time:12th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Killiecrankie NB - TTL
Location:A9 (End Dual Nb to Slip To Blair Atholl Nb), Northbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Killiecrankie SB - TTL
Location:A9 (End Dual Nb to Slip To Blair Atholl Nb), Southbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Filter Drain
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Killiecrankie Viaduct NB - Lane Closure
Location:A9 (St Dual Nth Faskally to End Dual Nb), Northbound
Start time:5th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A9 Kindallachan South of Ballinluig - Vergeworks
Location:A9 (Jct (R) To Guay to Start Of Dual Cway), Northbound
Start time:17th of January 2025, 7:30pm
Description:Works:
Third Party Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Luncarty SB - Lane Closure
Location:A9 (End Dual Cway to Jct (R) To Luncarty) to A9 (End Dual Cway to Inveralmond Rbt), Southbound
Start time:31st of December 2024, 8:00am
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure (50mph)
A9 Moy Rail South of Moy NB - TTL
Location:A9 (B9154 Moy Jn to Start 3 Lane), Northbound
Start time:20th of January 2025, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Moy Rail South of Moy SB - TTL
Location:A9 (B9154 Moy Jn to Start 3 Lane), Southbound
Start time:20th of January 2025, 7:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Navidale Helmsdale - Vergeworks
Location:A9 (Old Caithness Road to Navidale Rbt), Northbound
Start time:13th of January 2025, 7:00am
Description:Works:
Drainage Works
Traffic Management:
No Obstruction on Carriageway or Footway.
A9 Nigg Rnbt NB - Lane Closure
Location:A9 (Glastullich Roundabout to Glastullich Roundabout) to A9 (Glastullich Roundabout to End Of Climbi
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Nigg Rnbt South of Tain SB - Narrow Lanes
Location:A9 (Glastullich Roundabout to Glastullich Roundabout), Southbound
Start time:10th of January 2025, 8:00am
Description:Works:
Lighting Works
Traffic Management:
Road Narrowing (Two Way Working).
A9 Pitlochry NB - Lane Closure
Location:A9 (Entry Slip From A924 to A827 Jct) to A9 (A924 Off Slip to End Of Dual Cway), Northbound
Start time:30th of December 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure (50mph)
A9 Pitlochry NB - TTL
Location:A9 (Start Of Dual Cway to Entry Slip From A924) to A9 (End Of Dual to Start Of Dual), Northbound
Start time:30th of December 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Pitlochry SB - TTL
Location:A9 (Start Of 2 Lane Slip to End Of 2 Way Slip) to A9 (End Of Dual to Start Of Dual), Southbound
Start time:30th of December 2024, 8:00am
Description:Works:
Carriageway Patching
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Raigmore Onlsip SB - Slip Closure
Location:A9 (Raigmore Interchange Roundabout to Raigmore Interchange Roundabout) to A9 (A96 Raigmore Rbt to O
Start time:13th of January 2025, 8:00pm
Description:Works:
Drainage Works
Traffic Management:
Road Closure.
Diversion Information:
Traffic diverted up to Longman Roundabout and back A9 SB.
A9 Ralia South of Kingussie NB - Lane Closure
Location:A9 (B9150 Newtonmore Jct to Start Of Climbing Lane) to A9 (Start Of Climbing Lane to End Of Climbing
Start time:7th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A9 Roadside North of Georgemas Jnct - Stop/Go Works
Location:A9 (A882 Jct Georgemas to Jct Hilliclay), Northbound
Start time:12th of February 2025, 10:00am
Description:Works:
Pavement Surveys
Traffic Management:
Stop/Go Boards Traffic Control.
A9 SB Crossgates SB - Lane closure
Location:A9 (Broxden Rbt to Burnside Lodge), Southbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Boundary Fence Repairs
Traffic Management:
Lane Closure.
A9 Skiach Services Alness NB - TTL
Location:A9 (B817 Jct to B9176 Struie Jct) to A9 (B9176 Struie Jct to B817 Dalmore Jct), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Skiach Services Alness SB - TTL
Location:A9 (B9176 Struie Jct to B817 Dalmore Jct) to A9 (B817 Jct to B9176 Struie Jct), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Lighting Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Stockbridge on Slip Lane Closure
Location:A9 (A820 Jct to On Slip To A9), Northbound
Start time:8th of January 2025, 9:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Lane Closure.
A9 Stockbridge, Dunblane - Lane 1 S/B closure
Location:A9 (A820 O'Bridge to On Slip From A820), Southbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Trial hole investigation
Traffic Management:
Lane Closure (50mph)
Diversion Information:
A820 into Dunblane turn right onto B8033 to Keir Rbt
A9 Stockbridge, Dunblane - S/B on slip closure
Location:A9 (A820 O'Bridge to On Slip From A820), Southbound
Start time:13th of January 2025, 7:30pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure (50mph)
Diversion Information:
A820 into Dunblane turn right onto B8033 to Keir Rbt
A9 Tomatin NB - Lane Closure
Location:A9 (Start Dual C'Way to R Findhorn Br) to A9 (R Findhorn Br to Start Single C'Way), Northbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A9 Tummel Jnct Pitlochry - Convoy Works
Location:A9 (End Of Dual to Start Of Dual), Northbound
Start time:23rd of January 2025, 7:00pm
Description:Works:
Lining Works, Resurfacing
Traffic Management:
Convoy Working (10mph)
A9 Tummel Pitlochry NB - TTL
Location:A9 (End Of Dual to Start Of Dual), Northbound
Start time:6th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Tummel Pitlochry SB - TTL
Location:A9 (End Of Dual to Start Of Dual), Southbound
Start time:6th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A9 Whitemoss , Aberuthven NB - Lane closure
Location:A9 (Abbey Rd Br. to A824 Jct Aberuthven), Northbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A9 Whitemoss , Aberuthven SB - Lane closure
Location:A9 (Aberuthven Jct to Abbey Rd Br.), Southbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A90 / A982 Jct, Peterhead. N/B TTL's
Location:A90 (A950 Rbt to A982 North Rd) to A90 (A982 North Rd to Jn L Kirktown), Northbound
Start time:9th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 43 Cross St Fraserburgh. SB - TTL
Location:A90 (Jn X Commerce St to Jct A98 High St), Southbound
Start time:7th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 Ellon Signage Only N/B
Location:A90 (Ellon Rbt (N) to Ellon Rbt (N)) to A90 (Ellon Roundabout North to Jcn (L) To Leys), Northbound
Start time:21st of January 2025, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Glendoick- Lane Closure N/B
Location:A90 (Off Slip B958 to Pitroddie Fm Jct), Northbound
Start time:20th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
A90 Glendoick- Lane Closure S/B
Location:A90 (Pitroddie Jct to B958 Glencarse), Southbound
Start time:20th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
A90 Invernettie- Diversion Signage- N/B
Location:A90 (Invernettie Rbt to A950 Rbt), Northbound
Start time:6th of January 2025, 7:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A90 Kinfauns- Lane Closure N/B
Location:A90 (Kinfauns Jct to Off Slip B958) to M90 (On Slip From A90 to Scconieburn O'Bridge), Northbound
Start time:24th of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A90 Kingsway east NB - Lane closure
Location:A90 (On Slip From Clep Rd to Strathmartine Rd Rbt) to A90 (Old Gamis Rd Rbt to 2 To 3 Lane C/Way), N
Start time:6th of January 2025, 7:30pm
Description:Works:
Pedestrian Crossing works
Traffic Management:
Lane Closure.
A90 Kingsway east SB - Lane closure
Location:A90 (On Slip From Clep Rd to Strathmartine Rd Rbt) to A90 (Old Gamis Rd Rbt to 2 To 3 Lane C/Way), S
Start time:6th of January 2025, 7:30pm
Description:Works:
Pedestrian Crossing works
Traffic Management:
Lane Closure.
A90 Millhill, St Combs, Crimmond - Road Closure
Location:A90 (Jn R Starnafin to Jn R B9033 St.Combs), Southbound
Start time:12th of January 2025, 7:30pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Exit the A90 onto the A952 to Mintlaw then the A950 returning to the A90 at Peterhead.
A90 Millhill, St Combs, Crimmond - Road Closure
Location:A90 (Jn R Starnafin to Jn R B9033 St.Combs), Northbound
Start time:12th of January 2025, 7:30pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Leave the A90 at Peterhead onto the A950 to Mintlaw, take the A952 back to A90.
