Home Traffic Information Planned Roadworks

Planned Roadworks

You'll find more information on planned roadworks on Scotland's trunk roads below. Alternatively you can view them on our map

A1 carriageway, linking the A1 to Dunglass Road, near the Railway bridge at Bilsdean

Location:A1 (Dunglass Bridge to U220 Bilsdean), Northbound

Start time:1st of January 2025, 6:00am

Description:Works:
Third Party Works

Traffic Management:
Road Narrowing (Two Way Working).

A7 - NB - South of Fiddleton - Closure

Location:A7 (Meikledale Farm to Jct Unthank), Northbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.

A7 - SB - South of Fiddleton - Closure

Location:A7 (Meikledale Farm to Jct Unthank), Southbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.

A1 - Thistly cross - temp lights

Location:A1 (Thistly Cross Roundabout to Spott Road Roundabout), Southbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A1 - Thistlycross RBT - Lane closure

Location:A1 (Thistly Cross Roundabout to Thistly Cross Roundabout), Eastbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Lighting Works

Traffic Management:
Lane Closure.

A1 N/B Cockburnspath Roundabout. Temporary Traffic Lights.

Location:A1 (C130 Cockburnspath to Cockburnspath Rbt) to A1 (Cockburnspath Rbt to Dunglass Bridge), Northboun

Start time:23rd of December 2024, 8:00am

Description:Works:
Kerbing Works

Traffic Management:
Road Narrowing (Two Way Working).

A1 NB Ayton - Contraflow

Location:A1 (Jct A1107 Burnmouth to Jct. Ayton(South)), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Contraflow (30mph)

A1 NB Reston. Lane Closure.

Location:A1 (B6438 Reston to Start Dual Cway Lemington) to A1 (Start Dual Lemington to B6437 Junction), North

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A1 S/B Cockburnspath Roundabout. Temporary Traffic Lights.

Location:A1 (Cockburnspath Rbt to Dunglass Bridge) to A1 (C130 Cockburnspath to Cockburnspath Rbt), Southboun

Start time:23rd of December 2024, 8:00am

Description:Works:
Kerbing Works

Traffic Management:
Road Narrowing (Two Way Working).

A1 SB - TTL - Eyemouth

Location:A1 (Jct. Ayton(South) to Jct (R) Redhall), Southbound

Start time:16th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A1 SB Ayton. Contraflow.

Location:A1 (Jct A1107 Burnmouth to Jct. Ayton(South)), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Contraflow (30mph)

A6091 - NB - Melrose - Temp Lights

Location:A6091 (B6374 Jct to B6361 Jct) to A6091 (Borders Gen Hosp to B6374 Jct), Northbound

Start time:3rd of February 2025, 8:00am

Description:Works:
Footway Works

Traffic Management:
Portable Traffic Lights (TTLS).

A6091 - SB - Melrose - Temp Lights

Location:A6091 (Borders Gen Hosp to B6374 Jct) to A6091 (B6374 Jct to B6361 Jct), Southbound

Start time:3rd of February 2025, 8:00am

Description:Works:
Footway Works

Traffic Management:
Portable Traffic Lights (TTLS).

A68 - NB - Lauder High Street -TTL

Location:A68 (Factor/S Park to Mid Row) to A68 (Harryburn to C85 Newmills), Northbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Pavement Surveys

Traffic Management:
Portable Traffic Lights (TTLS).

A68 - NB - Liliarsedge - temp lights

Location:A68 (C66 Sandystones to C52 Longnewton), Northbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A68 - NB - North of Pathhead / A6196 Rd Junction - Closure

Location:A68 (End Of S/B Climbing to A6124 Jct) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), Northbound

Start time:27th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
NB traffic to exit A68 at Pathhead onto Edgehead Rd to A6106, turn right onto A6094, rejoining A68 at Salters Road Junction.

A68 - SB - Lauder High Street - TTL

Location:A68 (Harryburn to C85 Newmills) to A68 (Factor/S Park to Mid Row), Southbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Pavement Surveys

Traffic Management:
Portable Traffic Lights (TTLS).

A68 - SB - Liliarsedge - temp lights

Location:A68 (C66 Sandystones to C52 Longnewton), Southbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A68 NB at B6414. Contraflow.

Location:A68 (A6093 Oxenford to End Of Sb Climbing Lane) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), N

Start time:20th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Contraflow.

A68 NB at B6414. Portable Traffic Lights.

Location:A68 (A6093 Oxenford to End Of Sb Climbing Lane) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), N

Start time:15th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A68 SB at B6414 Junction. Portable Traffic Lights.

Location:A68 (A6124 Fordel Jct to A6094 Salters Rd Jct) to A68 (A6093 Oxenford to End Of Sb Climbing Lane), S

Start time:15th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A68 SB at B6414. Contraflow.

Location:A68 (A6093 Oxenford to End Of Sb Climbing Lane) to A68 (A6124 Fordel Jct to A6094 Salters Rd Jct), S

Start time:20th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Contraflow.

A7 - N/B - Galalaw Roundabout - Temporary Traffic Lights

Location:A7 (B6359 Appletreehall to Galalaw Rbt) to A7 (Galalaw Rbt to Boonraw), Northbound

Start time:7th of April 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - NB - Albert Road, Hawick - Temp Lights

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Northbound

Start time:20th of January 2025, 8:00am

Description:Works:
Kerbing Works, Pedestrian Crossing works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - NB - Galashiels - TEMP Traffic lights

Location:A7 (Netherbarns to A6091 Rbt), Northbound

Start time:13th of January 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - NB - South of Hawick - closure

Location:A7 (Southfield to B711 Roberton), Northbound

Start time:23rd of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.

A7 - S/B - Galalaw Roundabout - Temporary Traffic Lights

Location:A7 (Galalaw Rbt to Boonraw) to A7 (B6359 Appletreehall to Galalaw Rbt), Southbound

Start time:7th of April 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - SB - Albert Road, Hawick - Temp Lights

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Southbound

Start time:20th of January 2025, 8:00am

Description:Works:
Kerbing Works, Pedestrian Crossing works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - SB - Commercial Road Hawick - Closure

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt) to A7 (Sandbed Rbt to Sandbed Rbt), Southbound

Start time:3rd of February 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:

The A7 Southbound will also be closed at Hawick with a signed diversion in place between Dovemount/ N Bridge Roundabout and Sandbed Roundabout. Road users are to follow Mart St and then B6399 to rejoin the A7 at Sandbed Roundabout. "

A7 - SB - Galashiels - TEMP Traffic lights

Location:A7 (Netherbarns to A6091 Rbt), Southbound

Start time:13th of January 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A7 - SB - South of Hawick - closure

Location:A7 (Southfield to B711 Roberton), Southbound

Start time:23rd of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
The A7 will be closed in both directions with a signed diversion in place between Canonbie and Hawick.
Road users are to follow the B7201, B6357 to Bonchester Bridge, A6088 and A698 to rejoin the A7 at Hawick, and vice-versa for southbound traffic.

A7 NB Hawick. Portable Traffic Lights

Location:A7 (B711 Roberton to 30mph/S Wilton Lodge Br) to A7 (30mph/S Wilton Lodge Br to Buccleuch Place), No

Start time:23rd of December 2024, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 NB Selkirk. Portable Traffic Lights

Location:A7 (A699 St.Boswells to Hill Street), Northbound

Start time:7th of January 2025, 7:00am

Description:Works:
Footway Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 NB north of Langholm. Portable Traffic Lights

Location:A7 (Jct Hoghill Fm to Kirkstile Br.), Northbound

Start time:16th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 SB Hawick. Portable Traffic Lights

Location:A7 (B711 Roberton to 30mph/S Wilton Lodge Br) to A7 (30mph/S Wilton Lodge Br to Buccleuch Place), So

Start time:23rd of December 2024, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 SB Selkirk. Portable Traffic Lights

Location:A7 (A699 St.Boswells to Hill Street), Southbound

Start time:7th of January 2025, 7:00am

Description:Works:
Footway Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7 SB north of Langholm. Portable Traffic Lights

Location:A7 (Jct Hoghill Fm to Kirkstile Br.), Southbound

Start time:16th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7- NB - Hawick Commercial Road - Temp lights

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Footway Works, Kerbing Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7- SB - Hawick Commercial Road - Temp lights

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Footway Works, Kerbing Works

Traffic Management:
Portable Traffic Lights (TTLS).

A7-NB-Langholm- Temporary Traffic Lights

Location:A7 (B6318 Skipper/S Br to Rhs Jct Langholm) to A7 (B709 Jct to Jct Holmhead), Northbound

Start time:20th of January 2025, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A7-SB-Langholm- Temporary Traffic Lights

Location:A7 (B709 Jct to Jct Holmhead) to A7 (B6318 Skipper/S Br to Rhs Jct Langholm), Southbound

Start time:20th of January 2025, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A701 NB Blackacre - TTL's

Location:A701 (Jct Garrel to Jct Hartfield), Northbound

Start time:13th of January 2025, 9:30am

Description:Works:
Structural Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A701 NB South of Beattock - Stop/Go Boards

Location:A701 (B7076 Junction to Beattock West Rbt), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Stop/Go Boards Traffic Control.

A701 SB South of Beattock - Stop/Go Boards

Location:A701 (B7076 Junction to Beattock West Rbt), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Stop/Go Boards Traffic Control.

A701 Tinwald Downs NB TTL's

Location:A701 (A75 Edinburgh Rd Rbt to Tinwald Downs Rd Rbt) to A701 (Tinwald Downs Rbt to Jct (L) C4 Quarry

Start time:13th of January 2025, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A701 Tinwald Downs Rd (Council Network) - TTL's

Location:A701 (Tinwald Downs Rbt to Tinwald Downs Rbt), Westbound

Start time:13th of January 2025, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A701 Tinwald Downs SB TTL's

Location:A701 (Tinwald Downs Rbt to Jct (L) C4 Quarry Road) to A701 (A75 Edinburgh Rd Rbt to Tinwald Downs Rd

Start time:13th of January 2025, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - NB -Nine Mile Burn - Closure

Location:A702 (End Of Verge to A766 Penicuik) to A702 (A766 Penicuik to C57 Silverburn Rd), Northbound

Start time:8th of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Diversion for Traffic Heading Northbound: A702 Northbound, A721 Roman Road Eastbound, A72 Northbound, A701 Northbound, A701 Peebles Road Northbound, A701 Bridge Street Northbound, A701 John Street Northbound, A701 Edinburgh Road Northbound, Gowkley Moss Roundabout, A701 Northbound, A703 Seafield Moor Road Northbound, A702 Northbound.

A702 - NB - Biggar - Temp lights

Location:A702 (A72 South Junction to A72 Jct North Biggar), Northbound

Start time:21st of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - NB - Biggar - Temp lights

Location:A702 (A72 South Junction to A72 Jct North Biggar), Northbound

Start time:17th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - NB - Silverburn - Closure

Location:A702 (A766 Penicuik to C57 Silverburn Rd) to A702 (C57 Silverburn Rd to Jct Grange Dell), Northbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Diversion for Traffic Heading Northbound: A702 Northbound, A766 Junction, A766 Carlops Road Northbound, A701 Northbound, Gowkley Moss Roundabout, Bush Loan Road Westbound, A702 Northbound.

A702 - NB - WEST LINTON - TEMP LIGHTS

Location:A702 (Golf Course Road to Robins Land Roundabout), Northbound

Start time:6th of January 2025, 6:00am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - NB - Wandel - Temp lights

Location:A702 (Maidencots Rbt to Br Over Wandel Burn), Northbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - SB -Nine Mile Burn - Closure

Location:A702 (A766 Penicuik to C57 Silverburn Rd) to A702 (End Of Verge to A766 Penicuik), Southbound

Start time:8th of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Diversion for Traffic Heading Southbound: A702 Southbound, A703 Seafield Moor Road Southbound, A701 Southbound, Gowkley Moss Roundabout, A701 Edinburgh Road Southbound, A701 John Street Southbound, A701 Bridge Street Northbound, A701 Peebles Road Southbound, A701 Southbound, A72 Southbound, A721 Roman Road Westbound, A702 Southbound.

A702 - SB - Biggar - Temp lights

Location:A702 (A72 South Junction to A72 Jct North Biggar), Southbound

Start time:21st of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - SB - Biggar - Temp lights

Location:A702 (A72 South Junction to A72 Jct North Biggar), Southbound

Start time:17th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - SB - Silverburn - Closure

Location:A702 (C57 Silverburn Rd to Jct Grange Dell) to A702 (A766 Penicuik to C57 Silverburn Rd), Southbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Turn left onto Bush Loan Road. After 1.2 miles, take the 3rd exit onto A701 for 6.1 miles. Turn Right at Leadburn to continue on A701. After 9.3 miles turn right onto A72 at Blyth Bridge then after 0.7 miles turn right onto A721. Rejoin A702 at Melbourne Crossroads

A702 - SB - WEST LINTON - TEMP LIGHTS

Location:A702 (Golf Course Road to Robins Land Roundabout), Southbound

Start time:6th of January 2025, 9:00am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 - SB - Wandel - Temp lights

Location:A702 (Maidencots Rbt to Br Over Wandel Burn), Southbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A702 NB Abington. Portable Traffic Lights.

Location:A702 (North End Of Dual C/Way to Maidencots Rbt), Northbound

Start time:21st of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 NB Biggar. Road Closure

Location:A702 (A72 South Junction to A72 Jct North Biggar), Northbound

Start time:31st of December 2024, 8:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

Diversion Information:
Divert onto A73 to A70 then A721 and return to A702.

A702 NB Carlops. Portable Traffic Lights.

Location:A702 (Jct. South Mains to Regional Boundary), Northbound

Start time:6th of January 2025, 9:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A702 SB Abington. Portable Traffic Lights.

Location:A702 (North End Of Dual C/Way to Maidencots Rbt), Southbound

Start time:21st of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A702 SB Biggar. Road Closure

Location:A702 (A72 South Junction to A72 Jct North Biggar), Southbound

Start time:31st of December 2024, 8:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

Diversion Information:
Diverted via A721 then A70 to A73 the return onto A702.

A702 SB Carlops. Portable Traffic Lights.

Location:A702 (Jct. South Mains to Regional Boundary), Southbound

Start time:6th of January 2025, 9:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A720 - EB - Baberton - Lane closure

Location:A720 (S Of Calder Jct to Baberton Jct) to A720 (Bonaly Rd Br. to W Dreghorn), Eastbound

Start time:23rd of December 2024, 8:00pm

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A720 - EB - Baberton EB On Slip to A720 - Closure

Location:A720 (Sseb Rbt Hunterston to Baberton Entry Slip), Eastbound

Start time:23rd of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - Baberton EB Onslip to A720 - Closure

Location:A720 (Sseb Rbt Hunterston to Baberton Entry Slip), Eastbound

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - Baberton to Bonaly - Closure

Location:A720 (N Of M8 Ext Jct to S Of M8 Ext Jct) to A720 (Eastbound Slip to E Of Dreghorn Jct), Eastbound

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - Calder EB On Slip to A720 - Closure

Location:A720 (A71 Rbt to Eb Slip From A71), Eastbound

Start time:23rd of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - Calder EB Onslip to A720 - Closure

Location:A720 (A71 Rbt to Eb Slip From A71), Eastbound

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - East of Calder to Baberton - Closure

Location:A720 (N Of M8 Ext Jct to S Of M8 Ext Jct) to A720 (Eastbound Slip to E Of Dreghorn Jct), Eastbound

Start time:23rd of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - Hermiston EB On Slip to A720 - Closure

Location:A720 (M8 Hermiston Gait Rbt to Slip To A720), Eastbound

Start time:23rd of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 - EB - Hermiston EB Onslip to A720 - Closure

Location:A720 (M8 Hermiston Gait Rbt to Slip To A720) to A720 (N Of M8 Ext Jct to S Of M8 Ext Jct), Eastbound

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will be diverted off the A720 Eastbound on to the A71 Calder Road.
At the first roundabout take the 3rd exit on to B701 / Westerhailes Road.
At the next roundabout take the 2nd exit and continue on the B701 for 1.2 miles then turn right on to Redford Road.
At the roundabout take the 2nd exit onto Dreghorn Link, then follow signs for A720 City Bypass / Berwick upon Tweed (A1)

A720 WB - Lane Closure - Baberton to Calder

Location:A720 (Baberton Jct to S Of Calder Jct), Westbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A721 Southbound to M74 Southbound - Total closure

Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou

Start time:22nd of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.

A721 Southbound to M74 Southbound on-slip - Total closure

Location:M73 (Jct A74 Glasgow Rd to Merge To M73 Sb) to M73 (End Of Broken Lane Line to Merge To M74 Sb), Sou

Start time:10th of January 2025, 8:00pm

Description:Works:
Lighting Works

Traffic Management:
Road Closure.

Diversion Information:
M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.

A725 Kingsway Whitemoss Rbt and Whirlies Rbt - Lane Closure

Location:A725 (Whitemoss Rbt to Whirlies Rbt), Northbound

Start time:7th of January 2025, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A725 Northbound Raith underpass - Progressive nearside / Offside lane closures

Location:A725 (Raith Rbt to Whistleberry Toll Rbt) to A725 (Raith Rbt to Off Slip Orbiston Int), Northbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A725 Southbound Bellziehill main line - Nearside lane closure

Location:A725 (Diamond Int. Ob to Benziehill Int On-Slip) to A725 (Bellziehill On Slip to Off Slip Orbiston I

Start time:8th of January 2025, 8:00pm

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A725 Southbound Bellziehill on-slip - Total closure

Location:A725 (Bellziehill Rbt to On Slip Ftom Bellziehill) to A725 (Diamond Int. Ob to Benziehill Int On-Sli

Start time:8th of January 2025, 8:00pm

Description:Works:
Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
Bellziehill Roundabout, a725 Northbound on-slip, A725 Northbound Diamond off-slip, A725 Southbound Diamond on-slip.

A725 Southbound Raith Underpass - Progessive nearside / offside lane closures

Location:A725 (Raith Rbt to Off Slip Orbiston Int) to A725 (Raith Rbt to Whistleberry Toll Rbt), Southbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A725 Southbound Raith off-slip - Total closure

Location:A725 (On Slip Orbiston Int to Raith Rbt) to A725 (Raith Rbt to Raith Rbt), Southbound

Start time:23rd of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
A725 Southbound, A725 Southbound Main Street off-slip, A725 Northbound Main Street on-slip.