A90 North Water Bridge, Sth of Laurencekirk. N/B Lane closures
Location:A90 (On Slip Stracath Hosp to North Esk Br) to A90 (North Esk Br to B974 Jct Fettercairn), Northboun
Start time:6th of January 2025, 8:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure (50mph)
A90 North Water Bridge, Sth of Laurencekirk. S/B Lane closures
Location:A90 (Jct B974 Marykirk to R North Esk Br) to A90 (R North Esk Br to Stracathro Hosp Jct), Southbound
Start time:6th of January 2025, 8:00am
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure (50mph)
A90 Peterhead Bypass. S/B rolling TTL's
Location:A90 (A950 Rbt to A982 North Rd) to A90 (Invernettie Rbt to A950 Rbt), Southbound
Start time:7th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 Philorth, Sth of Fraserburgh - N/B Road closure with daytime TTL's
Location:A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S)), Northbound
Start time:12th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
12/01/2025 - Road Closure, 13/01/2025 - Road Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 13/01/2025 - Road Closure, 14/01/2025 - Road Closure, 14/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Road Closure, 15/01/2025 - Road Closure, 15/01/2025 - Portable Traffic Lights (TTLS), 15/01/2025 - Road Closure, 16/01/2025 - Road Closure, 16/01/2025 - Portable Traffic Lights (TTLS), 16/01/2025 - Road Closure, 17/01/2025 - Road Closure, 19/01/2025 - Portable Traffic Lights (TTLS), 19/01/2025 - Road Closure, 20/01/2025 - Road Closure, 20/01/2025 - Portable Traffic Lights (TTLS)
Diversion Information:
B9032 > Memsie, onto the A981 > Fraserburgh
A90 Philorth, Sth of Fraserburgh - S/B Road closure with daytime TTL's
Location:A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S)), Southbound
Start time:12th of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
12/01/2025 - Road Closure, 13/01/2025 - Road Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 13/01/2025 - Road Closure, 14/01/2025 - Road Closure, 14/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Road Closure, 15/01/2025 - Road Closure, 15/01/2025 - Portable Traffic Lights (TTLS), 15/01/2025 - Road Closure, 16/01/2025 - Road Closure, 16/01/2025 - Portable Traffic Lights (TTLS), 16/01/2025 - Road Closure, 17/01/2025 - Road Closure, 19/01/2025 - Portable Traffic Lights (TTLS), 19/01/2025 - Road Closure, 20/01/2025 - Road Closure, 20/01/2025 - Portable Traffic Lights (TTLS)
Diversion Information:
A981 to Memsie onto B9032 to A90
A90 Rait Jcn, Glendoick- lane 2 Closure N/B
Location:A90 (Pitroddie Fm Jct to Inchmichael Int) to A90 (Inchmichael Int to B953 Inchture), Northbound
Start time:26th of January 2025, 7:30pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A90 Rait Jcn, Glendoick- lane 2 Closure S/B
Location:A90 (B953 Inchture to Inchmichael Int) to A90 (Inchmichael Int to Pitroddie Jct), Southbound
Start time:26th of January 2025, 7:30pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure (50mph)
A90 Rathen NB - Layby closure
Location:A90 (Jn T A952 Cortes to Jn L B9032 Memsie), Northbound
Start time:23rd of January 2025, 9:30am
Description:Works:
Trial hole investigation
Traffic Management:
Lane Closure.
A90 South Lodge, North of Rathen NB - Temporary traffic signals
Location:A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S)), Northbound
Start time:21st of January 2025, 9:30am
Description:Works:
Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A90 South of Peterhead - TTL's
Location:A90 (Jn R B9108 Boddam to Invernettie Rbt), Southbound
Start time:13th of January 2025, 7:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A90 St Madoes - Signage only- S/B
Location:A90 (Inchmichael Int to B953 Inchture) to A90 (Kinfauns Jct to M90), Southbound
Start time:22nd of January 2025, 8:00am
Description:Works:
Advanced signage/diversion on verge
Traffic Management:
No Obstruction on Carriageway or Footway.
A92 Crossgates Layby NB - Lane closure
Location:A92 (B981 O'Bridge to Off Slip A909), Northbound
Start time:7th of January 2025, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
A92 Crossgates NB - Lane closure
Location:M90 (M90 Overbridge to Crossgates Eb On Slip) to A92 (B981 O'Bridge to Off Slip A909), Northbound
Start time:10th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A92 Crossgates SB - Lane closure
Location:A92 (On Slip From A909 to B981 O'Bridge) to M90 (Crossgates Wb Off Slip to M90 Sb), Southbound
Start time:10th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
A92 Luthrie- TTL S/B
Location:A92 (Starr Farm to C29 Xroads) to A92 (C24 Newington to Starr Farm), Southbound
Start time:7th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Aberlour NB - TTL
Location:A96 (Jct Alves Church to Jct Kinloss) to A95 (Junct (R) M'Town Of E'Ville to A941 Dufftown), Northbo
Start time:20th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Craigellachie NB - TTL
Location:A95 (Junct (R) M'Town Of E'Ville to A941 Dufftown) to A95 (A941 Dufftown to Junct A941 To Elgin), No
Start time:13th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 Keith- TTL S/B
Location:A95 (C54 Muldearie Rd to A96 Haughs Bridge), Southbound
Start time:6th of January 2025, 7:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 NB Cromdale - TTLS
Location:A95 (Sp Rest Sign Cromdale to Speed Derest Sign), Northbound
Start time:6th of January 2025, 9:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 North of Tormore, Bridge of Avon - S/B TTL
Location:A95 (Moray Boundary to B9137 Cragganmore), Southbound
Start time:6th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A95 SB Aberlour High St - TTL
Location:A95 (Junct (R) M'Town Of E'Ville to A941 Dufftown), Southbound
Start time:9th of January 2025, 9:30am
Description:Works:
Gully/ironwork repairs
Traffic Management:
Portable Traffic Lights (TTLS).
A95 South of Aberlour NB - TTL
Location:A95 (C18 Jct Carron to Jct (R) To Milltown Of Edinville), Northbound
Start time:13th of January 2025, 8:00am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Blackhall Rbt. E/B access closure
Location:A96 (Blackhall Rbt (E) to Blackhall Rbt (E)) to A96 (Inverurie Rbt (W) to Blackhall Rbt (E)), Eastbo
Start time:2nd of February 2025, 8:00am
Description:Works:
Landscape Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Left onto B9170, right onto Market Place (B9001), right onto St James's Place (B993), left onto Elphinstone Rd (B933) and returning to A96 at Inverurie Rbt.
A96 Blackhillock WB - Stop and go
Location:A96 (Jct B9115 Drummuir to Jct Keith Mkt Grd), Westbound
Start time:6th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Stop/Go Boards Traffic Control.
A96 Blackhillock WB - Temporary traffic signals
Location:A96 (Jct B9115 Drummuir to Jct Keith Mkt Grd), Westbound
Start time:13th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Buckie junction WB - Temporary traffic signals
Location:A96 (Jct B9017 Newmill to Jn R B9016 Buckie) to A96 (Jn R B9016 Buckie to Jct Mulben), Westbound
Start time:20th of January 2025, 9:30am
Description:Works:
Trial hole investigation
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Home farm , Pitcaple EB - TTLS
Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork), Eastbound
Start time:7th of January 2025, 7:30pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Keith- TTL E/B
Location:A96 (Jn R B9016 Buckie to Jct Mulben) to A95 (C54 Muldearie Rd to A96 Haughs Bridge), Eastbound
Start time:20th of January 2025, 9:30am
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Keith- TTL E/B
Location:A96 (Jct A95 Banff to Jct B9116 Newmill) to A96 (Jct B9116 Newmill to Jct B9014 Dufftown), Eastbound
Start time:23rd of December 2024, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Kintore W/B on slip, lane 1 closure
Location:A96 (B977 Over Br (W) to On Slip From B977), Westbound
Start time:16th of January 2025, 9:30am
Description:Works:
Landscape Maintenance
Traffic Management:
16/01/2025 - Lane Closure, 17/01/2025 - Lane Closure, 18/01/2025 - Lane Closure, 18/01/2025 - Road Closure, 18/01/2025 - Lane Closure, 19/01/2025 - Lane Closure, 19/01/2025 - Lane Closure( 50mph), 20/01/2025 - Lane Closure( 50mph), 21/01/2025 - Lane Closure( 50mph), 22/01/2025 - Lane Closure( 50mph)
Diversion Information:
B977 Gauchhill Rd/ School Rd (B977) to Northern Rd (B987) to Kintore Interchange.
A96 Nairn EB - TTL
Location:A96 (Nairn Mini Rbt to X-Rds At Tradespark), Eastbound
Start time:30th of December 2024, 9:30am
Description:Works:
Landscape Maintenance
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Nairn WB - TTL
Location:A96 (Forres Road Rbt to A939 Grantown Jnt) to A96 (A939 Grantown Junc to Nairn Mini Roundabout), Wes
Start time:21st of January 2025, 10:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Portable Traffic Lights (TTLS).
A96 Williamston Jct to Oldmeldrum Jct, Colpy. E/B Convoy
Location:A96 (Jct B992 Auchterless to Jct A920 Oldmeldrum), Eastbound
Start time:21st of January 2025, 7:30pm
Description:Works:
Resurfacing
Traffic Management:
Convoy Working (10mph)
A96, Port Elphinstone, Inverurie. N/B TTL's
Location:A96 (Inverurie Rbt (W) to Blackhall Rbt (E)), Northbound
Start time:20th of January 2025, 7:30pm
Description:Works:
Inspections: Structures
Traffic Management:
Portable Traffic Lights (TTLS).
A972 Kingsway East NB - Lane closure
Location:A972 (Arbroath Rd Rbt to East Milton Rbt), Northbound
Start time:6th of January 2025, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A972 Kingsway East SB - Lane closure
Location:A972 (East Milton Rbt to Arbroath Rd Rbt), Southbound
Start time:6th of January 2025, 9:00pm
Description:Works:
Utility Works
Traffic Management:
Lane Closure.
A985 - EB - High Valleyfield - Temp Lights
Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Eastbound
Start time:6th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A985 - EB - High Valleyfield - Temp Lights
Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Eastbound
Start time:6th of January 2025, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A985 - WB - High Valleyfield - Temp Lights
Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Westbound
Start time:6th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
A985 - WB - High Valleyfield - Temp Lights
Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Westbound
Start time:6th of January 2025, 9:30am
Description:Works:
Drainage Works
Traffic Management:
Portable Traffic Lights (TTLS).
Barrochan Rd NB at A737 Johnstone - Total Closure
Location:A737 (Off Slip To B789 to On Slip From B789) to A737 (B789 Rbt to On Slip From B789), Northbound
Start time:13th of January 2025, 10:00pm
Description:Works:
Carriageway Patching, Gully/ironwork repairs
Traffic Management:
Lane Closure.
Diversion Information:
follow diversion -
Right turn lane to A737 - Continue on A737 EB - Linwood EB offslip - 1st exit onto A761 - A761 - 1st exit onto Bridge of Weir Rd - Deafhillock Rbt - End
Bath Street - Hawick - Road Closure
Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Eastbound
Start time:6th of January 2025, 9:30am
Description:Works:
Footway Works, Kerbing Works
Traffic Management:
Road Closure.
Broxden NB - Lane closure
Location:A9 (Burnside Lodge to Broxden Rbt) to A9 (Broxden Rbt to Broxden Rbt), Northbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M73 Northbound Junction 1 to Junction 2 - Offside & Adjacent lane closure
Location:M73 (Mainline 3 To 2 Lane to Bailleston Int O/B), Northbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M73 Northbound Junction 1 to Junction 3 - Hard Shoulder Closure
Location:M74 (End Of Slip With Hs to Merge To M73) to M73 (M80 Dbfo Extent to Mollinsburn O/B), Northbound
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M73 Northbound Junction 2 on-slip - Total closure
Location:M73 (A8 Bailleston Rbt to On Slip M73 (Nb)), Northbound
Start time:20th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Baillieston Roundabout, M73 Southbound Junction 2 on-slip, M73 Southbound to M74 Northbound link road, Daldowie off-slip & Return Northbound to M73.
M73 Northbound Junction 2 to Junction 2A - Offside lane closure
Location:M73 (N/B Baillieston Int to N/B Gartcosh Off Slip), Northbound
Start time:14th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M73 Northbound Junction 2A on-slip - Total closure
Location:M73 (Bowling Green Roundabout to Entry To M73 Nb), Northbound
Start time:21st of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
M73 Southbound Junction 2A on-slip, M73 Southbound Junction 2 off-slip, A8(M) Baillieston Roundabout, M73 Northbound Junction 2 on-slip.
M73 Northbound on-slip from Daldowie - Total closure
Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip), Northbound
Start time:17th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 Jct 3A NB on-slip, M74 NB, M74 NB Jct 2A off-slip, M74 SB Jct 2A on-slip
M73 Northbound on-slip from Daldowie lights - Total closure
Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip), Northbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.
M73 Southbound Junction 2A on-slip - Total closure
Location:M73 (Auldyards Road Roundabout to Entry To M73 Sb), Southbound
Start time:8th of January 2025, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M73 Northbound Junction 2A on-slip, M73 Junction 3 off-slip & return Southbound.
M73 Southbound Junction 2A to Junction 2 - Nearside lane closure
Location:M73 (S/B Johnston Road O/B to Gartcosh On Slip) to M73 (S/B Gartcosh Int On Ramp to Baillieston Inte
Start time:15th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M73 Southbound Junction 3 to Junction 1- Hard Shoulder Closure
Location:M73 (Mollinsburn O/B to M80 Dbfo Extent) to M73 (Off Slip To M74 Sb to End Of Broken Laneline), Sout
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M73 Southbound Link road to M74 Northbound - total closure
Location:M73 (M73 Jn 1 Off-Slip to End Two-Lane Slip), Southbound
Start time:16th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M73 SB to M74 SB link road, M74 SB Jct 5 off-slip, Raith Rbt, M74 NB Jct 5 on-slip.
M73 Southbound link road to M74 Southbound - Total closure
Location:M73 (Off Slip To M74 Sb to End Of Broken Laneline) to M73 (End Of Broken Lane Line to Merge To M74 S
Start time:22nd of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
M73 Southbound to M74 Northbound link road, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.
M74 J11-9 NB - Lane Closure
Location:M74 (Start Slip On B7078 to Brocketsbrae Underpass) to M74 (Slip From B7078 to B7086 Underpass), Nor
Start time:13th of January 2025, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (30mph)
M74 J12-J10 NB - Lane Closure
Location:M74 (A70 Overbridge to B7078 Underpass) to M74 (End Concrete Section to Slip From B7078), Northbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Parapet Repairs
Traffic Management:
Lane Closure (30mph)
M74 J6 NB off to on - Hard shoulder Closure
Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (A723 Overbridge to Slip On From A723), Northb
Start time:7th of January 2025, 10:00pm
Description:Works:
Landscape Maintenance
Traffic Management:
Hard Shoulder Closure.
M74 J6 NB onslip from Motherwell - HS Running
Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 Overbridge to Slip On From A723), North
Start time:7th of January 2025, 10:00pm
Description:Works:
Landscape Maintenance
Traffic Management:
Single Lane Running.
M74 J9-11 SB - Lane Closure
Location:M74 (B7086 Underpass to Start Of Concrete Section) to M74 (Brocketsbrae Underpass to Slip Off To B70
Start time:13th of January 2025, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Lane Closure (30mph)
M74 Jct 1 onslip SB - Lane Closure
Location:M8 (Slip Off M8 Wb to End Slip ?????) to M74 (2 To 1 Lane to Slip On), Southbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M74 Jct 10 Onslip - Closure
Location:M74 (B7078 Rbt (E) to Entry M74 Sb) to M74 (Slip On From B7078 to Nethan Bridge North), Southbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Structural Repairs
Traffic Management:
Road Closure.
Diversion Information:
Follow B7078 SB to rejoin M74 SB at J12.
M74 Jct 11 to Jct 12 SB - Lane Closure
Location:M74 (B7078 Underpass to A70 Overbridge), Southbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M74 Jct 8 to Jct 9 SB - Lane Closure
Location:M74 (Lochhead O'Bridge to Draffan Underpass), Southbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M74 NB J2 off slip - Slip Closure
Location:M74 (Fullarton Junc to A724 Junc) to M74 (End Of 2-Lane to T-Junction), Northbound
Start time:27th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M74 NB - leave M74 at J1 - turn left Carnoustie St- turn left onto Scotland St- turn left onto Wallace St- turn left and rejoin M74 SB - leave M74 at J2- end
M74 Northbound Junction 5 off-slip - Total closure
Location:M74 (Slip On From A723 to B7012 Underpass) to M74 (M74 Nb Off Slip to B702 Rbt), Northbound
Start time:15th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound, M74 Northbound to M73 Northbound Link Road, A8(M) Baillieston Roundabout, M73 Southbound Junction 2 on-slip, M73 Southbound to M74 Southbound Link Road, M74 Southbound.