A725 WB E Kilbride Expy off slip to Hillhouse Rd - Lane closure

Location:A725 (Wb Off Slip to Eb On Slip) to A725 (Wb Off Slip to Newhouse Rbt), Westbound

Start time:13th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

Diversion Information:
Douglas Street - Main Street (B7012) - East Avenue - Hillhouse Road

A737 EB Johnstone off slip Total Closure

Location:A737 (Off Slip To B789 to B789 Rbt), Eastbound

Start time:8th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
Follow A737 Exit Linwood - Turn - Join A737 WB - Exit Johnstone off

A737 EB Kilbarchan Lane Closure

Location:A737 (Start Dual Carriageway to On Slip From B787) to A737 (On Slip From B787 to Off Slip To B789),

Start time:8th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Lane Closure.

A737 EB Kilbarchan on slip Total Closure

Location:A737 (B787 Rbt to On Slip From B787) to A737 (Start Dual Carriageway to On Slip From B787), Eastboun

Start time:8th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
B787 Kilbarchan Rd - Graham St - Join A737 Johnstone on Slip

A737 Highfield Rbt to Hillend Rbt Dalry SB - Total Closure

Location:A737 (Highfield Jct to B707 Jct) to A737 (Speed Derestriction to Monkcastle), Southbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
Diversion For Vehicles not HGV B707 Beith Road - Townend St - Kilwinning Road - End HGV will be escorted through works

A737 Hillend Rbt to Highfield Rbt Dalry NB - Total Closure

Location:A737 (Speed Derestriction to Monkcastle) to A737 (Highfield Jct to B707 Jct), Northbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
Diversion For Vehicles not HGV B707 Beith Road - Townend St - Kilwinning Road - End HGV will be escorted through works

A737 Linclive IC WB - Total Closure

Location:A737 (Wb Off Slip to Wb On Slip), Westbound

Start time:7th of January 2025, 10:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
follow diversion -

A737 WB off to Linclive - 2nd exit A737 EB on from Linclive - End

A737 NB Clerksbridge Rbt - TTLS

Location:A737 (Clerksbridge Toll Rbt to North Ayrshire Bdy) to A737 (Roadhead Rbt to Clerksbride Toll Rbt), N

Start time:16th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A737 NB Johnstone On Slip total Closure

Location:A737 (B789 Rbt to On Slip From B789) to A737 (Off Slip To B789 to On Slip From B789), Northbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
A737 SB to Kilbarchan - Exit Join A737 NB - End

A737 SB Clerksbridge Rbt - TTLS

Location:A737 (Roadhead Rbt to Clerksbride Toll Rbt) to A737 (Clerksbridge Toll Rbt to North Ayrshire Bdy), S

Start time:16th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A737 SB Johnstone Off Slip total Closure

Location:A737 (Off Slip To B789 to B789 Rbt), Southbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Filter Drain

Traffic Management:
Road Closure.

Diversion Information:
A737 SB to Kilbarchan - Exit Join A737 NB - Exit Johnstone off - End

A737 offslip to Johnstone NB - Total Closure

Location:A737 (Off Slip To B789 to B789 Rbt), Northbound

Start time:13th of January 2025, 10:00pm

Description:Works:
Carriageway Patching, Gully/ironwork repairs

Traffic Management:
Lane Closure.

Diversion Information:
follow diversion -

Continue A737 EB - Linwood EB offslip - 1st exit onto A761 - A761 - 1st exit onto Bridge of Weir Rd - Deafhillock Rbt - End

A737 prior Linclive IC Linwood WB - Lane Closure

Location:A737 (Wb On Slip to Linclive Jct) to A737 (Wb Off Slip to Wb On Slip), Westbound

Start time:7th of January 2025, 10:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A738 EB Stevenston Rd/Byres Road -TTL

Location:A738 (Start Single 3- Lane Cway to A78 Pennyburn Rbt) to A738 (A737 Kilwinning to Pennyburn Rd Jct),

Start time:6th of January 2025, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A738 WB Stevenston Rd/Byres Road - TTL

Location:A738 (A737 Kilwinning to Pennyburn Rd Jct) to A738 (Start Single 3- Lane Cway to A78 Pennyburn Rbt),

Start time:6th of January 2025, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A738 EB Kilwinning Rd to Pennyburn RBT - lane closures

Location:A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated Left Turn Lane) to A78 (Pennyburn Roundab

Start time:20th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Lane Closure.

A738 Kilwinning Rd EB - Lane Closure

Location:A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated Left Turn Lane) to A78 (Pennyburn Roundab

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A738 Kilwinning Rd WB - Lane Closure

Location:A78 (Start Of Dedicated Left Turn Lane to End Of Dedicated Left Turn Lane) to A78 (Pennyburn Roundab

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A738 Stevenston Rd NB - Lane Closure

Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A738 (Jct Whitehouse Park Rd to Start Single 3

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A738 Stevenston Rd SB- Lane Closure

Location:A738 (Jct Whitehouse Park Rd to Start Single 3- Lane Cway) to A738 (Start Single 3- Lane Cway to A78

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A738 WB Stevenson to Pennyburn RBT - Lane Closure

Location:A738 (Start Single 3- Lane Cway to A78 Pennyburn Rbt) to A78 (Pennyburn Roundabout to Pennyburn Roun

Start time:20th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Lane Closure.

A75 - A75/ A701 Rbt Dumfries Bypass EB - Road Narrowing

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Eastbound

Start time:26th of January 2025, 6:00am

Description:Works:
Structural Repairs

Traffic Management:
Road Narrowing (Two Way Working).

A75 - A75/ A701 Rbt Dumfries Bypass WB - Road Narrowing

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Westbound

Start time:26th of January 2025, 6:00am

Description:Works:
Structural Repairs

Traffic Management:
Road Narrowing (Two Way Working).

A75 from B735 Halfway House Kirkcolm EB- TTL

Location:A75 (Jct Dirnow to B733 Jct), Eastbound

Start time:6th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 from B735 Halfway House Kirkcolm WB- TTL

Location:A75 (Jct Dirnow to B733 Jct), Westbound

Start time:6th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 @ Water of Luce EB - Convoy Working

Location:A75 (Stairhaven Junc to Old A75 Junc), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Convoy Working (10mph)

A75 @ Water of Luce WB - Convoy Working

Location:A75 (Stairhaven Junc to Old A75 Junc), Westbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Convoy Working (10mph)

A75 @ Woodside from Collin Bypass EB - TTLS

Location:A75 (Mousewald Ldge Jct to Torthorwald Jct), Eastbound

Start time:31st of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 @ Woodside from Collin Bypass WB - TTLS

Location:A75 (Mousewald Ldge Jct to Torthorwald Jct), Westbound

Start time:31st of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 A751 Jct Castle Kennedy EB - TTL

Location:A75 (A751 Jct to 40 Mph Xroads) to A75 (Jct Inch Church to A751 Jct), Eastbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 A751 Jct Castle Kennedy WB - TTL

Location:A75 (Jct Inch Church to A751 Jct) to A75 (A751 Jct to 40 Mph Xroads), Westbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Annan EB - TTLS

Location:A75 (Nivenhill O'Bridge to Irvington Fm) to A75 (End Dual C'Way to Nivenhill O'Bridge), Eastbound

Start time:6th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Annan WB - TTLS

Location:A75 (End Dual C'Way to Nivenhill O'Bridge) to A75 (Nivenhill O'Bridge to Irvington Fm), Westbound

Start time:6th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Auchenlarie EB - TTLS

Location:A75 (Auchenlarie Fm to Kirkdale Hse Jct), Eastbound

Start time:7th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Auchenlarie WB - TTLS

Location:A75 (Auchenlarie Fm to Kirkdale Hse Jct), Westbound

Start time:7th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Blackcraig Palnure EB Convoy

Location:A75 (Jct Blackcraig to A712 Jct) to A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A75 Blackcraig Palnure EB TTL's

Location:A75 (Jct Blackcraig to A712 Jct) to A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound

Start time:15th of January 2025, 6:00am

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Blackcraig Palnure WB Convoy

Location:A75 (Jct Muirfad Fm to Jct Blackcraig) to A75 (Jct Blackcraig to A712 Jct), Westbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A75 Blackcraig Palnure WB TTL's

Location:A75 (Jct Muirfad Fm to Jct Blackcraig) to A75 (Jct Blackcraig to A712 Jct), Westbound

Start time:15th of January 2025, 6:00am

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Carsluith Creetown EB TTL

Location:A75 (Carsluith Jct Sth to Carsluith Jct Nth), Eastbound

Start time:10th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Carsluith Creetown WB TTL

Location:A75 (Carsluith Jct Sth to Carsluith Jct Nth), Westbound

Start time:10th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Dancingknowe Rbt Collin EB TTL

Location:A75 (Jct Nether Yett to Dancingknowe Rbt), Eastbound

Start time:27th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Dancingknowe Rbt Collin WB TTL

Location:A75 (Jct Nether Yett to Dancingknowe Rbt), Westbound

Start time:27th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 EB Garroch Rdbt to New Cargen Bridge Rdbt - Total Closure

Location:A75 (Start Garroch Loaning Rbt to End Garroch Loaning Rbt) to A75 (New Cargenbridge Rbt to New Carge

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
National Cycle Rte 7 to A711, onto A780 WB and follow to New Cargen Bridge Rdbt -End Diversion-

A75 EB Auchenreoch Loch, Crocketford - TTL

Location:A75 (Jct Brandedleys to Jct Lairdlaugh), Eastbound

Start time:3rd of January 2025, 9:30am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A75 EB Dumfires Bypass - TTL's

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Eastbound

Start time:9th of January 2025, 6:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Haugh of Urr EB - TTLs

Location:A75 (Jct Garmartin to B794 Jct), Eastbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Haugh of Urr WB - TTLs

Location:A75 (Jct Garmartin to B794 Jct), Westbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Near Kirtleside Eastriggs EB - TTLS

Location:A75 (End Dual C'Way to Nivenhill O'Bridge), Eastbound

Start time:24th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Near Kirtleside Eastriggs WB - TTLS

Location:A75 (End Dual C'Way to Nivenhill O'Bridge), Westbound

Start time:24th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Palnure Dumfries and Galloway EB- TTL

Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Eastbound

Start time:6th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Palnure Dumfries and Galloway WB- TTL

Location:A75 (Jct Muirfad Fm to Jct Blackcraig), Westbound

Start time:6th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Sandgreen Gatehouse of Fleet EB- TTL

Location:A75 (Sandgreen Road to Climbing Lane End), Eastbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Sandgreen Gatehouse of Fleet WB- TTL

Location:A75 (Sandgreen Road to Climbing Lane End), Westbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Shennanton to Glen Luce EB TTL's

Location:A75 (Old Gravel Pit to Jct Dervaird) to A75 (Jct Blackhill Croft to B735 Jct), Eastbound

Start time:13th of January 2025, 6:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A75 Shennanton to Glen Luce WB TTL's

Location:A75 (Jct Blackhill Croft to B735 Jct) to A75 (Old Gravel Pit to Jct Dervaird), Westbound

Start time:13th of January 2025, 6:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A75 WB Auchenreoch Loch, Crocketford - TTL

Location:A75 (Jct Brandedleys to Jct Lairdlaugh), Westbound

Start time:3rd of January 2025, 9:30am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A75 WB Dumfires Bypass - TTL's

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Westbound

Start time:9th of January 2025, 6:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A75 WB New Cargen Bridge Rbt to Garroch Rbt - Total Closure

Location:A75 (Cargenbridge Rbt to Garroch Loaning Rbt), Southbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
Diversion is off at Cuckoo Bridge Rdbt to Glasgow Rd to Glasgow St to A780 onto A711 then follow National Cycle Rte 7 back to Garroch Rdbt -End Diversion-

A75 Woodside @ Dumfries EB - Lane Closure

Location:A75 (West Bullnose to B724 Jct) to A75 (B724 Jct to East Bullnose), Eastbound

Start time:7th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A75 from A75/A701 Rbt EB Dumfries Bypass - Total closure

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Eastbound

Start time:26th of January 2025, 6:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Cuckoo Bridge Rbt - South on A76 Glasgow Rd - A76 Glasgow St - A780 Buccleuch - A780 Church Cres - A780 Academy St - A701 Edinburgh Rd - A75 Bloomfield Rbt - Diversion End

A75 from A75/A701 Rbt WB Dumfries Bypass - Total closure

Location:A75 (Edinburgh Rd Rbt A701 to Glasgow Rd Rbt A76), Southbound

Start time:26th of January 2025, 6:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Cuckco Bridge Rbt - South on A76 Glasgow Rd - A76 Glasgow St - A780 Buccleuch - A780 Church Cres - A780 Academy St - A701 Edinburgh Rd - A75 Bloomfield Rbt - Diversion End (IN REVERSE)

A76 NB Caslte New Cumnock - TTLS

Location:A76 (B741 Mossmark Jct to Polqueys Rd Jct), Northbound

Start time:6th of January 2025, 7:00am

Description:Works:
Third Party Works, Skip/Scaffold

Traffic Management:
Portable Traffic Lights (TTLS).

A76 NB Dettingen Rdbt to Templeton Rdbt - Total Closure

Location:A76 (Dettingen Rbt to Templeton Rbt), Southbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

A76 NB High Street, Sanquhar - TTLS

Location:A76 (Jct Esso Ps to Jct To Manse), Northbound

Start time:13th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 NB Main Street Jct Hyslop Street Kirkconnel - TTLs

Location:A76 (Jct To Kelloholm to Jct Kirkconnell Station), Northbound

Start time:18th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 NB at Mennock - TTL's

Location:A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange), Northbound

Start time:6th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB Caslte New Cumnock - TTLS

Location:A76 (B741 Mossmark Jct to Polqueys Rd Jct), Southbound

Start time:6th of January 2025, 7:00am

Description:Works:
Third Party Works, Skip/Scaffold

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB High Street, Sanquhar - TTLS

Location:A76 (Jct Esso Ps to Jct To Manse), Southbound

Start time:13th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB Main Street Jct Hyslop Street Kirkconnel - TTLs

Location:A76 (Jct To Kelloholm to Jct Kirkconnell Station), Southbound

Start time:18th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 SB Templeton Rbt to Dettingen Rbt - Total Closure

Location:A76 (Templeton Rbt to Templeton Rbt) to A76 (Dettingen Rbt to Dettingen Rbt), Southbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
B7083 to A70 New Bridge St to A70 Ayr Rd onto Dettingen Rdbt -End Diversion-

A76 SB at Mennock - TTL's

Location:A76 (N End Of Glenairlie 3-Lane to Jct (L) Eliock Grange), Southbound

Start time:6th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A76 South of Mennock NB - TTLS

Location:A76 (S End Of Glenairlie 3-Lane to Priority Changeover S End), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A76 South of Mennock SB - TTLS

Location:A76 (S End Of Glenairlie 3-Lane to Priority Changeover S End), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Bankfield to Whitletts NB Road Closure

Location:A77 (Bankfield Rbt to Climbing Lane End) to A77 (Start 3 Lane to End Single Cway), Northbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Northbound traffic will leave the A77 onto A713 Dalmellington road continuing along Castlehill Rd and joining the A70 Station rd. Traffic will comtinue on station rd before turning left onto A79 John St. At the roundabout traffic will take the 3rd exit onto A719 Whittletts rd and contiue to Whitletts Rbt where it will rejoin the A77.

Southbound traffic in reverse

A77 Cairnryan Road to A751 Innermessan Jct NB- Total Closure

Location:A77 (Mcmasters Rd to A751 Dunfries Jct) to A751 (A75 Jct to A77 Jct), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Right turn onto A751 from the A75, Right turn onto A77.

A77 Cairnryan Road to A751 Innermessan Jct SB - Total Closure

Location:A751 (A75 Jct to A77 Jct) to A77 (Mcmasters Rd to A751 Dunfries Jct), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Left turn onto A751 from the A77, Left turn onto A75.

A77 Carlock Ballantrae SB - TTL

Location:A77 (Jct At Carlock House to Jct At Ballochdowan) to A77 (North Mark Br to Jct Carlock Hse), Southbo

Start time:21st of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Carlock Ballantrae NB TTL

Location:A77 (North Mark Br to Jct Carlock Hse) to A77 (Jct At Carlock House to Jct At Ballochdowan), Northbo

Start time:21st of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Dalrymple St Girvan - Total Closure

Location:A77 (Stumpy Corner to Wesley Road) to A77 (Start Kirkpatrick St Rbt to End Kirkpatrick St Rbt), Sout

Start time:6th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Continue onto A77 Henrietta St.

A77 Glendoune St Girvan - Total Closure

Location:A77 (Stumpy Corner to Wesley Road) to A77 (Duff Street to Kirkpatrick Street Rbt), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Continue onto A77 Henrietta St.

A77 Holmston Rbt Ayr NB - TTL

Location:A77 (Climbing Lane End to Start Of 4 Lane Single), Northbound

Start time:26th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Holmston Rbt Ayr - TTL

Location:A77 (Climbing Lane End to Start Of 4 Lane Single), Southbound

Start time:26th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Holmston Rbt SB Ayr - Lane 1 Closure

Location:A77 (Start Of 4 Lane to Holmston Roundabout) to A77 (Climbing Lane End to Start Of 4 Lane Single), S

Start time:26th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Mobile Lane Closures.

A77 Holmston Rbt to Maybole Rd - SB Road Closure

Location:A77 (Start Of 4 Lane to Holmston Roundabout) to A77 (A79 Jct Maybole Rd to Bankhead Rbt), Southbound

Start time:17th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
traffic will leave the A77 at Holmston rbt and continue on Holmston Rd joinining the A70 Station rd, station rd bridge and Parkhouse St. traffic will then turn onto the A79 and continue along Beresford Terr, Carrick Rd, St Leonards Rd & Maybole rd rejoining the A77 at the A77/Maybole rd junction.