M74 Northbound Junction 6 to Junction 3A - Hard Shoulder Closure
Location:M74 (Slip On From A723 to B7012 Underpass) to M74 (M8ppp Boundary to A721 Gantry), Northbound
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M74 Northbound link road to M73 Northbound - total closure
Location:M74 (Mainline 3 To 2 Lane to Blantyre Farm Rd O/B) to M74 (Start Of 2 Lane + Hs to End 2 Lane + Hs),
Start time:21st of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
M74 Northbound, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip
M74 Northbound to M73 Northbound link road - Nearside lane closure
Location:M74 (Start 2-Lane Section to Start Of 2-Lane Slip With Hs) to M73 (Start Of 3-Lane Section to Bailes
Start time:17th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M74 SB J14-J15 - Lane Closure
Location:M74 (Coatsgate Bridge to Moffat Exit Sb) to M74 (A701 Underbridge to Moffat Onslip), Southbound
Start time:23rd of December 2024, 8:00am
Description:Works:
Pothole Repairs
Traffic Management:
Lane Closure.
M74 SB J8 to J10 - Road Closure
Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Slip On From B7078 to Nethan Bridge North), Southb
Start time:30th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
leave M74 jct 8- at rbt take 1st exit onto B7078- at rbt 2nd exit and rejoin M74 at jct 10
M74 SB Jct 6 Off slip Lane Closure
Location:M74 (Start Off Slip to S/B Slp East/Wst Split), Southbound
Start time:10th of January 2025, 10:00pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
M74 Southbound Junction 3A to Junction 6 - Hard Shoulder Closure
Location:M74 (M8ppp Boundary to A721 Gantry) to M74 (B7012 Underpass to A723 Slip Off), Southbound
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Mobile Lane Closures.
M74 Southbound Junction 4 to M73 Northbound - total closure
Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip) to M74 (End Of Slip With Hs to Merge To M73), So
Start time:17th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 Southbound, M74 SB Jct 5 off-slip, Raith Rbt, M74 NB Jct 5 on-slip
M74 Southbound Junction 5 on-slip - Total closure
Location:M74 (B7012 Rbt to Entry M74 Sb) to M74 (B7012 Underpass to A723 Slip Off), Southbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
M74 Junction 5 on-slip Northbound, M74 Northbound to M73 Northbound Link road, M73 Northbound Junction 2 off-slip, Baillieston Rbt, M73 Southbound Junction 2 on-slip, M73 Southbound to M74 Southbound link road.
M74 Southbound main line - Nearside & adjacent lane closure
Location:M74 (Fallside Rd Bridge to B7012 Underpass) to M74 (B7012 Underpass to A723 Slip Off), Southbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Lane Closure.
M74 Southbound to M73 NB - Nearside & Adjacent to total closure
Location:M74 (M8ppp Boundary to A721 Gantry) to M74 (Start Of Dedicated Slip to End Of 1-Lane Slip), Southbou
Start time:10th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 SB, Junction 5 SB Raith SB Off-slip, Raith Rbt, Junction 5 NB On-slip, M74 NB Link road to M73. M73 Northbound.
M74 Southbound to M73 Northbound Link road - Total closure
Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip) to M74 (End Of Slip With Hs to Merge To M73), So
Start time:20th of January 2025, 8:00pm
Description:Works:
Trial hole investigation
Traffic Management:
Road Closure.
Diversion Information:
M74 Southbound, m74 Southbound Junction 5 off-slip, Raith Roundabout, M74 Northbound Junction 5 on-slip.
M74 Southound Junction 6 - Offside & Adjacent lane closure becoming total closure of main line
Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (A723 Slip Off to A723 O'Bridge), Southbound
Start time:9th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M74 SB Jct 6 off-slip to Hamilton, Palace Grounds rbt, M74 Southbound Jct 6 on-slip
M77 NB Jct 1 to M8 Jct 22 - Lane Closure
Location:M77 (B768 Dumbreck Rd Int (N) to Slip Off To M8), Northbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Lane Closure.
M77 NB Jct 5 onslip - Total closure
Location:M77 (Roundabout Maidenhill Interchange to End Of Slip Slip Road) to M77 (Maidenhill Interchange Over
Start time:13th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 NB Jct 5 offslip - A77 Ayr Rd - Crookfur Rd - B7087 - Return M77 Jct 4 NB Onslip
M77 NB Jct 6-5 - Lane Closure
Location:M77 (Cairn Road Underbridge to Maidenhill Interchange Overbridge) to M77 (Maidenhill Interchange Ove
Start time:13th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops
Traffic Management:
Lane Closure.
M77 NB Jct 1 - Road Closure
Location:M77 (B768 Dumbreck Rd Int (S) to B768 Dumbreck Rd Int (N)) to M77 (Off Slip From M8 Wb to Entry To M
Start time:13th of April 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M77 jct at Jct 1- turn left onto Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end
M77 NB Jct 1 to M8 EB Jct 22 Secondary Carriageway- Road Closure
Location:M77 (B768 Dumbreck Rd Int (N) to Slip Off To M8) to M77 (Lhs Slip To M8 to Entry To M8), Northbound
Start time:20th of January 2025, 9:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Continue onto M8, Over Kingston bridge, take J18 City center, continue onto Bothwell St, right turn onto Blythswood St then right onto Waterloo St, Join the M8, take M8 WB J20, left turn onto Wallace St and join the M74 at J1- End
M77 NB Jct 5 - 4 Total closure
Location:M77 (Cairn Road Underbridge to Maidenhill Interchange Overbridge) to M77 (Crookfur Int. to A77 Overb
Start time:13th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Leave M77 NB Jct 5 offslip - A77 Ayr Rd - Crookfur Rd - B7087 - Return M77 Jct 4 NB Onslip
M77 NB Jct1 On Slip - Slip Closure
Location:M77 (N/B Slip Road On To M77 From Dumbreck Road to N/B Slip Road On To M77) to M77 (B768 Dumbreck Rd
Start time:13th of April 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
continue on Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end
SPECIALS TO BE MADE TO CATCH TRAFFIC AT MOSSIDE BOULEVARD.
M77 SB Between Jct 2 & 3 - Road Closure
Location:M77 (B762 Barrhead Rd Int(N) to Barrhead Rd Int (S)) to M77 (Nitshill Rd Int (N) to Nitshill Rd Int
Start time:8th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: Barrhead Rd, Fairchild Ave, End
M77 SB Prior to Jct 2 - Lane closure
Location:M77 (B762 Barrhead Rd Int(N) to Barrhead Rd Int (S)) to M77 (Nitshill Rd Int (N) to Nitshill Rd Int
Start time:8th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
M77 link to M8 NB - Road Closure
Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Rhs Slip To M8 to Entry To M8), Northbound
Start time:13th of April 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M77 jct at Jct 1- turn left onto Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end
M77 link to M8 sec c/way NB- Slip Closure
Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Lhs Slip To M8 to Entry To M8), Northbound
Start time:13th of April 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
leave M77 jct at Jct 1- turn left onto Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end
M8 EB J21 Off Slip to WB Jct 22 - Road Closure
Location:M74 (End Of 2-Lane to Start Of 1-Lane), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Take M74 J1 Off Slip and continue onto Paisley Rd - end
M8 EB Jct 29A Onslip - Total Closure
Location:M8 (A8 Commonside Roundabout to M8 Mainline), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Continue A8 Greenock Rd - 3rd Exit Barnsford Rd - continue A726 go through Next Rbt to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound.
M8 EB Jct 30 Onslip from M898 SB - Total Closure
Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Craigton Int to M898 Entry), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Continue M898 - M8 WB Jct 30 Onslip - Jct 31 offslip - return M8 EB Jct 31 - Junction 30 Craigton – leave M8 by taking slip road to M898 - travel to slip road (1st left) for Erskine – take slip road to roundabout under Erskine Bridge - take 3rd exit onto A726 go under Erskine Bridge to roundabout –take 1st exit onto Barnsford Road - go through several roundabouts to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound.
M8 - EB - Jct 1 to jct 3 - Lane closure
Location:M8 (Livingston Inter. E to Uphall Station Br) to M8 (Gogar Slip Road to Hermiston Roundabout), Eastb
Start time:13th of January 2025, 8:00pm
Description:Works:
Landscape Maintenance
Traffic Management:
Lane Closure.