A77 Holmston Roundabout NB - TTLS

Location:A77 (Start Of 4 Lane to Holmston Roundabout) to A77 (Holmston Rbt to Start 3 Lane), Northbound

Start time:10th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Holmston Roundabout SB - TTLS

Location:A77 (Holmston Rbt to Start 3 Lane) to A77 (Start Of 4 Lane to Holmston Roundabout), Southbound

Start time:10th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Kirkoswald Road Turnberry NB TTL

Location:A77 (Dipple,Factory Ent to A719 Jct) to A77 (A719 Junction to South End Turnberry Climbing Lane), No

Start time:3rd of January 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Kirkoswald Road Turnberry SB - TTLS

Location:A77 (A719 Junction to South End Turnberry Climbing Lane) to A77 (Dipple,Factory Ent to A719 Jct), So

Start time:3rd of January 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Main Street Ballantrae NB - TTLS

Location:A77 (B7044 Jct to Start Climbing Lane), Northbound

Start time:30th of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Main Street Ballantrae SB - TTLS

Location:A77 (B7044 Jct to Start Climbing Lane), Southbound

Start time:30th of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Maybole Rd to Holmston Rbt - NB Road closure

Location:A77 (A79 Jct Maybole Rd to Bankhead Rbt) to A77 (Start Of 4 Lane to Holmston Roundabout), Northbound

Start time:17th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Traffic will leave the A77 at the Maybole Rd junction and continue on A79 Maybole Rd, St Leonards Rd and turn right onto A79 Carrick Rd continuing on the A79 Beresford Terrace and turning right onto A70 Station Rd. Traffic will continue on the A70 Station Rd & Station bridge rd. At the first roundabout traffic will take the first exit onto A70 Holmston Rd and at the next rbt take the second exit onto A70 Holmston Rd. Traffic will continue on Holmston Rd rejoining the A77 at Holmston Rbt

A77 NB Bankfield Roundabout - TTL's

Location:A77 (Bankfield Rbt to Bankfield Rbt), Northbound

Start time:17th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB from A751 Innermessan at Loch Ryan Port. Carinryan -TTls

Location:A77 (Jct Bonny Braes to S Ayrshire Bdy), Northbound

Start time:15th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Kirkoswald Rd Turnberry - TTLS

Location:A77 (Dipple,Factory Ent to A719 Jct), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Kirkoswald Rd at Turnberry - TTLs

Location:A77 (A719 Junction to South End Turnberry Climbing Lane), Northbound

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Prior to Glenapp Church - TTL

Location:A77 (North Mark Br to Jct Carlock Hse), Northbound

Start time:15th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 NB Sandyford Toll Rbt to Dutch House Rbt - Offside Lane Closure

Location:A77 (Sandyford Toll Roundabout to Sandyford Toll Roundabout) to A77 (Sandyford Toll Roundabout to Du

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Lane Closure.

A77 NB Sandyford Toll Rbt to Dutch House Rbt- Total Closure

Location:A77 (Sandyford Toll Roundabout to Sandyford Toll Roundabout) to A77 (Dutch Hse Rbt to Dutch Hse Rbt)

Start time:13th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
A719 to A76 Cross Roads Rdbt to Bellfield I/C then onto A77 SB to Dutch House Rdbt - End Diversion-

A77 NB Smithston Roundabout, Minishant - Lane Closure

Location:A77 (Smithston Br to Jct Kewnston), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A77 NB approach to Holmston Rbt - Lane Closure

Location:A77 (Climbing Lane End to Start Of 4 Lane Single) to A77 (Start Of 4 Lane to Holmston Roundabout), N

Start time:10th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
10/01/2025 - Lane Closure, 11/01/2025 - Lane Closure, 12/01/2025 - Lane Closure, 13/01/2025 - Lane Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Portable Traffic Lights (TTLS)

A77 NB at Innermessan - TTLS

Location:A77 (Mcmasters Rd to A751 Dunfries Jct) to A77 (A751 Dumfries Jct to Jct Beoch), Northbound

Start time:13th of January 2025, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Dutch House Rbt to Sandyford Toll Rbt - Offside Lane Closure

Location:A77 (Dutch House R/Bout to Sandyford Toll Roundabout) to A77 (Sandyford Toll Roundabout to Sandyford

Start time:13th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Lane Closure.

A77 SB from A751 Innermessan at Loch Ryan Port. Carinryan - TTls

Location:A77 (Jct Bonny Braes to S Ayrshire Bdy), Southbound

Start time:15th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Dutch House Rbt to Sandyford Toll Rbt - Total Closure

Location:A77 (Dutch Hse Rbt to Dutch Hse Rbt) to A77 (Sandyford Toll Roundabout to Sandyford Toll Roundabout)

Start time:20th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

Diversion Information:
A77 to Bellfield Interchange then onto A76 EB to Crossroads Rdbt onto A719 WB to Sandyford Toll Rdbt -End Diversion-

A77 SB Kirkoswald Rd Turnberry - TTLS

Location:A77 (Dipple,Factory Ent to A719 Jct), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Kirkoswald Rd at Turnberry - TTLs

Location:A77 (A719 Junction to South End Turnberry Climbing Lane), Southbound

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Prior to Glenapp Church - TTL

Location:A77 (North Mark Br to Jct Carlock Hse), Southbound

Start time:15th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A77 SB Smithston Roundabout,Minishant- Lane Closure

Location:A77 (Smithston Br to Jct Kewnston), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A77 SB approach to Holmston Rbt - lane closure

Location:A77 (Holmston Rbt to Start 3 Lane) to A77 (Holmston Rbt to Holmston Rbt), Southbound

Start time:10th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
10/01/2025 - Lane Closure, 11/01/2025 - Lane Closure, 12/01/2025 - Lane Closure, 13/01/2025 - Lane Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Portable Traffic Lights (TTLS)

A77 SB at Innermessan - TTLS

Location:A77 (A751 Dumfries Jct to Jct Beoch) to A77 (Mcmasters Rd to A751 Dunfries Jct), Southbound

Start time:13th of January 2025, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A77 To A751 Innermess Cairnryan SB - TTL

Location:A77 (Drummuckloch Fm to Derest Sign) to A77 (Jct Beoch to Drummuckloch Fm), Southbound

Start time:7th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A77 Whitletts to Meiklewood NB Lane Closure

Location:A77 (Whitletts Roundabout to Sandyford Toll Roundabout) to A77 (M77 Dbfo Boundary to Slip Road Exit

Start time:8th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

A77 Whitletts to Meiklewood SB Lane Closure

Location:A77 (M77 Dbfo Boundary to Off Slip To A76/A71) to A77 (Start Of 4 Lane to Whitletts Rbt), Southbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

A77 Whittlets Rbt to Bankfield Rbt SB Road Closure

Location:A77 (Start 3 Lane to End Single Cway) to A77 (Bankfield Rbt to Bankfield Rbt), Southbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Northbound traffic will leave the A77 onto A713 Dalmellington road continuing along Castlehill Rd and joining the A70 Station rd. Traffic will comtinue on station rd before turning left onto A79 John St. At the roundabout traffic will take the 3rd exit onto A719 Whittletts rd and contiue to Whitletts Rbt where it will rejoin the A77.

Southbound traffic in reverse

A77 from A751 Innermessan Cairnryan NB- TTL

Location:A77 (Jct Beoch to Drummuckloch Fm) to A77 (Drummuckloch Fm to Derest Sign), Northbound

Start time:7th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A78 NB Irvine Road/Snowdon Terrace South of Farlie TTL

Location:A78 (Sseb Rbt Hunterston to Sseb Rbt Hunterston) to A78 (Lodge At Sou'An Rd End to Bsc Rbt Huntersto

Start time:16th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Rd @ Hunterson Rbt SB - Lane Closure

Location:A78 (Bsc Rbt Hunterston to Sseb Rbt Hunterston) to A78 (Sseb Rbt Hunterston to Jct B782), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A78 Irvine Rd NB - TTLS

Location:A78 (Jct B782 to Jct B7048), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Rd NB - TTLS

Location:A78 (Sseb Rbt Hunterston to Jct B782), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Rd NB - TTLS

Location:A78 (Jct B782 to Jct B7048) to A78 (Sseb Rbt Hunterston to Jct B782), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Rd SB - TTLS

Location:A78 (Jct B782 to Jct B7048), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Rd SB - TTLS

Location:A78 (Sseb Rbt Hunterston to Jct B782) to A78 (Jct B782 to Jct B7048), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Irvine Rd SB - TTLS

Location:A78 (Jct B782 to Jct B7048), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Montfode to Monktonhead NB - Lane Closure

Location:A78 (Monkton Rbt to Off Slip B746) to A78 (Montfode Roundabout to Montfode Roundabout), Northbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Lane Closure.

A78 Montfode to Monktonhead NB - Lane closure

Location:A78 (Monkton Rbt to Off Slip B746) to A78 (Montfode Roundabout to Montfode Roundabout), Northbound

Start time:30th of December 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Lane Closure.

A78 Montfode to Monktonhead NB - Mobile Lane Closures

Location:A78 (Monkton Rbt to Off Slip B746) to A78 (Montfode Roundabout to Montfode Roundabout), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Mobile Lane Closures.

A78 Montfode to Monktonhead SB - Lane Closure

Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (Entry Slip B746 to Monkton Rbt), Southbound

Start time:30th of December 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Lane Closure.

A78 Montfode to Monktonhead SB - Lane Closure

Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (Entry Slip B746 to Monkton Rbt), Southbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Inspections

Traffic Management:
Lane Closure.

A78 Montfode to Monktonhead SB - Mobile Lane Closures

Location:A78 (Montfode Roundabout to 40 Mph Speed Limit) to A78 (Entry Slip B746 to Monkton Rbt), Southbound

Start time:20th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Mobile Lane Closures.

A78 NB Wemyss Bay TTL

Location:A78 (40mph Wemyss Bay to Kelly Bridge), Northbound

Start time:27th of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A78 NB Greenock Rd, Largs - Stop and Go

Location:A78 (Acc To Service Rd to Nelson St), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Stop/Go Boards Traffic Control.

A78 NB Greenock Rd, Wemyss Bay - Priority System Traffic Control

Location:A78 (40mph Wemyss Bay to Kelly Bridge), Northbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Priority System Traffic Control.

A78 NB Meigle Rd South of Skelmorlie - TTLS

Location:A78 (Eglinton Terr to Glenhaven House), Northbound

Start time:25th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 NB Pennyburn RBT - Lane Closures

Location:A78 (40 Mph Speed Limit to Pennyburn Roundabout), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Lane Closure.

A78 NB Shore Rd Skelmorlie at Eglinton Terrace - TTLS

Location:A78 (Eglinton Terr to Glenhaven House) to A78 (Kelly Bridge to Eglinton Terr), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 NB Shore Rd, Skelmorlie - Stop and Go

Location:A78 (Kelly Bridge to Eglinton Terr), Northbound

Start time:27th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control.

A78 NB at Pennyburn RBT - TTLS

Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Speed Derestriction Sign to Sharphill Rou

Start time:20th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Pennyburn Rbt SB - Lane Closure

Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout), Southbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A78 Pennyburn Rbt to Irvine Rd Overbridge SB - Total Closure

Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Rail Overbridge to Irvine Rd Overbridge),

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Road Closure.

Diversion Information:
Continue onto Stevenston Rd, Continue onto A737 Lauchlan Way then onto Irvine Rd.

A78 SB Irvine Road/Snowdon Terrace South of Farlie TTL

Location:A78 (Lodge At Sou'An Rd End to Bsc Rbt Hunterston) to A78 (Sseb Rbt Hunterston to Sseb Rbt Huntersto

Start time:16th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 SB Shore Rd Skelmorlie at Eglinton Terrace - TTLS

Location:A78 (Kelly Bridge to Eglinton Terr) to A78 (Eglinton Terr to Glenhaven House), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 SB Skelmorlie - Stop and Go

Location:A78 (Kelly Bridge to Eglinton Terr), Southbound

Start time:27th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control.

A78 SB Wemyss Bay - TTLS

Location:A78 (40mph Wemyss Bay to Kelly Bridge), Southbound

Start time:27th of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A78 SB at Pennyburn RBT - TTLS

Location:A78 (Sharphill Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Pennyburn Roundabout)

Start time:20th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Sharphill Rbt to Pennyburn Rbt NB - Lane Closure

Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout) to A78 (Speed Derestriction Sign to Sharphill Rou

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A78 Sharphill Rbt to Pennyburn Rbt SB - Lane Closures

Location:A78 (Sharphill Roundabout to 40 Mph Speed Limit) to A78 (40 Mph Speed Limit to Pennyburn Roundabout)

Start time:20th of January 2025, 8:00pm

Description:Works:
Pavement Surveys

Traffic Management:
Lane Closure.

A78 Shore Rd Skelmorlie NB - TTLS

Location:A78 (Kelly Bridge to Eglinton Terr), Northbound

Start time:21st of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Shore Rd Skelmorlie SB - TTLS

Location:A78 (Kelly Bridge to Eglinton Terr), Southbound

Start time:21st of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Snowdon Terrace NB - TTLS

Location:A78 (Jct B7048 to Yerton Brae Jct), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Snowdon Terrace SB - TTLS

Location:A78 (Jct B7048 to Yerton Brae Jct), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Wemyss Bay NB - TTLs

Location:A78 (40mph Wemyss Bay to Kelly Bridge), Northbound

Start time:13th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 Wemyss Bay SB - TTLs

Location:A78 (Jct Inverkip to Exit Power Stat) to A78 (40mph Wemyss Bay to Kelly Bridge), Southbound

Start time:13th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A78 on Pennyburn RBT - Lane Closures

Location:A78 (Pennyburn Roundabout to Pennyburn Roundabout), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Lane Closure.

A78 sB Greenock Rd, Largs- Stop and Go

Location:A78 (Acc To Service Rd to Nelson St), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Gully Emptying

Traffic Management:
Stop/Go Boards Traffic Control.

A8 B789 WB Langbank off slip -Slip Closure

Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow road to woodhall rbt- leave woodhall at 4th exit for A8 east- at rbt take 2nd exit - end

A8 Bargeddie Rbt to Showcase - Offside lane closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt) to A8 (Baillieston On Slip to Bargeddie Underbridge), E

Start time:24th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A8 Chapelhall South Rbt to Chapelhall North Rbt

Location:A8 (End 2 Way Slip Road to End Of Chalpelhall Wb On Slip) to A8 (Start Chapelhall Eb Off Slip to Sta

Start time:20th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 Chapellhall North to South Rbt - B799 Bo'ness Road

A8 EB Greenock Road Langbank Lane closure

Location:A8 (Inverclyde Cty Bdy to Langbank Rbt E/B Entry) to A8 (West Ferry Toll Int W/B On Slip to Langbank

Start time:3rd of January 2025, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A8 EB Greenock Rd to M8 Jct 31- Lane Closures

Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Langbank Rbt E/B Exit to West Ferry Toll Int E/B Off Slip), E

Start time:6th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 EB Greenock Road - Woodhall Rbt to West Ferry IC - Lane Closure

Location:A8 (Woodhall Rbt to Pt Glasgow Bdy) to M8 (Slip Off To A8 to Slip Entry From A8), Eastbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A8 EB Greenock Road - Newark Rbt to Woodhall Rbt - Road closure

Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Woodhall Rbt), Eastbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave Newark Rbt onto A761 - at rbt take 1st exit onto Glasgow Rd - at Woodhall Rbt follow signs

A8 Eastbound Baillieston Lights to Bargeddie Rbt - Progressive nearside & offside lane closures

Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to M73 (Off Slip From M73 to A8 Bailleston Rbt)

Start time:23rd of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

A8 Eastbound Bargeddie Roundabout to Eurocentral - Hard Shoulder Closure

Location:M73 (Off Slip From M73 to A8 Bailleston Rbt) to A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

A8 Eastbound Carnbroe off-slip -Total closure

Location:A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound

Start time:20th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 Eastbound Eurocentral North Rbt, A8 Eastbound Chapelhall North Rbt, B799 Bo'ness Road, B802 Woodhall Mill Road, Sykeside Road, Paddock Street, Park Place, Carnbroe Road, Sweethill Terrace.

A8 Eastbound Chaphall North Rbt from Bo'ness Road - Total closure

Location:A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 EB Chapelhall North to Newhouse - Bo'ness road, Lancaster Avenue, M73 Newhouse Rbt.

A8 Eastbound Eurocentral North Rbt - Inner ring closure

Location:A8 (Off-Slip Start to Eurocentral N.Rbt), Eastbound

Start time:23rd of January 2025, 8:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A8 Eastbound Eurocentral to Chapelhall approach - Total approach

Location:A8 (Eurocentral N.Rbt to Eb On Slip) to A8 (Woodhall Mill Rd (B802) to 2 Way Split), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Euro to Chapelhall Div - Townhead Avenue, McNeil Drive.

A8 Eastbound Newhouse - Nearside lane closure

Location:M8 (A73 Newhouse Rbt to On To M8 Eb) to M8 (Newhouse Interchange to End Of Ppp), Eastbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A8 Eastbound Shawhead on-slip - Total closure

Location:A8 (Start 2 Way Slip to Start 4 Lane) to A8 (Shawhead Overbridge to Carnbroe On Slip), Eastbound

Start time:20th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Shawhead on-slip, A8 Westbound Showcase off-slip, A8 Eastbound Shocase on-slip. A8 Eastbound

A8 Greenock Rd @ Kingston Rbt EB - Lane Closure

Location:A8 (Port Glasgow Western Rbt to Port Glasgow Northern Rbt) to A8 (Port Glasgow Northern Rbt to Port

Start time:23rd of December 2024, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A8 Greenock Rd Langbank EB - Lane Closure

Location:A8 (Inverclyde Cty Bdy to Langbank Rbt E/B Entry) to A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy

Start time:12th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A8 Greenock Rd Langbank WB - Lane Closure

Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound

Start time:12th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A8 Showcase on-slip Eastbound - Total closure

Location:A8 (2 Way Split to A752 Langmuir Rbt) to A8 (Bargeddie Underbridge to Shawhead Overbridge), Eastboun

Start time:24th of January 2025, 9:30am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Showcase on-slip, A8 Bargeddie Rbt & return Eastbound.

A8 WB Greenock Road Newark - Lane Closures

Location:A8 (Woodhall Rbt to Newark Rbt) to A8 (Newark Rbt to Port Glasgow Eastern Rbt), Westbound

Start time:8th of January 2025, 9:30am

Description:Works:
Trial hole investigation

Traffic Management:
Lane Closure.