Diversion Information:
progressive lane closures and hard shoulder closure
M8 - EB - Jct 3 on slip - closure
Location:M8 (Start Eastbound Slip From A899 to A899 O'Bridge (N)) to M8 (Livingston Inter. E to Uphall Statio
Start time:13th of January 2025, 8:30pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Road Closure.
M8 - WB - Jct 1 to jct 3 - Lane closure
Location:M8 (Hermiston Rbt to Sighthill Slip Rd) to M8 (Westbound Slip To A899 to Livingston Int. Slip From A
Start time:13th of January 2025, 8:00pm
Description:Works:
Landscape Maintenance
Traffic Management:
Lane Closure.
Diversion Information:
progressive lane closures and hard shoulder closure
M8 E/B J15 off slip to Stirling Road - Total Closure
Location:M8 (Off Slip M8 Eb to Slip To A803) to M8 (A803 Exit to Entry Eb M8), Eastbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Road Closure.
Diversion Information:
continue on m8 to j14 eb ofslip then turn right onto veiw park avenue and right to rejoin m8 wb and follow to j15 end
M8 E/B J18- J15 - Lane Closures
Location:M8 (A82 Exit to Entry M8 Eb) to M8 (Off Slip To A803 to On Slip From A803), Eastbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 EB Jct 23 on slip from Dumbreck Road - Slip Closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end
M8 EB Jct 24 on slip from Helen Street - Slip Closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue onto Helen st- at rbt take 3rd exit onto Edminston Drive - at rbt take 3rd exit onto Broomloan Rd- at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end
M8 EB Jct 24 to Jct 22 - Lane Closure
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB - JCT 31 off slip - lane closures
Location:M8 (Slip Off To A8 to Slip Entry From A8) to A8 (Slip Off To A8 to A8 Rbt), Eastbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB Between 17 & 16 - Hard Shoulder Closure
Location:M8 (A81 Underpass to Craighall Rd Underpass), Eastbound
Start time:6th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Hard Shoulder Closure.
M8 EB Between 25 and 24 - Hard Shoulder Closure
Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip), Eastbound
Start time:6th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Hard Shoulder Closure.
M8 EB Between Jct 12 - 11 - Hard Shoulder Closure
Location:M8 (Jct 12 Off Slip to Jct 11 On Slip), Eastbound
Start time:20th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Hard Shoulder Closure.
M8 EB Between Jct 13 - 12 - Hard Shoulder Closure
Location:M8 (Off Slip To M80 to Entry From M80), Eastbound
Start time:20th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Hard Shoulder Closure.
M8 EB Between Jct 27 & Jct 26 - Road Closure
Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In
Start time:6th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: A741 Renfrew Rd, A726, A761 Paisley Rd West, A736 Sandwood Rd, Hillington Rd, Hillington Interchange, End
M8 EB Between Jct 28 & 27 - Lane Closure
Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In
Start time:6th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
M8 EB Jct 22 to Jct 20 - Lane 1 Closure
Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M74 (Slip 2-Lane to T-Junction), Eastbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 EB Jct 12 Off slip - Lane Closure
Location:M8 (Slip On From M80 to Off Slip Jct 12) to M8 (Slip Off M8 Eb to Cumbanauld Rd), Eastbound
Start time:8th of January 2025, 10:00pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
M8 EB Jct 20 A814 Off slip -Total Closure
Location:M8 (Slip Off M8 Eb to A814 Entry), Eastbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Cyclic Maintenance, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
A804 North St - St Vincent St - A804 Newton St - Argyle St - End
M8 EB Jct 20 West St On slip -Lane Closure
Location:M8 (Jct Gloucester / West Rd To Start Of Elevated Sect to Start Of Elevated Section) to M8 (Slip Off
Start time:9th of January 2025, 10:00pm
Description:Works:
Cyclic Maintenance, Gully/ironwork repairs
Traffic Management:
Lane Closure.
M8 EB Jct 22 off slip Seaward St - Slip Closure
Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (End Of 2-Lane to Searward St Jn), Eastbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue to M74 and leave at Jct 1a- at Jct turn right- rejoin M74 north- leave M74 at Jct 1- follow directional signs
M8 EB Jct 22 to M74 Jct 1 - Closure
Location:M74 (Start Of M74 to 2 To 3 Lane) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue M8 east- leave M8 at jct 19 Bothwell st- turn left at Pitt st- turn left onto st Vincent st- turn left onto M8 West- leave M8 at jct 20 west st- follow directional signs
M8 EB Jct 23 on slip - Total Closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
Diversion Information:
Dumbrek Rd - M77 Jct 1 NB on slip - Diversion End
M8 EB Jct 24 on slip - Total Closure
Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Road Closure.
Diversion Information:
Helen St - Edminston Dr - Broomloan Rd - Dumbrek Rd - M77 Jct 1 NB onslip - Diversion End
M8 EB Jct 24 to 23 - Lane Closure
Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (Jct 23 Slip Rd Entry to Jct 22 Off Slip), Eastbo
Start time:9th of January 2025, 10:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Lane Closure.
M8 EB Jct 25 - 24 - Lane closure O/S + Adj
Location:M8 (Eb Jct 25 Off Slip to Eb Jct 25 On Slip) to M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip), Eastbo
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works
Traffic Management:
Lane Closure.
M8 EB Jct 25 to Jct 14 Mobile Works
Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip) to M8 (Jct 15 On Slip to Jct 14 Off Slip), Eastbound
Start time:23rd of December 2024, 10:00pm
Description:Works:
Inspections
Traffic Management:
Mobile Lane Closures.
M8 EB Jct 26 off slip - Total Closure
Location:M8 (Slip Off To H.Int to Mid Point H.Int Bridges) to M8 (Slip Off M8 Eb to Hillington Int Rbt), East
Start time:19th of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M8 Jct 27 EB off slip - Arkleston Rd - A741 - A8 Glebe St - A8 Glasgow Rd - Diversion End
M8 EB Jct 26 on slip - Total Closure
Location:M8 (Hillington Int Rbt to Entry M8 Eb) to M8 (Jct 26 Entry Slip to Jct 25 Off Slip), Eastbound
Start time:19th of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
Hillington IC - A736 Hillington Rd - Kings Inch Rd - Old Govan Rd - M8 Jct 25a edn on slip - Diversion end
M8 EB Jct 27 on slip - Total Closure
Location:M8 (A741 Arkleston Rd to Entry M8 Eb), Eastbound
Start time:19th of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M8 Jct 27 EB off slip - Arkleston Rd - A741 - A8 Glebe St - Old Govan Rd M8 Jct 25a EB n slip - Diversion End
M8 EB Jct 27 onslip - Slip Closure
Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In
Start time:6th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: A741 Renfrew Rd, A726, A761 Paisley Rd West, A736 Sandwood Rd, Hillington Rd, Hillington Interchange, End
M8 EB Jct 27 to 26 - Total Closure
Location:M8 (A741 Renfrew Rd O'Br to Slip Rd Off M8 Eb) to M8 (Jct 26 Entry Slip to Jct 25 Off Slip), Eastbou
Start time:19th of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M8 Jct 27 EB off slip - Arkleston Rd - A741 - A8 Glebe St - Old Govan Rd M8 Jct 25a EB n slip - Diversion End
M8 EB Jct 28 onslip - Slip Closure
Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In
Start time:6th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: A741 Renfrew Rd, A726, A761 Paisley Rd West, A736 Sandwood Rd, Hillington Rd, Hillington Interchange, End
M8 EB Jct 30-29 St James IC Total Closure
Location:M8 (Slip To M898 to Craigton Int Underpass) to M8 (Slip Rd Off M8 Eb to Mid Point A737 Bridges), Eas
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Closure M8 Junction 30 Craigton – leave M8 by taking slip road to M898 - travel to slip road (1st left) for Erskine – take slip road to roundabout under Erskine Bridge - take 3rd exit onto A726 go under Erskine Bridge to roundabout –take 1st exit onto Barnsford Road - go through several roundabouts to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound. TRO 3714347
M8 EB Second carriageway from M77 to M74 - Total Closure
Location:M77 (Lhs Slip To M8 to Entry To M8) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound
Start time:20th of January 2025, 9:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Continue onto M8, Over Kingston bridge, take J18 City center, continue onto Bothwell St, right turn onto Blythswood St then right onto Waterloo St, Join the M8, take M8 WB J20, left turn onto Wallace St and join the M74 at J1- End
M8 EB Slip to Second carriageway - Total Closure
Location:M8 (M77 Int Off Slip to M77 Int On Slip) to M77 (Lhs Slip To M8 to Entry To M8), Eastbound
Start time:20th of January 2025, 9:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Continue onto M8, Over Kingston bridge, take J18 City center, continue onto Bothwell St, right turn onto Blythswood St then right onto Waterloo St, Join the M8, take M8 WB J20, left turn onto Wallace St and join the M74 at J1- End
M8 Eastbound Eurocentral to Chapelhall - Nearside lane closure
Location:A8 (Chapelhall Overbridge to Eurocentral Overbridge), Eastbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 Eastbound Junction 10 to Junction 6- Hard Shoulder Closure
Location:M8 (End Of Nosing to Jnct 10 On Slip (Nosing)) to M8 (End Of Ppp to Duntilland Road), Eastbound
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M8 Eastbound Junction 6 on-slip - Total closure
Location:M8 (A73 Newhouse Rbt to On To M8 Eb), Eastbound
Start time:8th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
A8 Westbound Newhouse on-slip, A8 Chapelhall South Rbt, A8 Chapelhall North rbt, A8 Eastbound,
M8 Eastbound Junction 6A off-slip - total closure
Location:A8 (Chapelhall Overbridge to Eurocentral Overbridge) to A8 (Start Chapelhall Eb Off Slip to Start 2
Start time:20th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M8 Eastbound Junction 5 off-slip, M8 Westbound Junction 5 on-slip.
M8 Eastbound Junction 8 Baillieston on-slip - Total closure
Location:A8 (Bailleston Rbt to Entry A8 Eb) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Eastbound
Start time:22nd of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Road Closure.
Diversion Information:
A8(M) Baillieston Roundabout, Swinton roundabout, Bargeddie Roundabout, A8 Eastbound.
M8 Eastbound Junction 9 to Junction 8 - Nearside lane closure
Location:M8 (Slip Off Jct 9 to Railway Bridge) to M8 (Slip From M8 Eb to Slip To M8), Eastbound
Start time:12th of January 2025, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M8 Eastbound to M73 Southbound link road - Total closure
Location:M8 (Slip Off Jct 9 to Railway Bridge) to M8 (Slip Off M8 Eb to Entry M73), Eastbound
Start time:14th of January 2025, 8:00pm
Description:Works:
Inspections
Traffic Management:
Road Closure.
Diversion Information:
M8 Eastbound Junctio n7 Eurocentral off-slip, Eurocentral North Rbt, Eurocentral South Rbt, M8 Westbound.
M8 J12 WB onslip - Slip Closure
Location:M8 (Cumbanauld Rd to 2 Way Slip) to M8 (Jct 12 Wb On Slip to Off Slip To M80), Westbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Inspections: Infrastructure / Assets
Traffic Management:
Road Closure.
Diversion Information:
Join M8 Eastbound at J12 follow to leave at J11 EB offslip turn RIGHT then RIGHT to join M8 WB at J11 onslip.
M8 J18 EB Off slip to A804 - Total Closure
Location:M8 (Jct 19 On Slip to Sauchiehall O'Br) to M8 (Jct 18 Eb Off Slip to St Georges Rd Jct), Eastbound
Start time:16th of January 2025, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Continue on M8 EB – M8 Jct 15 EB off slip – left onto Baird St – Left to rejoin A803 SB – M8 Jct 15 WB on slip - M8 J16 EB off slip - continue on A804 Dobbie's loan - A81 Garscube road - left on St Georges road - right onto A82 GWR - diversion ends
M8 J18 EB Off slip to A82 - Total Closure
Location:M8 (Jct 19 On Slip to Sauchiehall O'Br) to M8 (Jct 18 Off Slip to Entry A82), Eastbound
Start time:16th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
Continue on M8 EB – M8 Jct 15 EB off slip – left onto Baird St – Left to rejoin A803 SB – M8 Jct 15 WB on slip - M8 J16 EB off slip - continue on A804 Dobbie's loan - A81 Garscube road - left on St Georges road - right onto A82 GWR - diversion ends
M8 J19 EB on slip from North Street - Total closure
Location:M8 (Slip Off M8 Eb to Bothwell St) to M8 (Start On Slip to Entry M8 Eb), Eastbound
Start time:16th of January 2025, 8:00pm
Description:Works:
Utility Works
Traffic Management:
Road Closure.
Diversion Information:
continue on A804 North St - A804 St Georges road - A81 Garscube road - A804 Dobbie loan - back on m8 EB at J16 Craighall - diversion ends
M8 J22 Off Slip to Seaward Street EB - Slip Closure
Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (End Of 2-Lane to Searward St Jn), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Take M74 J1 Off Slip and continue onto Paisley Rd - end
M8 J23 EB - Lane Closure
Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Lane Closure.
M8 J23 EB On Slip - Total Closure
Location:M8 (B768 Dumbrek Rd to Entry M8 Eb) to M8 (A8 O'Bridge to Jct 23 Slip Rd Entry), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via:
Dumbreck Rd, M77 Jct 1 NB On slip, End
M8 Jct 13 to 14 EB - Lane Closure
Location:M8 (Jct 14 Off Slip to Off Slip To M80) to M8 (Off Slip To M80 to Entry From M80), Eastbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 Jct 13 to 14 WB - Lane Closure
Location:M8 (Off Slip To M80 to Entry From M80) to M8 (On Slip From M80 to Jct 14 Off Slip), Westbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 Jct 14 - Jct 13 EB - Lane Closure
Location:M8 (Jct 15 On Slip to Jct 14 Off Slip) to M8 (Jct 14 Off Slip to Off Slip To M80), Eastbound
Start time:9th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 Jct 17 to Jct 16 EB - Lane Closure
Location:M8 (Craighall Rd to Entry M8 Eb), Eastbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 Jct 2 EB off-slip to M9 Jct 1 WB. Road Closure.
Location:M8 (Jct Off From M8 to East Of Claylands Jct) to M9 (End Of 4 Lane Eb to 2 Lane Dual), Westbound
Start time:14th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Continue M8 EB to M8 Jct 1 Hermiston Gait. Take exit to A720 WB to Gogar Roundabout then take 1st exit onto A8 to Newbridge.
M8 Jct 2 WB off-slip to M9 Jct 1 WB. Road Closure.
Location:M8 (Freelands Rd Br. to Wb Slip To Newbridge) to M8 (Start Nb Off Slip To Newbridge to End Of M8 Eb
Start time:14th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Continue M8 WB to M8 Jct 3 off-slip. Take 4th exit on Livingston Roundabout onto A899 then 3rd exit at Dechmont Roundabout onto A89 continuing to Newbridge.
M8 Jct 29 Offslip - Total Closure
Location:M8 (Slip Off M8 Eb to A737 Rbt), Eastbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs
Traffic Management:
Road Closure.
Diversion Information:
Closure M8 Junction 30 Craigton – leave M8 by taking slip road to M898 - travel to slip road (1st left) for Erskine – take slip road to roundabout under Erskine Bridge - take 3rd exit onto A726 go under Erskine Bridge to roundabout –take 1st exit onto Barnsford Road - go through several roundabouts to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound.
M8 Jct 3 WB Onslip - Road Closure
Location:M8 (A899 Rbt to Start Eastbound Slip From A899) to M8 (Westbound Slip To A899 to Livingston Int. Sli
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4
M8 Jct 3-4 WB Road Closure
Location:M8 (Westbound Slip To A899 to Livingston Int. Slip From A899) to M8 (East Whitburn Junction (East) t
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4
M8 Jct 3A WB Onslip - Road Closure
Location:M8 (A779 Rbt (S) to On Slip To M8), Westbound
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A779, A7066, A801 and rejoin M8 westbound at Jct 4
M8 Jct 3A WB Onslip - Road Closure
Location:M8 (Starlaw Bridge to Easter Inch Footbridge) to M8 (Off Slip to A779 Rbt (S)), Westbound
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4
M8 Jct 4 - Jct 5 - EB. Road Closure
Location:M8 (Duntilland Rd C73 to B7057 U'Bridge) to M8 (Council Boundary to A706 Bridge), Eastbound
Start time:16th of January 2025, 8:30pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
WB traffic will be diverted off at Jct 5 WB slip and directed onto the B7057. Traffic will be directed to turn left onto the B7066. Traffic will continue on the B7066 until directed to go straight ahead at the 4 roundabouts at Heartlands Services. Traffic will then be directed to re-join the M8 WB carriageway at Jct 4a.