A8 WB Langbank on slip - Slip Closure

Location:A8 (Langbank Rbt W/B Exit to Inverclyde Cty Bdy), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow B789 main rd- at jct take 1st left onto rbt- at rbt take 1st exit onto A8 west- end

A8 WB - M8 J31 to Woodhall Rbt - Lane Closures

Location:M8 (Slip From M8 Wb to Slip Entry From A8) to A8 (Woodhall Rbt to Woodhall Rbt), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

A8 WB Greenock Road Woodhall Rbt to Newark Rbt - Road Closure

Location:A8 (Woodhall Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave woodhall rbt onto Glasgow rd- at rbt take 2nd exit onto A761- end

A8 WB Rue End Street @ Cathcart Street Lane Closure

Location:A8 (B788 Jct to Bull Ring Rbt), Westbound

Start time:20th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A8 WB on Mainstreet to Rue End St - Lane closure

Location:A8 (Cartsdyke Rbt to Cartsburn St Rbt) to A8 (Cartsburn St Rbt to B788 Jct), Westbound

Start time:17th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A8 WB, Parklea Rd off slip - Slip Closure

Location:A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave woodhall rbt onto parklea rd- follow road- end

A8 WB, Parklea Rd on slip - Slip Closure

Location:A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
follow parklea rd onto woodhall rbt-leave woodhall rbt onto Glasgow rd- at rbt take 2nd exit onto A761- end

A8 Westbound Eurocentral to Bargeddie Roundabout - Hard Shoulder Closure

Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to M73 (Off Slip From M73 to A8 Bailleston Rbt), Westboun

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

A8 Westbound Eurocentral to Shawhead main line - Total closure

Location:A8 (Eurocentral S.Rbt to Wb On Slip Start) to A8 (Shawhead Overbridge to Bargeddie), Westbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
Townhead Avenue, McNeil Drive, B799, A775 Main Street, A775 Holytown Road, A775 Main Street, A721 Gartcosh Walk.

A8 Westbound Showcase on-slip - Total closure

Location:A8 (A752 Jct to 2 Way Split) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westbound

Start time:10th of January 2025, 10:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Off-slip, Langmuir Road, Coatbridge Road.

A8 Westbound Showcase to Bargeddie main line - Total closure

Location:A8 (Shawhead Overbridge to Bargeddie) to M73 (Off Slip From M73 to A8 Bailleston Rbt), Westbound

Start time:10th of January 2025, 10:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Off-slip, Langmuir Road, Coatbridge Road.

A8 Woodhall Rbt EB - Lane Closure

Location:A8 (Newark Rbt to Woodhall Rbt) to A8 (Woodhall Rbt to Pt Glasgow Bdy), Westbound

Start time:23rd of December 2024, 10:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A8 Woodhall Rbt WB - Lane Closure

Location:A8 (Pt Glasgow Bdy to Woodhall Rbt) to A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:23rd of December 2024, 10:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

A8(M) Eastbound Swinton Roundabout to Baillieston Roundabout - Hard Shoulder Closure

Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd) to A8 (Baillieston Int Rbt to Baillieston Int R

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

A8(M) Westbound Baillieston Roundabout to Swinton Roundabout - Hard Shoulder Closure

Location:A8 (Baillieston Rbt to Ravenswood Rd / Edinburgh Rd), Eastbound

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

A814 to M8 Kingston Bridge WB - Slip Closure

Location:M8 (A814 Exit to Entry M8 Wb), Westbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

Diversion Information:
A814 EB, North Street, St Vincent Street, A804, M8.

A82 Achintore Rd Fort William - Stop/Go Works

Location:A82 (Cemetery Entrance to Past Mercury M/Inn) to A82 (Past Mercury Inn to West End Rbt), Northbound

Start time:13th of January 2025, 9:30am

Description:Works:
Inspections

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Altsigh NB - TTL

Location:A82 (A887 Junction to 23ml Milestone), Northbound

Start time:22nd of January 2025, 8:00am

Description:Works:
Ecological Survey

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Altsigh SB - TTL

Location:A82 (A887 Junction to 23ml Milestone), Southbound

Start time:22nd of January 2025, 8:00am

Description:Works:
Ecological Survey

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Ardvorlich NB - TTL

Location:A82 (Loch Sloy Power Stat to Ardlui Station), Northbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Ardvorlich SB - TTL

Location:A82 (Loch Sloy Power Stat to Ardlui Station), Southbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Arvorlich NB - TTL

Location:A82 (Loch Sloy Power Stat to Ardlui Station), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Arvorlich SB - TTL

Location:A82 (Loch Sloy Power Stat to Ardlui Station), Southbound

Start time:20th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Ballchraggen to Urquhart Castle Dumnadrochit NB - TTL

Location:A82 (450m N Of Cobb Meml to Borlum Bridge) to A82 (12ml Milestone to Clansman Hotel), Northbound

Start time:6th of January 2025, 7:00am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Ballchraggen to Urquhart Castle Dumnadrochit SB - TTL

Location:A82 (12ml Milestone to Clansman Hotel) to A82 (450m N Of Cobb Meml to Borlum Bridge), Southbound

Start time:6th of January 2025, 7:00am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Blairannaich North of Tarbet NB - TTL

Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Blairannaich North of Tarbet SB - TTL

Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Southbound

Start time:20th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Bonnie Braes South of Inveruglas - Stop/Go Works

Location:A82 (Tarbet Jct to Loch Sloy Power Stat), Northbound

Start time:24th of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A82 Bridge of Orchy - Stop/Go Works

Location:A82 (Ms Coille B/Liath to Ms Clach A Bhein), Northbound

Start time:16th of January 2025, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Clachaig Inn South of Glencoe NB - Road Closure with Amnesties

Location:A82 (Start Crash Barrier to Rd To Clachaig Ho), Northbound

Start time:9th of March 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400

A82 Clachaig Inn South of Glencoe SB - Road Closure with Amnesties

Location:A82 (Start Crash Barrier to Rd To Clachaig Ho), Southbound

Start time:9th of March 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties.

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400

A82 Corran North of Onich NB - TTL

Location:A82 (A861 Corran Ferry Jct to Cemetery Entrance) to A82 (Cemetery Entrance to Past Mercury M/Inn), N

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Corran North of Onich SB - TTL

Location:A82 (A861 Corran Ferry Jct to Cemetery Entrance), Southbound

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Fort Augustus NB - Road Closure

Location:A82 (B862 Foyers Jct to Inchnacardoch Hotel), Northbound

Start time:20th of January 2025, 7:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
via A87 & A887

A82 Fort Augustus SB - Road Closure

Location:A82 (B862 Foyers Jct to Inchnacardoch Hotel), Northbound

Start time:20th of January 2025, 7:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
via A87 & A887

A82 Glencoe to Ballachulish NB - TTL

Location:A82 (Rd To Clachaig Ho to 09740) to A82 (S Ballachulish Rbt to Kinlochleven Junc B863), Northbound

Start time:13th of January 2025, 7:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Glencoe to Ballachulish SB - TTL

Location:A82 (Rd To Clachaig Ho to 09740) to A82 (S Ballachulish Rbt to Kinlochleven Junc B863), Southbound

Start time:13th of January 2025, 7:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Glenurquhart Rd to Kenneth St Inverness - Vergeworks SS

Location:A82 (Tomnahurich Br. to B862 Kenneth St.) to A82 (Kenneth St. to Telford St Rbt), Northbound

Start time:6th of January 2025, 12:00am

Description:Works:
Inspections

Traffic Management:
No Obstruction on Carriageway or Footway.

A82 Highland Boundary Loch Tulla - Stop/Go Works

Location:A82 (Creagan Criche Milestone to Highland Bdy), Northbound

Start time:14th of January 2025, 9:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A82 Inverarnan NB - Stop/Go Works

Location:A82 (Ardlui to Stirling/Argyle Bdy), Northbound

Start time:24th of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A82 Inverbeg NB - Stop/Go Works

Location:A82 (Luss Access Nth to Inverbeg Bridge), Northbound

Start time:3rd of January 2025, 10:00am

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A82 Invergloy NB - TTL

Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Northbound

Start time:23rd of December 2024, 8:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Invergloy SB - TTL

Location:A82 (Glengloy Jct to 200m N Of 17m Milestone), Southbound

Start time:23rd of December 2024, 8:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Inverhervie North of Crianlarich NB - TTL

Location:A82 (Derest Sign to Euich Bridge) to A82 (Euich Bridge to Fillan Bridge), Northbound

Start time:27th of December 2024, 8:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A82 Inverhervie North of Crianlarich SB - TTL

Location:A82 (Euich Bridge to Fillan Bridge) to A82 (Derest Sign to Euich Bridge), Southbound

Start time:27th of December 2024, 8:00am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A82 Kingshouse NB - TTL

Location:A82 (White Corries to Junc To Glenetive) to A82 (Junc To Glenetive to Start Crash Barrier), Northbou

Start time:20th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Kingshouse SB - TTL

Location:A82 (White Corries to Junc To Glenetive) to A82 (Junc To Glenetive to Start Crash Barrier), Southbou

Start time:20th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Laggan NB - TTL

Location:A82 (Culvert Past Layby to Laggan Swing Br), Northbound

Start time:23rd of January 2025, 7:00am

Description:Works:
Parapet Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Laggan SB - TTL

Location:A82 (Culvert Past Layby to Laggan Swing Br), Southbound

Start time:23rd of January 2025, 7:00am

Description:Works:
Parapet Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Letterfinlay NB - TTL

Location:A82 (200m N Of 17m Milestone to L/Findlay North), Northbound

Start time:9th of January 2025, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Letterfinlay SB - TTL

Location:A82 (200m N Of 17m Milestone to L/Findlay North), Southbound

Start time:9th of January 2025, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Luss NB - TTL

Location:A82 (Luss Access Sth to Luss Bridge) to A82 (Luss Access Nth to Inverbeg Bridge), Northbound

Start time:6th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Luss SB - TTL

Location:A82 (Luss Access Nth to Inverbeg Bridge) to A82 (Luss Access Sth to Luss Bridge), Southbound

Start time:6th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 NB Dumbarton Road - Lane Closure with Diverson

Location:A82 (Dunglass Roundabout to A914 Dumbuck) to A82 (A914 Dumbuck to Greenhead Road), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

Diversion Information:
Access from A82 Dumbarton Road to A814 Glasgow Road will be closed during off peak hours (09.30-15.30). Below diversion route will be in place for all vehicles including HGV.
Traffic will continue West on the A82 > Turn left onto Greenhead Road > Re-join A814 Glasgow Road at Greenhead Road junction.

A82 Nevis Rnbt Fort William - Convoy Works

Location:A82 (Nevis Br Mini Rbt to Nevis Br Mini Rbt), Southbound

Start time:16th of March 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A82 SB Stirling Road - Lane Closure

Location:A82 (Barloan Rbt to Greenhead Rd) to A82 (Greenhead Rd to A914 Dumbuck), Southbound

Start time:30th of December 2024, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

A82 Shorelands Lodges North of Fort Augustus NB - TTL

Location:A82 (Inchnacardoch Hotel to 1st L B4 C/Site), Northbound

Start time:13th of January 2025, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Shorelands Lodges North of Fort Augustus SB - TTL

Location:A82 (Inchnacardoch Hotel to 1st L B4 C/Site), Southbound

Start time:13th of January 2025, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Spean Bridge NB - TTL

Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Northbound

Start time:16th of January 2025, 7:00am

Description:Works:
Parapet Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Spean Bridge NB - TTL

Location:A82 (A86 Jct to B8004 Jct), Northbound

Start time:13th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Spean Bridge SB - TTL

Location:A82 (Spean Br Sign to A86 Jct) to A82 (A86 Jct to B8004 Jct), Southbound

Start time:16th of January 2025, 7:00am

Description:Works:
Parapet Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Spean Bridge SB - TTL

Location:A82 (A86 Jct to B8004 Jct), Southbound

Start time:13th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A82 Tyndrum - Stop/Go Works

Location:A82 (Fillan Bridge to A85 Jct), Southbound

Start time:3rd of January 2025, 12:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control.

A828 Beinn Sgluish North of Appin NB - Road Closure with Amnesties

Location:A828 (Milestone to Mile Stone), Northbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
No Diversion - Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 & 0400

A828 Beinn Sgluish North of Appin SB - Road Closure with Amnesties

Location:A828 (Milestone to Mile Stone), Southbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
No Diversion - Amnesties at 2000, 2100, 2200, 2300, 0000, 0200 & 0400

A828 Glenachulish West of Ballachulish NB - TTL

Location:A828 (Inshaig Br to Under Ballachulish Br), Northbound

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Glenachulish West of Ballachulish SB - TTL

Location:A828 (Inshaig Br to Under Ballachulish Br), Southbound

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Ledaig NB - TTL

Location:A828 (Nth Side Connel Br to Ledaig House), Northbound

Start time:10th of January 2025, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A828 Ledaig SB - TTL

Location:A828 (Nth Side Connel Br to Ledaig House), Southbound

Start time:10th of January 2025, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Aray Bridge East of Inveraray NB - TTL

Location:A83 (Shira Bridge to A819 Jct), Northbound

Start time:15th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Aray Bridge East of Inveraray SB - TTL

Location:A83 (Shira Bridge to A819 Jct), Southbound

Start time:15th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Ardgarten South of Arrochar NB - Road Closure with Amnesties

Location:A83 (Ardgarten Caravan Pk to Jct B828), Northbound

Start time:14th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0100 & 0300

A83 Ardgarten South of Arrochar SB - Road Closure with Amnesties

Location:A83 (Ardgarten Caravan Pk to Jct B828), Southbound

Start time:14th of January 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties.

Diversion Information:
NO DIVERSION
Amnesties at 2100, 2200, 2300, 0100 & 0300

A83 Arrochar - Stop/Go Works

Location:A83 (Tarbet to A814 Jct) to A83 (A814 Jct to R. Loin O/Bridge), Southbound

Start time:21st of January 2025, 10:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A83 Arrochar - Stop/Go Works

Location:A83 (A814 Jct to R. Loin O/Bridge) to A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Southbound

Start time:23rd of January 2025, 10:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A83 Auchindrain South of Inveraray SB - TTL

Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Southbound

Start time:3rd of February 2025, 7:00am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Douglas Water South of Inveraray - Convoy Works

Location:A83 (Uc2 Barn Brae to Jct Auchindrain), Northbound

Start time:13th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A83 Glenbarr NB - TTL

Location:A83 (Killiegruer Junc to Argyll Hotel) to A83 (Glenbarr Junc to Killegruer Junc), Northbound

Start time:14th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Glenbarr SB - TTL

Location:A83 (Glenbarr Junc to Killegruer Junc) to A83 (Killiegruer Junc to Argyll Hotel), Southbound

Start time:14th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Kilmory Lochgilphead NB - TTL

Location:A83 (Kilmory Castle Rbt to 30mph Lochgilphead South), Northbound

Start time:14th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Kilmory Lochgilphead SB - TTL

Location:A83 (Kilmory Castle Rbt to 30mph Lochgilphead South), Southbound

Start time:14th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 OMR Rest and Be Thankful NB - TTL

Location:A83 (Diversion Route Start to Diversion Route End), Northbound

Start time:6th of January 2025, 7:00am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A83 OMR Rest and Be Thankful SB - TTL

Location:A83 (Diversion Route Start to Diversion Route End), Southbound

Start time:6th of January 2025, 7:00am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A83 Succoth Arrochar NB - TTL

Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Northbound

Start time:13th of January 2025, 8:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A83 Succoth Arrochar SB - TTL

Location:A83 (R. Loin O/Bridge to Ardgarten Caravan Pk), Southbound

Start time:13th of January 2025, 8:00am

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A83 West Loch Tarbert NB - TTL

Location:A83 (C23 Glenakill Jct to B8026 W Loch Pier), Northbound

Start time:13th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A83 West Loch Tarbert SB - TTL

Location:A83 (C23 Glenakill Jct to B8026 W Loch Pier), Southbound

Start time:13th of January 2025, 7:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A830 Arieniskill Lochailort - Stop/Go Works

Location:A830 (Br E. Of Loch Eilt to Boatshed W. L.Eilt) to A830 (Boatshed W. L.Eilt to A861 Junction), Westb

Start time:13th of January 2025, 10:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A830 Banavie - Convoy Works

Location:A830 (Corpach Roundabout to B8004 Banavie Junction), Eastbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A830 Lubfearn North of Inchbae WB - TTL

Location:A835 (Inchbae Lodge to 150m Past Black Br), Westbound

Start time:16th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A830 Ranochan EB - TTL

Location:A830 (Br E. Of Loch Eilt to Boatshed W. L.Eilt), Eastbound

Start time:16th of January 2025, 8:00am

Description:Works:
Ecological Survey

Traffic Management:
Portable Traffic Lights (TTLS).

A830 Ranochan WB - TTL

Location:A830 (Br E. Of Loch Eilt to Boatshed W. L.Eilt), Westbound

Start time:16th of January 2025, 8:00am

Description:Works:
Ecological Survey

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Achnaclerach West of Gorstan - Vergworks

Location:A835 (A832 Gorstan Jct to Silverbridge) to A835 (Silverbridge to Inchbae Lodge), Westbound

Start time:13th of January 2025, 7:00am

Description:Works:
Drainage Works, Structural Repairs

Traffic Management:
No Obstruction on Carriageway or Footway.

A835 Contin EB - Road Closure

Location:A835 (Kinnahaird to A834 Jct), Eastbound

Start time:7th of January 2025, 7:00pm

Description:Works:
Utility Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion EB via A834 to Dingwall, then A862 to rejoin A835 Maryburgh Rnbt, WB reverse

A835 Contin WB - Road Closure

Location:A835 (Kinnahaird to A834 Jct), Westbound

Start time:7th of January 2025, 7:00pm

Description:Works:
Utility Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion EB via A834 to Dingwall, then A862 to rejoin A835 Maryburgh Rnbt, WB reverse

A835 Garve EB - TTL

Location:A835 (1 Mile West Of Tarvie to Garve Level Xing), Eastbound

Start time:13th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Garve WB - TTL

Location:A835 (1 Mile West Of Tarvie to Garve Level Xing), Westbound

Start time:13th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Gorstan EB - TTL

Location:A835 (A832 Gorstan Jct to Silverbridge) to A835 (Garve Level Xing to A832 Gorstan Jct), Eastbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Gorstan WB - TTL

Location:A835 (Garve Level Xing to A832 Gorstan Jct) to A835 (A832 Gorstan Jct to Silverbridge), Westbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Lael Forest West of Braemore EB - TTL

Location:A835 (A832 Braemore Jct to Inverlael Farm), Eastbound

Start time:23rd of December 2024, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A835 Lael Forest West of Braemore WB - TTL

Location:A835 (A832 Braemore Jct to Inverlael Farm), Westbound

Start time:23rd of December 2024, 7:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Callander EB - TTL

Location:A84 (Start Main St to A81 Jct) to A84 (Station Rd to Derest Callander Nth), Eastbound

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Callander WB - TTL

Location:A84 (Start Main St to A81 Jct) to A84 (Station Rd to Derest Callander Nth), Westbound

Start time:13th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Main St Callander NB - TTL

Location:A84 (A81 Jct to Station Rd) to A84 (Station Rd to Derest Callander Nth), Northbound

Start time:6th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Main St Callander SB - TTL

Location:A84 (Station Rd to Derest Callander Nth) to A84 (A81 Jct to Station Rd), Southbound

Start time:6th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Straid House South of Callander NB - TTL

Location:A84 (W Coillechat Rd to Cambusbeg Fm Rd), Northbound

Start time:10th of February 2025, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A84 Straid House South of Callander SB - TTL

Location:A84 (W Coillechat Rd to Cambusbeg Fm Rd), Southbound

Start time:10th of February 2025, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Achnacloich East of Connel EB - TTL

Location:A85 (Jct Ardnaskie Wood to A85 Jct), Eastbound

Start time:14th of January 2025, 8:00am

Description:Works:
Traffic Loops

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Achnacloich East of Connel WB - TTL

Location:A85 (Jct Ardnaskie Wood to A85 Jct), Westbound

Start time:14th of January 2025, 8:00am

Description:Works:
Traffic Loops

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Arinbea West of Tyndrum - Stop/Go Works

Location:A85 (Stirling/Argyle Bndy to M.S Nr Arinabea), Westbound

Start time:24th of December 2024, 10:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A85 Arinbea West of Tyndrum EB - TTL

Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Eastbound

Start time:31st of December 2024, 12:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Arinbea West of Tyndrum WB - TTL

Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Westbound

Start time:31st of December 2024, 12:00pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Arrivain EB - TTL

Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Eastbound

Start time:23rd of December 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Arrivain East of Dalmally EB - TTL

Location:A85 (Milestone Nr Arivain to Mile Stone), Eastbound

Start time:31st of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Arrivain East of Dalmally WB - TTL

Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound

Start time:31st of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Arrivain WB - TTL

Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain), Westbound

Start time:23rd of December 2024, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Arrivain West of Tyndrum EB - TTL

Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain) to A85 (Milestone Nr Arivain to Mile Stone), Eastbound

Start time:13th of January 2025, 7:00am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Arrivain West of Tyndrum WB - TTL

Location:A85 (M.S Nr Arinabea to Milestone Nr Arivain) to A85 (Milestone Nr Arivain to Mile Stone), Westbound

Start time:13th of January 2025, 7:00am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Balgowan Forbrae EB - TTL

Location:A85 (30 Mph West Of Methven to U4 To Keillour (East)), Eastbound

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Balgowan Forbrae WB - TTL

Location:A85 (30 Mph West Of Methven to U4 To Keillour (East)), Westbound

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Comrie - Event

Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie) to A85 (30 Mph W Of Comrie to U197 Dalchonzie), Westbou

Start time:31st of December 2024, 10:00pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

A85 Crianlarich EB - Road Closure

Location:A85 (A82 Junction to Crianlarich Nrth R/About), Eastbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
A82 > Glenfalloch Road & Vice Versa

A85 Crianlarich WB - Road Closure

Location:A85 (A82 Junction to Crianlarich Nrth R/About), Westbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
A82 > Glenfalloch Road & Vice Versa

A85 Cruachan EB - TTL

Location:A85 (School Lochawe to M.S. Jct Lorn Area), Eastbound

Start time:20th of January 2025, 9:00am

Description:Works:
Ecological Survey

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Cruachan WB - TTL

Location:A85 (School Lochawe to M.S. Jct Lorn Area), Westbound

Start time:20th of January 2025, 9:00am

Description:Works:
Ecological Survey

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Dunbeg EB - TTL

Location:A85 (A85 Jct to Sewage Plant Dunbeg), Eastbound

Start time:17th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Dunbeg WB - TTL

Location:A85 (A85 Jct to Sewage Plant Dunbeg), Westbound

Start time:17th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Dunollie Rd Oban EB - Road Closure with Amnesties

Location:A85 (Jct Croft Rd to Jct Corran Park Mini Rbt) to A85 (Lodge to Jct Croft Rd), Eastbound

Start time:2nd of February 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION -

Amnesties at 9,10,11,12,02,04.

A85 Dunollie Rd Oban WB - Road Closure with Amnesties

Location:A85 (Lodge to Jct Croft Rd) to A85 (Jct Croft Rd to Jct Corran Park Mini Rbt), Westbound

Start time:2nd of February 2025, 8:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION -

Amnesties at 9,10,11,12,02,04.

A85 Gilmerton EB - TTL

Location:A85 (30 Mph E Of Gilmerton to A822 Junction) to A85 (U7 Milton Of Cultoquehy to 30 Mph E Of Gilmerto

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Gilmerton WB - TTL

Location:A85 (U7 Milton Of Cultoquehy to 30 Mph E Of Gilmerton) to A85 (30 Mph E Of Gilmerton to A822 Junctio

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Glen Lochy East of Dalmally EB - TTL

Location:A85 (Milestone Nr Arivain to Mile Stone), Eastbound

Start time:31st of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Glen Lochy East of Dalmally WB - TTL

Location:A85 (Milestone Nr Arivain to Mile Stone), Westbound

Start time:31st of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Glen Ogle North of Lochearnhead EB - TTL

Location:A85 (Derest Sign to Stone Culvert), Eastbound

Start time:30th of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Glen Ogle North of Lochearnhead WB - TTL

Location:A85 (Derest Sign to Stone Culvert), Westbound

Start time:30th of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Huntingtower EB - TTL

Location:A85 (U45 Ruthvenfield to C410 Huntingtower) to A85 (A85 Rbt West Of A9 to U45 Ruthvenfield), Eastbou

Start time:8th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Huntingtower WB - TTL

Location:A85 (A85 Rbt West Of A9 to U45 Ruthvenfield) to A85 (U45 Ruthvenfield to C410 Huntingtower), Westbou

Start time:8th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Lix Toll Killin EB - TTL

Location:A85 (Glenoglehead Cott to A827 Jct), Eastbound

Start time:30th of December 2024, 10:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Lix Toll Killin WB - TTL

Location:A85 (Glenoglehead Cott to A827 Jct), Westbound

Start time:30th of December 2024, 10:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS) (30mph)

A85 Lochearnhead - MLC

Location:A85 (40 Mph Signs to A84 Junction), Westbound

Start time:24th of December 2024, 10:00am

Description:Works:
Gully Emptying

Traffic Management:
Mobile Lane Closures (30mph)

A85 Main Street Methven - Scaffold

Location:A85 (Church Road to College Road), Eastbound

Start time:13th of January 2025, 7:00am

Description:Works:
Skip/Scaffold

Traffic Management:
No Obstruction on Carriageway or Footway.

A85 Methven EB - TTL

Location:A85 (30 Mph West Of Methven to U4 To Keillour (East)) to A85 (James Street to 30 Mph West Of Methven

Start time:14th of January 2025, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 Methven WB - TTL

Location:A85 (James Street to 30 Mph West Of Methven) to A85 (30 Mph West Of Methven to U4 To Keillour (East)

Start time:14th of January 2025, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A85 North of Lochearnhead - Stop/Go Works

Location:A85 (Derest Sign to Stone Culvert), Westbound

Start time:3rd of January 2025, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Stop/Go Boards Traffic Control (30mph)

A85 Stronmilchan Junction East of Lochawe EB - Road Closure with Amnesties

Location:A85 (A819 Junction to School Lochawe), Eastbound

Start time:12th of February 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400

A85 Stronmilchan Junction East of Lochawe WB - Road Closure with Amnesties

Location:A85 (A819 Junction to School Lochawe), Westbound

Start time:12th of February 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure with Amnesties (10mph)

Diversion Information:
NO DIVERSION

Amnesties at 2000, 2100, 2200 , 2300, 0000, 0200 & 0400

A85 West Lodge Estate Comrie EB - TTL

Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie), Eastbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Gully Emptying

Traffic Management:
Portable Traffic Lights (TTLS).

A85 West Lodge Estate Comrie WB - TTL

Location:A85 (U198 Pb At Quoig to 30 Mph E Of Comrie), Westbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Gully Emptying

Traffic Management:
Portable Traffic Lights (TTLS).

A86 Kinloch Laggan West of Strathmashie -Stop/Go Works

Location:A86 (Ardverikie Hse Acc to Aberarder Acc), Westbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Stop/Go Boards Traffic Control.

A86 Kinloch Laggan West of Strathmashie EB - TTL

Location:A86 (Strathmashie Hse Sth Acc to Ardverikie Hse Acc), Eastbound

Start time:27th of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A86 Kinloch Laggan West of Strathmashie WB - TTL

Location:A86 (Strathmashie Hse Sth Acc to Ardverikie Hse Acc), Westbound

Start time:27th of December 2024, 8:00am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Bun Loyne EB - TTL

Location:A87 (Inverness Dist Bdy to A887 Jct), Eastbound

Start time:9th of January 2025, 7:00am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A87 Bun Loyne WB - TTL

Location:A87 (Inverness Dist Bdy to A887 Jct), Westbound

Start time:9th of January 2025, 7:00am

Description:Works:
Barrier Repair

Traffic Management:
Portable Traffic Lights (TTLS).

A887 Livishie Power Station Dundreggan EB - TTL

Location:A887 (Dund'An Dam Acc Rd to U137 Inverwick Jct), Eastbound

Start time:23rd of January 2025, 7:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A887 Livishie Power Station Dundreggan WB - TTL

Location:A887 (Dund'An Dam Acc Rd to U137 Inverwick Jct), Westbound

Start time:23rd of January 2025, 7:00am

Description:Works:
Inspections

Traffic Management:
Portable Traffic Lights (TTLS).

A889 Dochaid Abhacain Dalwhinnie - TTL

Location:A889 (A9 Jct to Speed Rest), Southbound

Start time:2nd of June 2025, 7:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Aberuthven- Convoy S/B

Location:A9 (Aberuthven Jct to Abbey Rd Br.), Southbound

Start time:15th of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Convoy Working.

A9 Aberuthven- Lane Closure/Convoy N/B

Location:A9 (Abbey Rd Br. to A824 Jct Aberuthven), Northbound

Start time:14th of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
14/11/2024 - Lane Closure, 15/11/2024 - Lane Closure, 15/11/2024 - Convoy Working, 16/11/2024 - Convoy Working, 16/11/2024 - Convoy Working, 17/11/2024 - Convoy Working

A9 Ballachraggan Farm Alness NB - Road Closure

Location:A9 (B9176 Struie Jct to B817 Dalmore Jct), Northbound

Start time:19th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
DIVERSION VIA B9176 + B817

A9 Ballachraggan Farm Alness SB - Road Closure

Location:A9 (B9176 Struie Jct to B817 Dalmore Jct), Southbound

Start time:19th of January 2025, 7:00pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
DIVERSION VIA B9176 + B817

A9 Ballinluig NB - Convoy

Location:A9 (Jct (R) To Guay to Start Of Dual Cway) to A9 (Start Of Dual C/Way to A827 Jct Nb), Northbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Convoy Working (10mph)

A9 Ballinluig NB - Lane Closure

Location:A9 (Jct (R) To Guay to Start Of Dual Cway) to A9 (Start Of Dual C/Way to A827 Jct Nb), Northbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Lane Closure (50mph)

A9 Ballinluig Off Slip NB - Full Slip Closure

Location:A9 (Slip Off From A9 To A827 Rbt to A827 Rbt), Northbound

Start time:14th of January 2025, 7:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
Follow A9 Pitlochry North to A924 junction, thereafter travel south on A9

A9 Berridale NB - TTL

Location:A9 (Snowgates Berriedale to P.O. Berriedale) to A9 (P.O. Berriedale to S Jct Newport), Northbound

Start time:27th of December 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Berridale SB - TTL

Location:A9 (P.O. Berriedale to S Jct Newport) to A9 (Snowgates Berriedale to P.O. Berriedale), Southbound

Start time:27th of December 2024, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Blackford- lane Closure S/B

Location:A9 (B8081 Blackford to U/C To Tarneybackle), Southbound

Start time:27th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A9 Brora - Planned Event

Location:A9 (D'Geon Pk Rd to Fountain Sq) to A9 (Mill Jct to S Dalchalm Jct), Northbound

Start time:1st of January 2025, 4:30pm

Description:Works:
Planned Event

Traffic Management:
Road Closure.

Diversion Information:
via Lower Brora & Harbour Road, Brora

A9 Carrbridge NB - TTL

Location:A9 (River Dulnain to A938 Carrbridge Jct), Northbound

Start time:14th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Carrbridge SB - TTL

Location:A9 (River Dulnain to A938 Carrbridge Jct) to A9 (End Of Climbing Lane to River Dulnain), Southbound

Start time:14th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Crossgates NB - Lane closure

Location:A9 (Broxden Rbt to Burnside Lodge), Northbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Crossgates to Forgandenny, Forteviot SB - Lane closure

Location:A9 (Broxden Rbt to Burnside Lodge) to A9 (Burnside Lodge to Aberuthven Jct), Southbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Dalguise North of Dunkeld - Vergeworks

Location:A9 (B898 Jct to Jct (R) To Guay), Northbound

Start time:23rd of January 2025, 7:30pm

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Dalguise North of Dunkeld NB - TTL

Location:A9 (B898 Jct to Jct (R) To Guay), Northbound

Start time:23rd of January 2025, 7:30pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalguise North of Dunkeld SB - TTL

Location:A9 (B898 Jct to Jct (R) To Guay), Southbound

Start time:23rd of January 2025, 7:30pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnamein South of Drumochter NB - TTL

Location:A9 (B847 Calvine Jct to Start Dual Calvine), Northbound

Start time:20th of January 2025, 7:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnamein South of Drumochter SB - TTL

Location:A9 (B847 Calvine Jct to Start Dual Calvine), Southbound

Start time:20th of January 2025, 7:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnamien NB - TTL

Location:A9 (B847 Calvine Jct to Start Dual Calvine), Northbound

Start time:23rd of December 2024, 7:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dalnamien SB - TTL

Location:A9 (B847 Calvine Jct to Start Dual Calvine), Southbound

Start time:23rd of December 2024, 7:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Daviot SB - Lane Closure

Location:A9 (B9177 Jct to B851 Culloden Jct), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

A9 Delny North of Tomich - Stop/Go Works

Location:A9 (Smelter Junction Tomich to B817 Kildary Junction), Northbound

Start time:10th of February 2025, 10:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A9 Dowally North of Dunkeld NB - TTL

Location:A9 (B898 Jct to Jct (R) To Guay), Northbound

Start time:14th of January 2025, 7:30pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dowally North of Dunkeld SB - TTL

Location:A9 (B898 Jct to Jct (R) To Guay), Southbound

Start time:14th of January 2025, 7:30pm

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Dunfallandy Pitlochry - Vergeworks

Location:A9 (End Of Dual to Start Of Dual), Northbound

Start time:20th of January 2025, 9:00am

Description:Works:
Drainage Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Essangal Blair Atholl NB - TTL

Location:A9 (End Of Slip to Bruar Jct Nb), Northbound

Start time:10th of February 2025, 6:01am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Essangal Blair Atholl SB - TTL

Location:A9 (End Of Slip to Bruar Jct Nb) to A9 (A9 On Slip (Eb) to End Of Slip), Southbound

Start time:10th of February 2025, 6:01am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Forgandenny, Crossgates NB - Lane closure

Location:A9 (A824 Jct Aberuthven to Burnside Lodge) to A9 (Burnside Lodge to Broxden Rbt), Northbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Greenloaning NB - Lane closure

Location:A9 (Council Bdy to A822 Jct) to A9 (A822 Jct to U/C To Tarneybackle), Northbound

Start time:23rd of December 2024, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A9 Greenloaning NB- Lane closure

Location:A9 (A822 Jct to U/C To Tarneybackle), Southbound

Start time:22nd of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A9 Inveralmond Rnbt Perth to Luncarty NB - Lane Closure

Location:A9 (End Dual Cway to Jct (R) To Luncarty), Northbound

Start time:13th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure (50mph)

A9 Inveralmond Rnbt Perth to Luncarty SB - Lane Closure

Location:A9 (End Dual Cway to Jct (R) To Luncarty) to A9 (End Dual Cway to Inveralmond Rbt), Southbound

Start time:13th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Lane Closure (50mph)

A9 Keir to Stockbridge NB - Lane closure

Location:A9 (Keir Rbt to Off Slip To A820) to A9 (A820 O'Bridge to On Slip From A820), Northbound

Start time:12th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Keir to Stockbridge SB - Lane closure

Location:A9 (Off Slip To A820 to A820 O'Bridge) to A9 (On Slip From A820 to Keir Rbt), Southbound

Start time:12th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Killiecrankie NB - TTL

Location:A9 (End Dual Nb to Slip To Blair Atholl Nb), Northbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Killiecrankie SB - TTL

Location:A9 (End Dual Nb to Slip To Blair Atholl Nb), Southbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Filter Drain

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Killiecrankie Viaduct NB - Lane Closure

Location:A9 (St Dual Nth Faskally to End Dual Nb), Northbound

Start time:5th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

A9 Kindallachan South of Ballinluig - Vergeworks

Location:A9 (Jct (R) To Guay to Start Of Dual Cway), Northbound

Start time:17th of January 2025, 7:30pm

Description:Works:
Third Party Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Luncarty SB - Lane Closure

Location:A9 (End Dual Cway to Jct (R) To Luncarty) to A9 (End Dual Cway to Inveralmond Rbt), Southbound

Start time:31st of December 2024, 8:00am

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure (50mph)

A9 Moy Rail South of Moy NB - TTL

Location:A9 (B9154 Moy Jn to Start 3 Lane), Northbound

Start time:20th of January 2025, 7:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Moy Rail South of Moy SB - TTL

Location:A9 (B9154 Moy Jn to Start 3 Lane), Southbound

Start time:20th of January 2025, 7:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Navidale Helmsdale - Vergeworks

Location:A9 (Old Caithness Road to Navidale Rbt), Northbound

Start time:13th of January 2025, 7:00am

Description:Works:
Drainage Works

Traffic Management:
No Obstruction on Carriageway or Footway.