M8 Jct 4 - Jct 5 - WB. Road Closure
Location:M8 (A706 Bridge to Council Bdy) to M8 (Council Bdy to B7057 U'Bridge), Westbound
Start time:13th of January 2025, 8:30pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
WB traffic will be diverted off at Jct 4A and directed to the first exit at the roundabout and past the Services, taking the 2nd junction at the next 2 roundabouts. At the next roundabout, traffic will take the 3rd exit onto the B7066. Traffic will continue along the B7066 through Harthill until being directed to take the right-hand junction onto the B7057. Traffic will then take the slip road back onto the M8 west bound carriageway at Jct 5.
M8 Jct 4 WB Off slip - Road Closure
Location:M8 (Riddoch Hill Footbridge to East Whitburn Junction (East)) to M8 (Slip To A801 to A801 Rbt), West
Start time:8th of January 2025, 8:30pm
Description:Works:
Resurfacing
Traffic Management:
Road Closure.
Diversion Information:
.A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4
M8 Sec c/way EB onto M74 SB - Lane Closure
Location:M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry) to M74 (Start Of 3 Lanes to Polmadie Junc), Eastbound
Start time:6th of January 2025, 8:00pm
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M8 W/B J15 - J18 Lane Closure
Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (Wb Off Slip to Wb Entry Slip), Westbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 WB J15 on slip from Springburn Expressway - Slip Closure
Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (M8 Overbridge to Entry M8 Wb), Westbound
Start time:1st of September 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue A803 - at jct turn right onto Castle St - continue Alexandria Parade- turn left onto Alexandria Park St - join M8 WB at J14 end
M8 WB - Lane Closure - Eastfield
Location:M8 (B7057 U'Bridge to Duntilland Rd), Westbound
Start time:14th of January 2025, 12:01am
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 WB - Lane Closure - Salsburgh
Location:M8 (Duntilland Road to End Of Se Unit), Westbound
Start time:14th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M8 WB 11 On Slip - Total Closure
Location:M8 (Start Wb On Slip Junction 11 to End Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off
Start time:8th of January 2025, 10:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
North Follow Diversion B765 Ave End Rd - Gartloch rd - A80 Join M8 WB Jct 12 On slip South B765 Stepps Rd - A8 Edinburgh Rd - Cumbernauld Rd - Join M8 Jct 12 on slip
M8 WB J15 to J16 - Lane Closure
Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (Jct 16 Wb Off Slip to Slip To Craighall Rd), Westbound
Start time:1st of September 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 WB Jct 11 Onslip - Slip Closures
Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off Slip), We
Start time:22nd of January 2025, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: M8 EB, M8 Jct 10 EB Off slip, Westerhouse Rd, M8 WB Jct 10 On Slip, End
M8 WB Jct 11 to 12 - Lane Closures
Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 12 Off Slip to Jct 12 Entry Slip),
Start time:8th of January 2025, 10:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M8 WB Jct 12 Off Slip Total Closure
Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (Cumbanauld Rd to 2 Way Slip), Westbound
Start time:8th of January 2025, 10:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
Follow Diversion M8 WB Exit Jct 13 - Turn Provan Rd - Join M8 EB - exit Jct 12 EB offslip
M8 WB Jct 12 Onslip - Slip Closure
Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (Jct 12 Wb On Slip to Off Slip To M80), Westbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Diversion Via: Gartloch Rd, Ave End Rd, Stepps Rd, M8 Jct 11 WB On Slip, End
M8 WB Jct 12 to Jct 13 - Lane Closure
Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (Jct 12 Wb On Slip to Off Slip To M80), Westbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
M8 WB Jct 14 to Jct 25 Mobile Works
Location:M8 (On Slip Jct 14 to Off Slip Jct 15) to M8 (Jct 25 Off Slip to A739 Rbt), Westbound
Start time:23rd of December 2024, 10:00pm
Description:Works:
Inspections
Traffic Management:
Mobile Lane Closures.
M8 WB Jct 15 Off slip to Stirling Road - Hard Shoulder Closure
Location:M8 (On Slip Jct 14 to Off Slip Jct 15) to M8 (Jct 15 Off Slip to Stirling Rd Jct), Westbound
Start time:13th of January 2025, 8:00am
Description:Works:
Third Party Works
Traffic Management:
Hard Shoulder Closure.
M8 WB Jct 22 Seward Street- Slip Closure
Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Westbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
circle Rbt and take 2nd exit onto Scotland st- turn left onto Carnoustie st- rejoin M8 sec c/way east - end
M8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure
Location:M74 (Start Ded. Lane to M8 & M77 Split) to M77 (Off Slip From M8 Wb to Entry To M77 Sb), Westbound
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 WB Jct 25 on slip - Total closure
Location:M8 (Jct 25 Off Slip to A739 Rbt) to M8 (A739 Exit to Entry M8 Wb), Westbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - M8 Jct 26 WB on slip - Diversion end
M8 WB Jct 25 to 26 - Total closure
Location:M8 (Wb Jct 25 Off Slip to Wb Jct 25 On Slip) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Sli
Start time:21st of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
M8 EB Jct 26 off slip - A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - M8 Jct 26 WB on slip - Diversion end
M8 WB Jct 25a off slip - Total closure
Location:M8 (Jct 25 Wb On Slip to Jct 26 Off Slip) to M8 (W/B Off Slip From M8 to Braehead Rbt), Westbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - Kings Inch Rd - - Diversion end
M8 WB Jct 26 off slip - Total closure
Location:M8 (Jct 25 Wb On Slip to Jct 26 Off Slip) to M8 (Slip Off M8 Wb to Hillington Int Rbt), Westbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Inspections: Structures
Traffic Management:
Road Closure.
Diversion Information:
A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - Diversion end
M8 WB Jct 26 on slip from Hillington IC - Slip Closure
Location:M8 (Hillington Int Rbt to Entry M8 Wb) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), We
Start time:2nd of July 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Road Closure.
Diversion Information:
continue onto Hillington road- at roundabout take 1st exit onto Glasgow rd- rbt 2nd exit onto Glebe st- jct turn left onto A741 Paisley rd- rbt take 2nd exit- end
M8 WB Jct 31 to A8 Greenock Rd - Lane Closures
Location:M8 (Slip From M8 Wb to Slip Entry From A8) to A8 (Woodhall Rbt to Newark Rbt), Westbound
Start time:6th of January 2025, 9:30am
Description:Works:
Cyclic Maintenance
Traffic Management:
Lane Closure.
M8 WB at Jct 11 - Lane Closures
Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off Slip), We
Start time:22nd of January 2025, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Lane Closure.
M8 WB between Jct 30 and Jct 31 - Lane Closures
Location:M8 (Slip From M898 to Slip Off To Ferry Int), Westbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M8 WB onslip from J31 - Lane Closure
Location:A8 (West Ferry Toll Rbt to Slip On To A8), Westbound
Start time:9th of May 2025, 8:00pm
Description:Works:
Grass Cutting
Traffic Management:
Lane Closure.
M8 Westbound Junction 10 off-slip - Nearside lane closure becoming total closure of slip road
Location:M8 (Wb Off Slip Junction 10 to Wb On Slip Junction 10) to M8 (Start Wb Off Slip Junction 10 to End W
Start time:7th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Road Closure.
Diversion Information:
M8 Westbound Junction 11 off-slip, M8 Eastbound Junction 11 on-slip
M8 Westbound Junction 6 to Junction 10 - Hard Shoulder Closure
Location:M8 (Duntilland Road to End Of Se Unit) to M8 (Wb On Slip Junction 10 to Wb Off Slip Junction 11), We
Start time:1st of January 2025, 12:00am
Description:Works:
Cyclic Maintenance
Traffic Management:
Hard Shoulder Closure.
M8 Westbound Junction 7A to Junction 8 - Nearside lane closure
Location:A725 (Start 2 Lane to Diamond Int. O/B) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westb
Start time:6th of January 2025, 8:00pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M8 Westbound Junction 7A to Junction 8 - Nearside lane closure
Location:A725 (Start 2 Lane to Diamond Int. O/B) to A8 (Shawhead Overbridge to Bargeddie), Westbound
Start time:19th of January 2025, 8:00pm
Description:Works:
Lighting Works
Traffic Management:
Lane Closure.
M80 - NB - Junction 8 to 9 - Lane Closures
Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Northfield Underpass to Foot Green O'Br
Start time:20th of January 2025, 7:00pm
Description:Works:
Filter Drain
Traffic Management:
Lane Closure (50mph)
M80 - SB - Denny - Hard shoulder closure
Location:M80 (Dunipace O'Bridge to Slip Off To M876), Southbound
Start time:20th of January 2025, 9:30am
Description:Works:
Third Party Works
Traffic Management:
Hard Shoulder Closure.