A9 Nigg Rnbt NB - Lane Closure

Location:A9 (Glastullich Roundabout to Glastullich Roundabout) to A9 (Glastullich Roundabout to End Of Climbi

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Nigg Rnbt South of Tain SB - Narrow Lanes

Location:A9 (Glastullich Roundabout to Glastullich Roundabout), Southbound

Start time:10th of January 2025, 8:00am

Description:Works:
Lighting Works

Traffic Management:
Road Narrowing (Two Way Working).

A9 Pitlochry NB - Lane Closure

Location:A9 (Entry Slip From A924 to A827 Jct) to A9 (A924 Off Slip to End Of Dual Cway), Northbound

Start time:30th of December 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure (50mph)

A9 Pitlochry NB - TTL

Location:A9 (Start Of Dual Cway to Entry Slip From A924) to A9 (End Of Dual to Start Of Dual), Northbound

Start time:30th of December 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Pitlochry SB - TTL

Location:A9 (Start Of 2 Lane Slip to End Of 2 Way Slip) to A9 (End Of Dual to Start Of Dual), Southbound

Start time:30th of December 2024, 8:00am

Description:Works:
Carriageway Patching

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Raigmore Onlsip SB - Slip Closure

Location:A9 (Raigmore Interchange Roundabout to Raigmore Interchange Roundabout) to A9 (A96 Raigmore Rbt to O

Start time:13th of January 2025, 8:00pm

Description:Works:
Drainage Works

Traffic Management:
Road Closure.

Diversion Information:
Traffic diverted up to Longman Roundabout and back A9 SB.

A9 Ralia South of Kingussie NB - Lane Closure

Location:A9 (B9150 Newtonmore Jct to Start Of Climbing Lane) to A9 (Start Of Climbing Lane to End Of Climbing

Start time:7th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

A9 Roadside North of Georgemas Jnct - Stop/Go Works

Location:A9 (A882 Jct Georgemas to Jct Hilliclay), Northbound

Start time:12th of February 2025, 10:00am

Description:Works:
Pavement Surveys

Traffic Management:
Stop/Go Boards Traffic Control.

A9 SB Crossgates SB - Lane closure

Location:A9 (Broxden Rbt to Burnside Lodge), Southbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Boundary Fence Repairs

Traffic Management:
Lane Closure.

A9 Skiach Services Alness NB - TTL

Location:A9 (B817 Jct to B9176 Struie Jct) to A9 (B9176 Struie Jct to B817 Dalmore Jct), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Skiach Services Alness SB - TTL

Location:A9 (B9176 Struie Jct to B817 Dalmore Jct) to A9 (B817 Jct to B9176 Struie Jct), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Lighting Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Stockbridge on Slip Lane Closure

Location:A9 (A820 Jct to On Slip To A9), Northbound

Start time:8th of January 2025, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Lane Closure.

A9 Stockbridge, Dunblane - Lane 1 S/B closure

Location:A9 (A820 O'Bridge to On Slip From A820), Southbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Trial hole investigation

Traffic Management:
Lane Closure (50mph)

Diversion Information:
A820 into Dunblane turn right onto B8033 to Keir Rbt

A9 Stockbridge, Dunblane - S/B on slip closure

Location:A9 (A820 O'Bridge to On Slip From A820), Southbound

Start time:13th of January 2025, 7:30pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure (50mph)

Diversion Information:
A820 into Dunblane turn right onto B8033 to Keir Rbt

A9 Tomatin NB - Lane Closure

Location:A9 (Start Dual C'Way to R Findhorn Br) to A9 (R Findhorn Br to Start Single C'Way), Northbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

A9 Tummel Jnct Pitlochry - Convoy Works

Location:A9 (End Of Dual to Start Of Dual), Northbound

Start time:23rd of January 2025, 7:00pm

Description:Works:
Lining Works, Resurfacing

Traffic Management:
Convoy Working (10mph)

A9 Tummel Pitlochry NB - TTL

Location:A9 (End Of Dual to Start Of Dual), Northbound

Start time:6th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Tummel Pitlochry SB - TTL

Location:A9 (End Of Dual to Start Of Dual), Southbound

Start time:6th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A9 Whitemoss , Aberuthven NB - Lane closure

Location:A9 (Abbey Rd Br. to A824 Jct Aberuthven), Northbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A9 Whitemoss , Aberuthven SB - Lane closure

Location:A9 (Aberuthven Jct to Abbey Rd Br.), Southbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A90 / A982 Jct, Peterhead. N/B TTL's

Location:A90 (A950 Rbt to A982 North Rd) to A90 (A982 North Rd to Jn L Kirktown), Northbound

Start time:9th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A90 43 Cross St Fraserburgh. SB - TTL

Location:A90 (Jn X Commerce St to Jct A98 High St), Southbound

Start time:7th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Ellon Signage Only N/B

Location:A90 (Ellon Rbt (N) to Ellon Rbt (N)) to A90 (Ellon Roundabout North to Jcn (L) To Leys), Northbound

Start time:21st of January 2025, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Glendoick- Lane Closure N/B

Location:A90 (Off Slip B958 to Pitroddie Fm Jct), Northbound

Start time:20th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A90 Glendoick- Lane Closure S/B

Location:A90 (Pitroddie Jct to B958 Glencarse), Southbound

Start time:20th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

A90 Invernettie- Diversion Signage- N/B

Location:A90 (Invernettie Rbt to A950 Rbt), Northbound

Start time:6th of January 2025, 7:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A90 Kinfauns- Lane Closure N/B

Location:A90 (Kinfauns Jct to Off Slip B958) to M90 (On Slip From A90 to Scconieburn O'Bridge), Northbound

Start time:24th of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A90 Kingsway east NB - Lane closure

Location:A90 (On Slip From Clep Rd to Strathmartine Rd Rbt) to A90 (Old Gamis Rd Rbt to 2 To 3 Lane C/Way), N

Start time:6th of January 2025, 7:30pm

Description:Works:
Pedestrian Crossing works

Traffic Management:
Lane Closure.

A90 Kingsway east SB - Lane closure

Location:A90 (On Slip From Clep Rd to Strathmartine Rd Rbt) to A90 (Old Gamis Rd Rbt to 2 To 3 Lane C/Way), S

Start time:6th of January 2025, 7:30pm

Description:Works:
Pedestrian Crossing works

Traffic Management:
Lane Closure.

A90 Millhill, St Combs, Crimmond - Road Closure

Location:A90 (Jn R Starnafin to Jn R B9033 St.Combs), Southbound

Start time:12th of January 2025, 7:30pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Exit the A90 onto the A952 to Mintlaw then the A950 returning to the A90 at Peterhead.

A90 Millhill, St Combs, Crimmond - Road Closure

Location:A90 (Jn R Starnafin to Jn R B9033 St.Combs), Northbound

Start time:12th of January 2025, 7:30pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Leave the A90 at Peterhead onto the A950 to Mintlaw, take the A952 back to A90.

A90 North Water Bridge, Sth of Laurencekirk. N/B Lane closures

Location:A90 (On Slip Stracath Hosp to North Esk Br) to A90 (North Esk Br to B974 Jct Fettercairn), Northboun

Start time:6th of January 2025, 8:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Lane Closure (50mph)

A90 North Water Bridge, Sth of Laurencekirk. S/B Lane closures

Location:A90 (Jct B974 Marykirk to R North Esk Br) to A90 (R North Esk Br to Stracathro Hosp Jct), Southbound

Start time:6th of January 2025, 8:00am

Description:Works:
Bridge Joint Repairs

Traffic Management:
Lane Closure (50mph)

A90 Peterhead Bypass. S/B rolling TTL's

Location:A90 (A950 Rbt to A982 North Rd) to A90 (Invernettie Rbt to A950 Rbt), Southbound

Start time:7th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A90 Philorth, Sth of Fraserburgh - N/B Road closure with daytime TTL's

Location:A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S)), Northbound

Start time:12th of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
12/01/2025 - Road Closure, 13/01/2025 - Road Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 13/01/2025 - Road Closure, 14/01/2025 - Road Closure, 14/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Road Closure, 15/01/2025 - Road Closure, 15/01/2025 - Portable Traffic Lights (TTLS), 15/01/2025 - Road Closure, 16/01/2025 - Road Closure, 16/01/2025 - Portable Traffic Lights (TTLS), 16/01/2025 - Road Closure, 17/01/2025 - Road Closure, 19/01/2025 - Portable Traffic Lights (TTLS), 19/01/2025 - Road Closure, 20/01/2025 - Road Closure, 20/01/2025 - Portable Traffic Lights (TTLS)

Diversion Information:
B9032 > Memsie, onto the A981 > Fraserburgh

A90 Philorth, Sth of Fraserburgh - S/B Road closure with daytime TTL's

Location:A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S)), Southbound

Start time:12th of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
12/01/2025 - Road Closure, 13/01/2025 - Road Closure, 13/01/2025 - Portable Traffic Lights (TTLS), 13/01/2025 - Road Closure, 14/01/2025 - Road Closure, 14/01/2025 - Portable Traffic Lights (TTLS), 14/01/2025 - Road Closure, 15/01/2025 - Road Closure, 15/01/2025 - Portable Traffic Lights (TTLS), 15/01/2025 - Road Closure, 16/01/2025 - Road Closure, 16/01/2025 - Portable Traffic Lights (TTLS), 16/01/2025 - Road Closure, 17/01/2025 - Road Closure, 19/01/2025 - Portable Traffic Lights (TTLS), 19/01/2025 - Road Closure, 20/01/2025 - Road Closure, 20/01/2025 - Portable Traffic Lights (TTLS)

Diversion Information:
A981 to Memsie onto B9032 to A90

A90 Rait Jcn, Glendoick- lane 2 Closure N/B

Location:A90 (Pitroddie Fm Jct to Inchmichael Int) to A90 (Inchmichael Int to B953 Inchture), Northbound

Start time:26th of January 2025, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

A90 Rait Jcn, Glendoick- lane 2 Closure S/B

Location:A90 (B953 Inchture to Inchmichael Int) to A90 (Inchmichael Int to Pitroddie Jct), Southbound

Start time:26th of January 2025, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure (50mph)

A90 Rathen NB - Layby closure

Location:A90 (Jn T A952 Cortes to Jn L B9032 Memsie), Northbound

Start time:23rd of January 2025, 9:30am

Description:Works:
Trial hole investigation

Traffic Management:
Lane Closure.

A90 South Lodge, North of Rathen NB - Temporary traffic signals

Location:A90 (Jn L B9032 Memsie to Fraserburgh Roundabout (S)), Northbound

Start time:21st of January 2025, 9:30am

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A90 South of Peterhead - TTL's

Location:A90 (Jn R B9108 Boddam to Invernettie Rbt), Southbound

Start time:13th of January 2025, 7:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A90 St Madoes - Signage only- S/B

Location:A90 (Inchmichael Int to B953 Inchture) to A90 (Kinfauns Jct to M90), Southbound

Start time:22nd of January 2025, 8:00am

Description:Works:
Advanced signage/diversion on verge

Traffic Management:
No Obstruction on Carriageway or Footway.

A92 Crossgates Layby NB - Lane closure

Location:A92 (B981 O'Bridge to Off Slip A909), Northbound

Start time:7th of January 2025, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

A92 Crossgates NB - Lane closure

Location:M90 (M90 Overbridge to Crossgates Eb On Slip) to A92 (B981 O'Bridge to Off Slip A909), Northbound

Start time:10th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A92 Crossgates SB - Lane closure

Location:A92 (On Slip From A909 to B981 O'Bridge) to M90 (Crossgates Wb Off Slip to M90 Sb), Southbound

Start time:10th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

A92 Luthrie- TTL S/B

Location:A92 (Starr Farm to C29 Xroads) to A92 (C24 Newington to Starr Farm), Southbound

Start time:7th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Aberlour NB - TTL

Location:A96 (Jct Alves Church to Jct Kinloss) to A95 (Junct (R) M'Town Of E'Ville to A941 Dufftown), Northbo

Start time:20th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Craigellachie NB - TTL

Location:A95 (Junct (R) M'Town Of E'Ville to A941 Dufftown) to A95 (A941 Dufftown to Junct A941 To Elgin), No

Start time:13th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A95 Keith- TTL S/B

Location:A95 (C54 Muldearie Rd to A96 Haughs Bridge), Southbound

Start time:6th of January 2025, 7:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A95 NB Cromdale - TTLS

Location:A95 (Sp Rest Sign Cromdale to Speed Derest Sign), Northbound

Start time:6th of January 2025, 9:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A95 North of Tormore, Bridge of Avon - S/B TTL

Location:A95 (Moray Boundary to B9137 Cragganmore), Southbound

Start time:6th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A95 SB Aberlour High St - TTL

Location:A95 (Junct (R) M'Town Of E'Ville to A941 Dufftown), Southbound

Start time:9th of January 2025, 9:30am

Description:Works:
Gully/ironwork repairs

Traffic Management:
Portable Traffic Lights (TTLS).

A95 South of Aberlour NB - TTL

Location:A95 (C18 Jct Carron to Jct (R) To Milltown Of Edinville), Northbound

Start time:13th of January 2025, 8:00am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Blackhall Rbt. E/B access closure

Location:A96 (Blackhall Rbt (E) to Blackhall Rbt (E)) to A96 (Inverurie Rbt (W) to Blackhall Rbt (E)), Eastbo

Start time:2nd of February 2025, 8:00am

Description:Works:
Landscape Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Left onto B9170, right onto Market Place (B9001), right onto St James's Place (B993), left onto Elphinstone Rd (B933) and returning to A96 at Inverurie Rbt.

A96 Blackhillock WB - Stop and go

Location:A96 (Jct B9115 Drummuir to Jct Keith Mkt Grd), Westbound

Start time:6th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Stop/Go Boards Traffic Control.

A96 Blackhillock WB - Temporary traffic signals

Location:A96 (Jct B9115 Drummuir to Jct Keith Mkt Grd), Westbound

Start time:13th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Buckie junction WB - Temporary traffic signals

Location:A96 (Jct B9017 Newmill to Jn R B9016 Buckie) to A96 (Jn R B9016 Buckie to Jct Mulben), Westbound

Start time:20th of January 2025, 9:30am

Description:Works:
Trial hole investigation

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Home farm , Pitcaple EB - TTLS

Location:A96 (Jct Whiteford to Jct B9002 Oyne Fork), Eastbound

Start time:7th of January 2025, 7:30pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Keith- TTL E/B

Location:A96 (Jn R B9016 Buckie to Jct Mulben) to A95 (C54 Muldearie Rd to A96 Haughs Bridge), Eastbound

Start time:20th of January 2025, 9:30am

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Keith- TTL E/B

Location:A96 (Jct A95 Banff to Jct B9116 Newmill) to A96 (Jct B9116 Newmill to Jct B9014 Dufftown), Eastbound

Start time:23rd of December 2024, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Kintore W/B on slip, lane 1 closure

Location:A96 (B977 Over Br (W) to On Slip From B977), Westbound

Start time:16th of January 2025, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
16/01/2025 - Lane Closure, 17/01/2025 - Lane Closure, 18/01/2025 - Lane Closure, 18/01/2025 - Road Closure, 18/01/2025 - Lane Closure, 19/01/2025 - Lane Closure, 19/01/2025 - Lane Closure( 50mph), 20/01/2025 - Lane Closure( 50mph), 21/01/2025 - Lane Closure( 50mph), 22/01/2025 - Lane Closure( 50mph)

Diversion Information:
B977 Gauchhill Rd/ School Rd (B977) to Northern Rd (B987) to Kintore Interchange.

A96 Nairn EB - TTL

Location:A96 (Nairn Mini Rbt to X-Rds At Tradespark), Eastbound

Start time:30th of December 2024, 9:30am

Description:Works:
Landscape Maintenance

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Nairn WB - TTL

Location:A96 (Forres Road Rbt to A939 Grantown Jnt) to A96 (A939 Grantown Junc to Nairn Mini Roundabout), Wes

Start time:21st of January 2025, 10:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A96 Williamston Jct to Oldmeldrum Jct, Colpy. E/B Convoy

Location:A96 (Jct B992 Auchterless to Jct A920 Oldmeldrum), Eastbound

Start time:21st of January 2025, 7:30pm

Description:Works:
Resurfacing

Traffic Management:
Convoy Working (10mph)

A96, Port Elphinstone, Inverurie. N/B TTL's

Location:A96 (Inverurie Rbt (W) to Blackhall Rbt (E)), Northbound

Start time:20th of January 2025, 7:30pm

Description:Works:
Inspections: Structures

Traffic Management:
Portable Traffic Lights (TTLS).

A972 Kingsway East NB - Lane closure

Location:A972 (Arbroath Rd Rbt to East Milton Rbt), Northbound

Start time:6th of January 2025, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A972 Kingsway East SB - Lane closure

Location:A972 (East Milton Rbt to Arbroath Rd Rbt), Southbound

Start time:6th of January 2025, 9:00pm

Description:Works:
Utility Works

Traffic Management:
Lane Closure.

A985 - EB - High Valleyfield - Temp Lights

Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Eastbound

Start time:6th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A985 - EB - High Valleyfield - Temp Lights

Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Eastbound

Start time:6th of January 2025, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A985 - WB - High Valleyfield - Temp Lights

Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Westbound

Start time:6th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

A985 - WB - High Valleyfield - Temp Lights

Location:A985 (Jct B9037(E) H V'Field to Jl C38 Oakley), Westbound

Start time:6th of January 2025, 9:30am

Description:Works:
Drainage Works

Traffic Management:
Portable Traffic Lights (TTLS).

Barrochan Rd NB at A737 Johnstone - Total Closure

Location:A737 (Off Slip To B789 to On Slip From B789) to A737 (B789 Rbt to On Slip From B789), Northbound

Start time:13th of January 2025, 10:00pm

Description:Works:
Carriageway Patching, Gully/ironwork repairs

Traffic Management:
Lane Closure.

Diversion Information:
follow diversion -

Right turn lane to A737 - Continue on A737 EB - Linwood EB offslip - 1st exit onto A761 - A761 - 1st exit onto Bridge of Weir Rd - Deafhillock Rbt - End

Bath Street - Hawick - Road Closure

Location:A7 (Sandbed Rbt to Dovemount Pl Rbt), Eastbound

Start time:6th of January 2025, 9:30am

Description:Works:
Footway Works, Kerbing Works

Traffic Management:
Road Closure.

Broxden NB - Lane closure

Location:A9 (Burnside Lodge to Broxden Rbt) to A9 (Broxden Rbt to Broxden Rbt), Northbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M73 Northbound Junction 1 to Junction 2 - Offside & Adjacent lane closure

Location:M73 (Mainline 3 To 2 Lane to Bailleston Int O/B), Northbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M73 Northbound Junction 1 to Junction 3 - Hard Shoulder Closure

Location:M74 (End Of Slip With Hs to Merge To M73) to M73 (M80 Dbfo Extent to Mollinsburn O/B), Northbound

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

M73 Northbound Junction 2 on-slip - Total closure

Location:M73 (A8 Bailleston Rbt to On Slip M73 (Nb)), Northbound

Start time:20th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Baillieston Roundabout, M73 Southbound Junction 2 on-slip, M73 Southbound to M74 Northbound link road, Daldowie off-slip & Return Northbound to M73.

M73 Northbound Junction 2 to Junction 2A - Offside lane closure

Location:M73 (N/B Baillieston Int to N/B Gartcosh Off Slip), Northbound

Start time:14th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M73 Northbound Junction 2A on-slip - Total closure

Location:M73 (Bowling Green Roundabout to Entry To M73 Nb), Northbound

Start time:21st of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
M73 Southbound Junction 2A on-slip, M73 Southbound Junction 2 off-slip, A8(M) Baillieston Roundabout, M73 Northbound Junction 2 on-slip.

M73 Northbound on-slip from Daldowie - Total closure

Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip), Northbound

Start time:17th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M74 Jct 3A NB on-slip, M74 NB, M74 NB Jct 2A off-slip, M74 SB Jct 2A on-slip

M73 Northbound on-slip from Daldowie lights - Total closure

Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip), Northbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
M74 Northbound Junction 3A on-slip, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.

M73 Southbound Junction 2A on-slip - Total closure

Location:M73 (Auldyards Road Roundabout to Entry To M73 Sb), Southbound

Start time:8th of January 2025, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M73 Northbound Junction 2A on-slip, M73 Junction 3 off-slip & return Southbound.

M73 Southbound Junction 2A to Junction 2 - Nearside lane closure

Location:M73 (S/B Johnston Road O/B to Gartcosh On Slip) to M73 (S/B Gartcosh Int On Ramp to Baillieston Inte

Start time:15th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M73 Southbound Junction 3 to Junction 1- Hard Shoulder Closure

Location:M73 (Mollinsburn O/B to M80 Dbfo Extent) to M73 (Off Slip To M74 Sb to End Of Broken Laneline), Sout

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

M73 Southbound Link road to M74 Northbound - total closure

Location:M73 (M73 Jn 1 Off-Slip to End Two-Lane Slip), Southbound

Start time:16th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M73 SB to M74 SB link road, M74 SB Jct 5 off-slip, Raith Rbt, M74 NB Jct 5 on-slip.

M73 Southbound link road to M74 Southbound - Total closure

Location:M73 (Off Slip To M74 Sb to End Of Broken Laneline) to M73 (End Of Broken Lane Line to Merge To M74 S

Start time:22nd of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
M73 Southbound to M74 Northbound link road, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip.

M74 J11-9 NB - Lane Closure

Location:M74 (Start Slip On B7078 to Brocketsbrae Underpass) to M74 (Slip From B7078 to B7086 Underpass), Nor

Start time:13th of January 2025, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Lane Closure (30mph)

M74 J12-J10 NB - Lane Closure

Location:M74 (A70 Overbridge to B7078 Underpass) to M74 (End Concrete Section to Slip From B7078), Northbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Parapet Repairs

Traffic Management:
Lane Closure (30mph)

M74 J6 NB off to on - Hard shoulder Closure

Location:M74 (Merryton Farm O'Bridge to A723 Underpass) to M74 (A723 Overbridge to Slip On From A723), Northb

Start time:7th of January 2025, 10:00pm

Description:Works:
Landscape Maintenance

Traffic Management:
Hard Shoulder Closure.

M74 J6 NB onslip from Motherwell - HS Running

Location:M74 (A723 Wb to A723 W/B On Slip Nth/Sth Split) to M74 (A723 Overbridge to Slip On From A723), North

Start time:7th of January 2025, 10:00pm

Description:Works:
Landscape Maintenance

Traffic Management:
Single Lane Running.

M74 J9-11 SB - Lane Closure

Location:M74 (B7086 Underpass to Start Of Concrete Section) to M74 (Brocketsbrae Underpass to Slip Off To B70

Start time:13th of January 2025, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Lane Closure (30mph)

M74 Jct 1 onslip SB - Lane Closure

Location:M8 (Slip Off M8 Wb to End Slip ?????) to M74 (2 To 1 Lane to Slip On), Southbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

M74 Jct 10 Onslip - Closure

Location:M74 (B7078 Rbt (E) to Entry M74 Sb) to M74 (Slip On From B7078 to Nethan Bridge North), Southbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Structural Repairs

Traffic Management:
Road Closure.

Diversion Information:
Follow B7078 SB to rejoin M74 SB at J12.

M74 Jct 11 to Jct 12 SB - Lane Closure

Location:M74 (B7078 Underpass to A70 Overbridge), Southbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M74 Jct 8 to Jct 9 SB - Lane Closure

Location:M74 (Lochhead O'Bridge to Draffan Underpass), Southbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M74 NB J2 off slip - Slip Closure

Location:M74 (Fullarton Junc to A724 Junc) to M74 (End Of 2-Lane to T-Junction), Northbound

Start time:27th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M74 NB - leave M74 at J1 - turn left Carnoustie St- turn left onto Scotland St- turn left onto Wallace St- turn left and rejoin M74 SB - leave M74 at J2- end

M74 Northbound Junction 5 off-slip - Total closure

Location:M74 (Slip On From A723 to B7012 Underpass) to M74 (M74 Nb Off Slip to B702 Rbt), Northbound

Start time:15th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M74 Northbound, M74 Northbound to M73 Northbound Link Road, A8(M) Baillieston Roundabout, M73 Southbound Junction 2 on-slip, M73 Southbound to M74 Southbound Link Road, M74 Southbound.

M74 Northbound Junction 6 to Junction 3A - Hard Shoulder Closure

Location:M74 (Slip On From A723 to B7012 Underpass) to M74 (M8ppp Boundary to A721 Gantry), Northbound

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

M74 Northbound link road to M73 Northbound - total closure

Location:M74 (Mainline 3 To 2 Lane to Blantyre Farm Rd O/B) to M74 (Start Of 2 Lane + Hs to End 2 Lane + Hs),

Start time:21st of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
M74 Northbound, M74 Northbound Junction 2A off-slip, M74 Southbound Junction 2A on-slip

M74 Northbound to M73 Northbound link road - Nearside lane closure

Location:M74 (Start 2-Lane Section to Start Of 2-Lane Slip With Hs) to M73 (Start Of 3-Lane Section to Bailes

Start time:17th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M74 SB J14-J15 - Lane Closure

Location:M74 (Coatsgate Bridge to Moffat Exit Sb) to M74 (A701 Underbridge to Moffat Onslip), Southbound

Start time:23rd of December 2024, 8:00am

Description:Works:
Pothole Repairs

Traffic Management:
Lane Closure.

M74 SB J8 to J10 - Road Closure

Location:M74 (B7019 Overbridge to Off Slip To A71) to M74 (Slip On From B7078 to Nethan Bridge North), Southb

Start time:30th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
leave M74 jct 8- at rbt take 1st exit onto B7078- at rbt 2nd exit and rejoin M74 at jct 10

M74 SB Jct 6 Off slip Lane Closure

Location:M74 (Start Off Slip to S/B Slp East/Wst Split), Southbound

Start time:10th of January 2025, 10:00pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

M74 Southbound Junction 3A to Junction 6 - Hard Shoulder Closure

Location:M74 (M8ppp Boundary to A721 Gantry) to M74 (B7012 Underpass to A723 Slip Off), Southbound

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Mobile Lane Closures.

M74 Southbound Junction 4 to M73 Northbound - total closure

Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip) to M74 (End Of Slip With Hs to Merge To M73), So

Start time:17th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M74 Southbound, M74 SB Jct 5 off-slip, Raith Rbt, M74 NB Jct 5 on-slip

M74 Southbound Junction 5 on-slip - Total closure

Location:M74 (B7012 Rbt to Entry M74 Sb) to M74 (B7012 Underpass to A723 Slip Off), Southbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M74 Junction 5 on-slip Northbound, M74 Northbound to M73 Northbound Link road, M73 Northbound Junction 2 off-slip, Baillieston Rbt, M73 Southbound Junction 2 on-slip, M73 Southbound to M74 Southbound link road.

M74 Southbound main line - Nearside & adjacent lane closure

Location:M74 (Fallside Rd Bridge to B7012 Underpass) to M74 (B7012 Underpass to A723 Slip Off), Southbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Lane Closure.

M74 Southbound to M73 NB - Nearside & Adjacent to total closure

Location:M74 (M8ppp Boundary to A721 Gantry) to M74 (Start Of Dedicated Slip to End Of 1-Lane Slip), Southbou

Start time:10th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M74 SB, Junction 5 SB Raith SB Off-slip, Raith Rbt, Junction 5 NB On-slip, M74 NB Link road to M73. M73 Northbound.

M74 Southbound to M73 Northbound Link road - Total closure

Location:M74 (Start Of Dedicated Slip to End Of 1-Lane Slip) to M74 (End Of Slip With Hs to Merge To M73), So

Start time:20th of January 2025, 8:00pm

Description:Works:
Trial hole investigation

Traffic Management:
Road Closure.

Diversion Information:
M74 Southbound, m74 Southbound Junction 5 off-slip, Raith Roundabout, M74 Northbound Junction 5 on-slip.

M74 Southound Junction 6 - Offside & Adjacent lane closure becoming total closure of main line

Location:M74 (B7012 Underpass to A723 Slip Off) to M74 (A723 Slip Off to A723 O'Bridge), Southbound

Start time:9th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M74 SB Jct 6 off-slip to Hamilton, Palace Grounds rbt, M74 Southbound Jct 6 on-slip

M77 NB Jct 1 to M8 Jct 22 - Lane Closure

Location:M77 (B768 Dumbreck Rd Int (N) to Slip Off To M8), Northbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Lane Closure.

M77 NB Jct 5 onslip - Total closure

Location:M77 (Roundabout Maidenhill Interchange to End Of Slip Slip Road) to M77 (Maidenhill Interchange Over

Start time:13th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Leave M77 NB Jct 5 offslip - A77 Ayr Rd - Crookfur Rd - B7087 - Return M77 Jct 4 NB Onslip

M77 NB Jct 6-5 - Lane Closure

Location:M77 (Cairn Road Underbridge to Maidenhill Interchange Overbridge) to M77 (Maidenhill Interchange Ove

Start time:13th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops

Traffic Management:
Lane Closure.

M77 NB Jct 1 - Road Closure

Location:M77 (B768 Dumbreck Rd Int (S) to B768 Dumbreck Rd Int (N)) to M77 (Off Slip From M8 Wb to Entry To M

Start time:13th of April 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
leave M77 jct at Jct 1- turn left onto Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end

M77 NB Jct 1 to M8 EB Jct 22 Secondary Carriageway- Road Closure

Location:M77 (B768 Dumbreck Rd Int (N) to Slip Off To M8) to M77 (Lhs Slip To M8 to Entry To M8), Northbound

Start time:20th of January 2025, 9:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Continue onto M8, Over Kingston bridge, take J18 City center, continue onto Bothwell St, right turn onto Blythswood St then right onto Waterloo St, Join the M8, take M8 WB J20, left turn onto Wallace St and join the M74 at J1- End

M77 NB Jct 5 - 4 Total closure

Location:M77 (Cairn Road Underbridge to Maidenhill Interchange Overbridge) to M77 (Crookfur Int. to A77 Overb

Start time:13th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Leave M77 NB Jct 5 offslip - A77 Ayr Rd - Crookfur Rd - B7087 - Return M77 Jct 4 NB Onslip

M77 NB Jct1 On Slip - Slip Closure

Location:M77 (N/B Slip Road On To M77 From Dumbreck Road to N/B Slip Road On To M77) to M77 (B768 Dumbreck Rd

Start time:13th of April 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
continue on Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end
SPECIALS TO BE MADE TO CATCH TRAFFIC AT MOSSIDE BOULEVARD.

M77 SB Between Jct 2 & 3 - Road Closure

Location:M77 (B762 Barrhead Rd Int(N) to Barrhead Rd Int (S)) to M77 (Nitshill Rd Int (N) to Nitshill Rd Int

Start time:8th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via: Barrhead Rd, Fairchild Ave, End

M77 SB Prior to Jct 2 - Lane closure

Location:M77 (B762 Barrhead Rd Int(N) to Barrhead Rd Int (S)) to M77 (Nitshill Rd Int (N) to Nitshill Rd Int

Start time:8th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

M77 link to M8 NB - Road Closure

Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Rhs Slip To M8 to Entry To M8), Northbound

Start time:13th of April 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
leave M77 jct at Jct 1- turn left onto Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end

M77 link to M8 sec c/way NB- Slip Closure

Location:M77 (Off Slip To M8 to Start 4 Lane Division) to M77 (Lhs Slip To M8 to Entry To M8), Northbound

Start time:13th of April 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
leave M77 jct at Jct 1- turn left onto Dumbreck rd- turn right and rejoin M8 east at jct jct 23- follow directional signs- end

M8 EB J21 Off Slip to WB Jct 22 - Road Closure

Location:M74 (End Of 2-Lane to Start Of 1-Lane), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Take M74 J1 Off Slip and continue onto Paisley Rd - end

M8 EB Jct 29A Onslip - Total Closure

Location:M8 (A8 Commonside Roundabout to M8 Mainline), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
Continue A8 Greenock Rd - 3rd Exit Barnsford Rd - continue A726 go through Next Rbt to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound.

M8 EB Jct 30 Onslip from M898 SB - Total Closure

Location:M898 (On Slip From A726 to Off Slip To M8) to M8 (Craigton Int to M898 Entry), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
Continue M898 - M8 WB Jct 30 Onslip - Jct 31 offslip - return M8 EB Jct 31 - Junction 30 Craigton – leave M8 by taking slip road to M898 - travel to slip road (1st left) for Erskine – take slip road to roundabout under Erskine Bridge - take 3rd exit onto A726 go under Erskine Bridge to roundabout –take 1st exit onto Barnsford Road - go through several roundabouts to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound.

M8 - EB - Jct 1 to jct 3 - Lane closure

Location:M8 (Livingston Inter. E to Uphall Station Br) to M8 (Gogar Slip Road to Hermiston Roundabout), Eastb

Start time:13th of January 2025, 8:00pm

Description:Works:
Landscape Maintenance

Traffic Management:
Lane Closure.

Diversion Information:
progressive lane closures and hard shoulder closure

M8 - EB - Jct 3 on slip - closure

Location:M8 (Start Eastbound Slip From A899 to A899 O'Bridge (N)) to M8 (Livingston Inter. E to Uphall Statio

Start time:13th of January 2025, 8:30pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Road Closure.

M8 - WB - Jct 1 to jct 3 - Lane closure

Location:M8 (Hermiston Rbt to Sighthill Slip Rd) to M8 (Westbound Slip To A899 to Livingston Int. Slip From A

Start time:13th of January 2025, 8:00pm

Description:Works:
Landscape Maintenance

Traffic Management:
Lane Closure.

Diversion Information:
progressive lane closures and hard shoulder closure

M8 E/B J15 off slip to Stirling Road - Total Closure

Location:M8 (Off Slip M8 Eb to Slip To A803) to M8 (A803 Exit to Entry Eb M8), Eastbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Road Closure.

Diversion Information:
continue on m8 to j14 eb ofslip then turn right onto veiw park avenue and right to rejoin m8 wb and follow to j15 end

M8 E/B J18- J15 - Lane Closures

Location:M8 (A82 Exit to Entry M8 Eb) to M8 (Off Slip To A803 to On Slip From A803), Eastbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 EB Jct 23 on slip from Dumbreck Road - Slip Closure

Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end

M8 EB Jct 24 on slip from Helen Street - Slip Closure

Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue onto Helen st- at rbt take 3rd exit onto Edminston Drive - at rbt take 3rd exit onto Broomloan Rd- at jct go straight ahead onto Dumbreck rd- turn left onto M77 north- end

M8 EB Jct 24 to Jct 22 - Lane Closure

Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB - JCT 31 off slip - lane closures

Location:M8 (Slip Off To A8 to Slip Entry From A8) to A8 (Slip Off To A8 to A8 Rbt), Eastbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB Between 17 & 16 - Hard Shoulder Closure

Location:M8 (A81 Underpass to Craighall Rd Underpass), Eastbound

Start time:6th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Hard Shoulder Closure.

M8 EB Between 25 and 24 - Hard Shoulder Closure

Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip), Eastbound

Start time:6th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Hard Shoulder Closure.

M8 EB Between Jct 12 - 11 - Hard Shoulder Closure

Location:M8 (Jct 12 Off Slip to Jct 11 On Slip), Eastbound

Start time:20th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Hard Shoulder Closure.

M8 EB Between Jct 13 - 12 - Hard Shoulder Closure

Location:M8 (Off Slip To M80 to Entry From M80), Eastbound

Start time:20th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Hard Shoulder Closure.

M8 EB Between Jct 27 & Jct 26 - Road Closure

Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In

Start time:6th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via: A741 Renfrew Rd, A726, A761 Paisley Rd West, A736 Sandwood Rd, Hillington Rd, Hillington Interchange, End

M8 EB Between Jct 28 & 27 - Lane Closure

Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In

Start time:6th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

M8 EB Jct 22 to Jct 20 - Lane 1 Closure

Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M74 (Slip 2-Lane to T-Junction), Eastbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 EB Jct 12 Off slip - Lane Closure

Location:M8 (Slip On From M80 to Off Slip Jct 12) to M8 (Slip Off M8 Eb to Cumbanauld Rd), Eastbound

Start time:8th of January 2025, 10:00pm

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

M8 EB Jct 20 A814 Off slip -Total Closure

Location:M8 (Slip Off M8 Eb to A814 Entry), Eastbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Cyclic Maintenance, Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
A804 North St - St Vincent St - A804 Newton St - Argyle St - End

M8 EB Jct 20 West St On slip -Lane Closure

Location:M8 (Jct Gloucester / West Rd To Start Of Elevated Sect to Start Of Elevated Section) to M8 (Slip Off

Start time:9th of January 2025, 10:00pm

Description:Works:
Cyclic Maintenance, Gully/ironwork repairs

Traffic Management:
Lane Closure.