M80 J1 to M80 WB - Lane Closure
Location:M80 (M80 Sb Off Slip to M8 Entry) to M8 (On Slip From M80 to Jct 14 Off Slip), Southbound
Start time:6th of January 2025, 10:00pm
Description:Works:
Inspections: Infrastructure / Assets
Traffic Management:
Lane Closure.
M876 - WB - Jct 1 - Slip closure
Location:M876 (A9 O'Bridge N Broomage to River Carron O'Br) to M876 (Off Slip To Denovan Rd to Denovan Rd T-J
Start time:6th of January 2025, 8:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Drivers continue to m80 jct 7 and return to jct 1 EB
M876 SB - Lane Closure - Bonnybridge
Location:M876 (River Carron O'Br to M876 Jct Bankhead), Southbound
Start time:17th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M876 WB - Lane Closure - Near to Airth
Location:A876 (Higgins Neuk Rbt to Bowtrees Int), Westbound
Start time:13th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M9 - EB - Linlithgow Loch - Lane Closure
Location:M9 (B8029 Bridge to A706 Bridge) to M9 (Bonnytoun Farm to Coal Road), Eastbound
Start time:8th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
M9 - NB - Jct 3 to Jct 4 - Hard shoulder closure
Location:M9 (River Avon Bridge to Sandy Ford) to M9 (Avonbank to E Br. Lathallan), Northbound
Start time:5th of May 2025, 8:00pm
Description:Works:
Sign Installation/Repairs
Traffic Management:
Hard Shoulder Closure.
M9 - WB - Linlithgow Loch - Lane Closure
Location:M9 (Coal Road to Bonnytoun Farm) to M9 (A706 Bridge to B8029 Bridge), Westbound
Start time:8th of January 2025, 7:30pm
Description:Works:
Drainage Works
Traffic Management:
Lane Closure.
M9 Jct 1 EB on-slip to M8. Road Closure.
Location:M9 (Start Dedicated Slip From A8 Wb to End Dedicated Slip From A8 Wb) to M8 (End Newbridge Sb On Sli
Start time:13th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Continue A89 to Dechmont Roundabout. Take 2nd exit onto A899 then take 3rd exit at Livingston Roundabout to join M8 at Jct 3 WB on-slip.
M9 Jct 1 WB off-slip. Road Closure.
Location:M9 (Start Of Newbridge Nb Off Slip to End On Slip From Newbridge Rbt) to M9 (Start Off M8 Nb Off Sli
Start time:14th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Continue M8 EB to M8 Jct 1 Hermiston Gait. Take exit to A720 WB to Gogar Roundabout then take 1st exit onto A8 to Newbridge.
M9 Jct 1A to M8 Jct 2 WB. Road Closure.
Location:M9 (B9080 Bridge to Overton Under Bridge) to M8 (W Of Claylands to Almond Bridge), Eastbound
Start time:13th of January 2025, 10:00pm
Description:Works:
Third Party Works
Traffic Management:
Road Closure.
Diversion Information:
Take M9 EB Jct 1A off-slip to M90 NB. Take M90 Jct 1A off-slip and return SB on-slip to M9 Jct 1A then take M9 EB Jct 1 off-slip to Newbridge.
Those travelling onwards to the M8 should take the 4th exit to A89 to Dechmont roundabout then take 1st exit onto A899 to Livingston roundabout and M8.
M9 Jct 5 WB off-slip. Road Closure.
Location:M9 (Slip To Lathallan Int to Start Eastbound Slip From A801) to M9 (Off Slip To A905 to A905 Cadgers
Start time:30th of December 2024, 7:30pm
Description:Works:
Landscape Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Follow M9 WB to Jct 7. Take off-slip to M876 and follow to Jct 3. Turn and return to M9 EB Jct 6 off-slip.
M9 Jct 5 WB on-slip. Road Closure
Location:M9 (A905 Cadgers Brae Rbt to Slip On To M9) to M9 (W. Br. Cadger's Brae to E. Br. Earlsgate), Westbo
Start time:6th of January 2025, 7:30pm
Description:Works:
Landscape Maintenance
Traffic Management:
Road Closure.
Diversion Information:
Follow M9 WB from Jct 5 to Jct 4 off-slip. Turn and return on M9 EB.
M9 WB Junction 9 to Junction 10
Location:M9 (C4 O'Bridge Cambusbarron to A84 O'Bridge Craigforth), Westbound
Start time:3rd of January 2025, 7:30pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M90 - NB - Queensferry Crossing - Lane Closure
Location:Off Network to Off Network, Northbound
Start time:11th of January 2025, 8:00pm
Description:Works:
Bridge Joint Repairs
Traffic Management:
Lane Closure.
M90 - SB - J1c - on slip closure
Location:A90 (Admiralty Jn Rbt to Entry Slip), Southbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
Continue on A985 WB to King's Road Roundabout. Take 3rd exit onto B980 NB to Pitreavie Roundabout. Take 3rd exit onto A823(M) EB joining M90 Jct 2 SB on-slip.
M90 - SB - 1B - off slip closure
Location:A90 (Ferrytoll Jn U/B to End Of A90 (Admiralty)) to A90 (Start Of A90 (Admiralty) to Ferrytoll Jn U/
Start time:21st of January 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
Diversion Information:
Continue M90 SB over Queensferry Crossing and take M90 SB Jct 1A off-slip. Take 4th exit and return M90 NB Jct 1A on-slip to M90 Jct 1B.
M90 - SB - 1C to 1B - Lane closure
Location:M90 (S/B Off Slip To A985 to S/B On Slip From A985) to A90 (Frb to Ferrytoll Jn Ub), Southbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Road Closure.
M90 - SB - jct 1a to jct 1 - lane closure
Location:Off Network to M90 (Starts Of Chevron to Farm Rd O/B), Southbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Lane Closure.
M90 - SB - south of J2a - Lane closure
Location:M90 (S0s Telephone E5 to S0s Telephone E4), Southbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Lane Closure.
M90 Arlary, Milnathort. SB - Lane closure
Location:M90 (Glenfarg Overbridge to Start Concrete Sb) to M90 (Start Concrete Sb to Slip From A91), Southbou
Start time:10th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M90 Friarton Bridge NB - Lane clsoure
Location:M90 (Scoonieburn O'Bridge to Off Slip To A90) to M90 (Slip Rd Off to Start A90), Northbound
Start time:8th of January 2025, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M90 Friarton Bridge- Lane Closure S/B
Location:M90 (On Slip From A90 to Scconieburn O'Bridge), Southbound
Start time:23rd of December 2024, 9:30am
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
M90 Kelty SB - Lane closure
Location:M90 (P&Kc/Fc Boundary to S/B Off Slip To A909), Southbound
Start time:7th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M90 Kinross Off Slip NB - Lane closure
Location:M90 (Start Off Slip To A977 to A977 Rbt), Northbound
Start time:6th of January 2025, 7:30pm
Description:Works:
Gully/ironwork repairs
Traffic Management:
Lane Closure.
M90 NB - Hard Shoulder Closure - North Rosyth
Location:M90 (Off Slip To A985 to Mastertown O'Bridge) to M823 (M90 Off Slip (S) to Entry M823), Northbound
Start time:15th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Hard Shoulder Closure.
M90 NB Kelty Off slip JCT 4 - Lane closure
Location:M90 (Off Slip To A909/B914 to Junction A909/B914), Northbound
Start time:7th of January 2025, 8:00pm
Description:Works:
Barrier Repair
Traffic Management:
Lane Closure.
M90 NB jct 1a Lane closure
Location:M90 (Railway Bridge to Farm Overbridge) to Off Network, Northbound
Start time:21st of January 2025, 8:00pm
Description:Works:
Gantry Works
Traffic Management:
Lane Closure.
M90 South of Glenfarg SB - Lane closure
Location:M90 (Glenfarg Overbridge to Start Concrete Sb), Southbound
Start time:6th of January 2025, 7:30pm
Description:Works:
Carriageway Patching
Traffic Management:
Lane Closure.
Seaward Street - Lane Closure
Location:M74 (Roundabout to Start Of 1-Lane) to M74 (2 To 3 Lane to 3 To 2 Lane), Northbound
Start time:20th of January 2025, 8:00pm
Description:Works:
Lining Works, Traffic Loops
Traffic Management:
Lane Closure.