M8 EB Jct 22 off slip Seaward St - Slip Closure

Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (End Of 2-Lane to Searward St Jn), Eastbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue to M74 and leave at Jct 1a- at Jct turn right- rejoin M74 north- leave M74 at Jct 1- follow directional signs

M8 EB Jct 22 to M74 Jct 1 - Closure

Location:M74 (Start Of M74 to 2 To 3 Lane) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue M8 east- leave M8 at jct 19 Bothwell st- turn left at Pitt st- turn left onto st Vincent st- turn left onto M8 West- leave M8 at jct 20 west st- follow directional signs

M8 EB Jct 23 on slip - Total Closure

Location:M8 (B768 Dumbrek Rd to Entry M8 Eb), Eastbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Road Closure.

Diversion Information:
Dumbrek Rd - M77 Jct 1 NB on slip - Diversion End

M8 EB Jct 24 on slip - Total Closure

Location:M8 (Helen St Jct to Entry M8 Eb), Eastbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Road Closure.

Diversion Information:
Helen St - Edminston Dr - Broomloan Rd - Dumbrek Rd - M77 Jct 1 NB onslip - Diversion End

M8 EB Jct 24 to 23 - Lane Closure

Location:M8 (Eb Jct 24 Off Slip to Eb Jct 24 On Slip) to M8 (Jct 23 Slip Rd Entry to Jct 22 Off Slip), Eastbo

Start time:9th of January 2025, 10:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Lane Closure.

M8 EB Jct 25 - 24 - Lane closure O/S + Adj

Location:M8 (Eb Jct 25 Off Slip to Eb Jct 25 On Slip) to M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip), Eastbo

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works

Traffic Management:
Lane Closure.

M8 EB Jct 25 to Jct 14 Mobile Works

Location:M8 (Jct 25 Slip Rd Entry to Jct 24 Off Slip) to M8 (Jct 15 On Slip to Jct 14 Off Slip), Eastbound

Start time:23rd of December 2024, 10:00pm

Description:Works:
Inspections

Traffic Management:
Mobile Lane Closures.

M8 EB Jct 26 off slip - Total Closure

Location:M8 (Slip Off To H.Int to Mid Point H.Int Bridges) to M8 (Slip Off M8 Eb to Hillington Int Rbt), East

Start time:19th of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
M8 Jct 27 EB off slip - Arkleston Rd - A741 - A8 Glebe St - A8 Glasgow Rd - Diversion End

M8 EB Jct 26 on slip - Total Closure

Location:M8 (Hillington Int Rbt to Entry M8 Eb) to M8 (Jct 26 Entry Slip to Jct 25 Off Slip), Eastbound

Start time:19th of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
Hillington IC - A736 Hillington Rd - Kings Inch Rd - Old Govan Rd - M8 Jct 25a edn on slip - Diversion end

M8 EB Jct 27 on slip - Total Closure

Location:M8 (A741 Arkleston Rd to Entry M8 Eb), Eastbound

Start time:19th of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
M8 Jct 27 EB off slip - Arkleston Rd - A741 - A8 Glebe St - Old Govan Rd M8 Jct 25a EB n slip - Diversion End

M8 EB Jct 27 onslip - Slip Closure

Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In

Start time:6th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via: A741 Renfrew Rd, A726, A761 Paisley Rd West, A736 Sandwood Rd, Hillington Rd, Hillington Interchange, End

M8 EB Jct 27 to 26 - Total Closure

Location:M8 (A741 Renfrew Rd O'Br to Slip Rd Off M8 Eb) to M8 (Jct 26 Entry Slip to Jct 25 Off Slip), Eastbou

Start time:19th of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
M8 Jct 27 EB off slip - Arkleston Rd - A741 - A8 Glebe St - Old Govan Rd M8 Jct 25a EB n slip - Diversion End

M8 EB Jct 28 onslip - Slip Closure

Location:M8 (Slip To Arkleston Rd to Slip From Arkleston Rd) to M8 (Arkleston On Slip to Off To Hillington In

Start time:6th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via: A741 Renfrew Rd, A726, A761 Paisley Rd West, A736 Sandwood Rd, Hillington Rd, Hillington Interchange, End

M8 EB Jct 30-29 St James IC Total Closure

Location:M8 (Slip To M898 to Craigton Int Underpass) to M8 (Slip Rd Off M8 Eb to Mid Point A737 Bridges), Eas

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
Closure M8 Junction 30 Craigton – leave M8 by taking slip road to M898 - travel to slip road (1st left) for Erskine – take slip road to roundabout under Erskine Bridge - take 3rd exit onto A726 go under Erskine Bridge to roundabout –take 1st exit onto Barnsford Road - go through several roundabouts to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound. TRO 3714347

M8 EB Second carriageway from M77 to M74 - Total Closure

Location:M77 (Lhs Slip To M8 to Entry To M8) to M74 (2 To 3 Lane to 3 To 2 Lane), Eastbound

Start time:20th of January 2025, 9:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Continue onto M8, Over Kingston bridge, take J18 City center, continue onto Bothwell St, right turn onto Blythswood St then right onto Waterloo St, Join the M8, take M8 WB J20, left turn onto Wallace St and join the M74 at J1- End

M8 EB Slip to Second carriageway - Total Closure

Location:M8 (M77 Int Off Slip to M77 Int On Slip) to M77 (Lhs Slip To M8 to Entry To M8), Eastbound

Start time:20th of January 2025, 9:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Continue onto M8, Over Kingston bridge, take J18 City center, continue onto Bothwell St, right turn onto Blythswood St then right onto Waterloo St, Join the M8, take M8 WB J20, left turn onto Wallace St and join the M74 at J1- End

M8 Eastbound Eurocentral to Chapelhall - Nearside lane closure

Location:A8 (Chapelhall Overbridge to Eurocentral Overbridge), Eastbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 Eastbound Junction 10 to Junction 6- Hard Shoulder Closure

Location:M8 (End Of Nosing to Jnct 10 On Slip (Nosing)) to M8 (End Of Ppp to Duntilland Road), Eastbound

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

M8 Eastbound Junction 6 on-slip - Total closure

Location:M8 (A73 Newhouse Rbt to On To M8 Eb), Eastbound

Start time:8th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
A8 Westbound Newhouse on-slip, A8 Chapelhall South Rbt, A8 Chapelhall North rbt, A8 Eastbound,

M8 Eastbound Junction 6A off-slip - total closure

Location:A8 (Chapelhall Overbridge to Eurocentral Overbridge) to A8 (Start Chapelhall Eb Off Slip to Start 2

Start time:20th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M8 Eastbound Junction 5 off-slip, M8 Westbound Junction 5 on-slip.

M8 Eastbound Junction 8 Baillieston on-slip - Total closure

Location:A8 (Bailleston Rbt to Entry A8 Eb) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Eastbound

Start time:22nd of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Road Closure.

Diversion Information:
A8(M) Baillieston Roundabout, Swinton roundabout, Bargeddie Roundabout, A8 Eastbound.

M8 Eastbound Junction 9 to Junction 8 - Nearside lane closure

Location:M8 (Slip Off Jct 9 to Railway Bridge) to M8 (Slip From M8 Eb to Slip To M8), Eastbound

Start time:12th of January 2025, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

M8 Eastbound to M73 Southbound link road - Total closure

Location:M8 (Slip Off Jct 9 to Railway Bridge) to M8 (Slip Off M8 Eb to Entry M73), Eastbound

Start time:14th of January 2025, 8:00pm

Description:Works:
Inspections

Traffic Management:
Road Closure.

Diversion Information:
M8 Eastbound Junctio n7 Eurocentral off-slip, Eurocentral North Rbt, Eurocentral South Rbt, M8 Westbound.

M8 J12 WB onslip - Slip Closure

Location:M8 (Cumbanauld Rd to 2 Way Slip) to M8 (Jct 12 Wb On Slip to Off Slip To M80), Westbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Inspections: Infrastructure / Assets

Traffic Management:
Road Closure.

Diversion Information:
Join M8 Eastbound at J12 follow to leave at J11 EB offslip turn RIGHT then RIGHT to join M8 WB at J11 onslip.

M8 J18 EB Off slip to A804 - Total Closure

Location:M8 (Jct 19 On Slip to Sauchiehall O'Br) to M8 (Jct 18 Eb Off Slip to St Georges Rd Jct), Eastbound

Start time:16th of January 2025, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Continue on M8 EB – M8 Jct 15 EB off slip – left onto Baird St – Left to rejoin A803 SB – M8 Jct 15 WB on slip - M8 J16 EB off slip - continue on A804 Dobbie's loan - A81 Garscube road - left on St Georges road - right onto A82 GWR - diversion ends

M8 J18 EB Off slip to A82 - Total Closure

Location:M8 (Jct 19 On Slip to Sauchiehall O'Br) to M8 (Jct 18 Off Slip to Entry A82), Eastbound

Start time:16th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Road Closure.

Diversion Information:
Continue on M8 EB – M8 Jct 15 EB off slip – left onto Baird St – Left to rejoin A803 SB – M8 Jct 15 WB on slip - M8 J16 EB off slip - continue on A804 Dobbie's loan - A81 Garscube road - left on St Georges road - right onto A82 GWR - diversion ends

M8 J19 EB on slip from North Street - Total closure

Location:M8 (Slip Off M8 Eb to Bothwell St) to M8 (Start On Slip to Entry M8 Eb), Eastbound

Start time:16th of January 2025, 8:00pm

Description:Works:
Utility Works

Traffic Management:
Road Closure.

Diversion Information:
continue on A804 North St - A804 St Georges road - A81 Garscube road - A804 Dobbie loan - back on m8 EB at J16 Craighall - diversion ends

M8 J22 Off Slip to Seaward Street EB - Slip Closure

Location:M74 (2 To 3 Lane to 3 To 2 Lane) to M74 (End Of 2-Lane to Searward St Jn), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Take M74 J1 Off Slip and continue onto Paisley Rd - end

M8 J23 EB - Lane Closure

Location:M8 (A8 O'Bridge to Jct 23 Slip Rd Entry) to M8 (M77 Int Off Slip to M77 Int On Slip), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Lane Closure.

M8 J23 EB On Slip - Total Closure

Location:M8 (B768 Dumbrek Rd to Entry M8 Eb) to M8 (A8 O'Bridge to Jct 23 Slip Rd Entry), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via:
Dumbreck Rd, M77 Jct 1 NB On slip, End

M8 Jct 13 to 14 EB - Lane Closure

Location:M8 (Jct 14 Off Slip to Off Slip To M80) to M8 (Off Slip To M80 to Entry From M80), Eastbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 Jct 13 to 14 WB - Lane Closure

Location:M8 (Off Slip To M80 to Entry From M80) to M8 (On Slip From M80 to Jct 14 Off Slip), Westbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 Jct 14 - Jct 13 EB - Lane Closure

Location:M8 (Jct 15 On Slip to Jct 14 Off Slip) to M8 (Jct 14 Off Slip to Off Slip To M80), Eastbound

Start time:9th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 Jct 17 to Jct 16 EB - Lane Closure

Location:M8 (Craighall Rd to Entry M8 Eb), Eastbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 Jct 2 EB off-slip to M9 Jct 1 WB. Road Closure.

Location:M8 (Jct Off From M8 to East Of Claylands Jct) to M9 (End Of 4 Lane Eb to 2 Lane Dual), Westbound

Start time:14th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Continue M8 EB to M8 Jct 1 Hermiston Gait. Take exit to A720 WB to Gogar Roundabout then take 1st exit onto A8 to Newbridge.

M8 Jct 2 WB off-slip to M9 Jct 1 WB. Road Closure.

Location:M8 (Freelands Rd Br. to Wb Slip To Newbridge) to M8 (Start Nb Off Slip To Newbridge to End Of M8 Eb

Start time:14th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Continue M8 WB to M8 Jct 3 off-slip. Take 4th exit on Livingston Roundabout onto A899 then 3rd exit at Dechmont Roundabout onto A89 continuing to Newbridge.

M8 Jct 29 Offslip - Total Closure

Location:M8 (Slip Off M8 Eb to A737 Rbt), Eastbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Resurfacing, Traffic Loops, Gully/ironwork repairs

Traffic Management:
Road Closure.

Diversion Information:
Closure M8 Junction 30 Craigton – leave M8 by taking slip road to M898 - travel to slip road (1st left) for Erskine – take slip road to roundabout under Erskine Bridge - take 3rd exit onto A726 go under Erskine Bridge to roundabout –take 1st exit onto Barnsford Road - go through several roundabouts to roundabout at St James Interchange – take 1st exit then bear right to join M8 eastbound.

M8 Jct 3 WB Onslip - Road Closure

Location:M8 (A899 Rbt to Start Eastbound Slip From A899) to M8 (Westbound Slip To A899 to Livingston Int. Sli

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4

M8 Jct 3-4 WB Road Closure

Location:M8 (Westbound Slip To A899 to Livingston Int. Slip From A899) to M8 (East Whitburn Junction (East) t

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4

M8 Jct 3A WB Onslip - Road Closure

Location:M8 (A779 Rbt (S) to On Slip To M8), Westbound

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
A779, A7066, A801 and rejoin M8 westbound at Jct 4

M8 Jct 3A WB Onslip - Road Closure

Location:M8 (Starlaw Bridge to Easter Inch Footbridge) to M8 (Off Slip to A779 Rbt (S)), Westbound

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4

M8 Jct 4 - Jct 5 - EB. Road Closure

Location:M8 (Duntilland Rd C73 to B7057 U'Bridge) to M8 (Council Boundary to A706 Bridge), Eastbound

Start time:16th of January 2025, 8:30pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
WB traffic will be diverted off at Jct 5 WB slip and directed onto the B7057. Traffic will be directed to turn left onto the B7066. Traffic will continue on the B7066 until directed to go straight ahead at the 4 roundabouts at Heartlands Services. Traffic will then be directed to re-join the M8 WB carriageway at Jct 4a.

M8 Jct 4 - Jct 5 - WB. Road Closure

Location:M8 (A706 Bridge to Council Bdy) to M8 (Council Bdy to B7057 U'Bridge), Westbound

Start time:13th of January 2025, 8:30pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
WB traffic will be diverted off at Jct 4A and directed to the first exit at the roundabout and past the Services, taking the 2nd junction at the next 2 roundabouts. At the next roundabout, traffic will take the 3rd exit onto the B7066. Traffic will continue along the B7066 through Harthill until being directed to take the right-hand junction onto the B7057. Traffic will then take the slip road back onto the M8 west bound carriageway at Jct 5.

M8 Jct 4 WB Off slip - Road Closure

Location:M8 (Riddoch Hill Footbridge to East Whitburn Junction (East)) to M8 (Slip To A801 to A801 Rbt), West

Start time:8th of January 2025, 8:30pm

Description:Works:
Resurfacing

Traffic Management:
Road Closure.

Diversion Information:
.A899, A89, A7066, A801 and rejoin M8 westbound at Jct 4

M8 Sec c/way EB onto M74 SB - Lane Closure

Location:M8 (M77 Int Jct 22 to Jct 20 Slip Rd Entry) to M74 (Start Of 3 Lanes to Polmadie Junc), Eastbound

Start time:6th of January 2025, 8:00pm

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

M8 W/B J15 - J18 Lane Closure

Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (Wb Off Slip to Wb Entry Slip), Westbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 WB J15 on slip from Springburn Expressway - Slip Closure

Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (M8 Overbridge to Entry M8 Wb), Westbound

Start time:1st of September 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue A803 - at jct turn right onto Castle St - continue Alexandria Parade- turn left onto Alexandria Park St - join M8 WB at J14 end

M8 WB - Lane Closure - Eastfield

Location:M8 (B7057 U'Bridge to Duntilland Rd), Westbound

Start time:14th of January 2025, 12:01am

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 WB - Lane Closure - Salsburgh

Location:M8 (Duntilland Road to End Of Se Unit), Westbound

Start time:14th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M8 WB 11 On Slip - Total Closure

Location:M8 (Start Wb On Slip Junction 11 to End Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off

Start time:8th of January 2025, 10:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
North Follow Diversion B765 Ave End Rd - Gartloch rd - A80 Join M8 WB Jct 12 On slip South B765 Stepps Rd - A8 Edinburgh Rd - Cumbernauld Rd - Join M8 Jct 12 on slip

M8 WB J15 to J16 - Lane Closure

Location:M8 (Jct 15 Off Slip to M8 O'Bridge) to M8 (Jct 16 Wb Off Slip to Slip To Craighall Rd), Westbound

Start time:1st of September 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 11 Onslip - Slip Closures

Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off Slip), We

Start time:22nd of January 2025, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via: M8 EB, M8 Jct 10 EB Off slip, Westerhouse Rd, M8 WB Jct 10 On Slip, End

M8 WB Jct 11 to 12 - Lane Closures

Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 12 Off Slip to Jct 12 Entry Slip),

Start time:8th of January 2025, 10:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 WB Jct 12 Off Slip Total Closure

Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (Cumbanauld Rd to 2 Way Slip), Westbound

Start time:8th of January 2025, 10:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
Follow Diversion M8 WB Exit Jct 13 - Turn Provan Rd - Join M8 EB - exit Jct 12 EB offslip

M8 WB Jct 12 Onslip - Slip Closure

Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (Jct 12 Wb On Slip to Off Slip To M80), Westbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Diversion Via: Gartloch Rd, Ave End Rd, Stepps Rd, M8 Jct 11 WB On Slip, End

M8 WB Jct 12 to Jct 13 - Lane Closure

Location:M8 (Jct 12 Off Slip to Jct 12 Entry Slip) to M8 (Jct 12 Wb On Slip to Off Slip To M80), Westbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

M8 WB Jct 14 to Jct 25 Mobile Works

Location:M8 (On Slip Jct 14 to Off Slip Jct 15) to M8 (Jct 25 Off Slip to A739 Rbt), Westbound

Start time:23rd of December 2024, 10:00pm

Description:Works:
Inspections

Traffic Management:
Mobile Lane Closures.

M8 WB Jct 15 Off slip to Stirling Road - Hard Shoulder Closure

Location:M8 (On Slip Jct 14 to Off Slip Jct 15) to M8 (Jct 15 Off Slip to Stirling Rd Jct), Westbound

Start time:13th of January 2025, 8:00am

Description:Works:
Third Party Works

Traffic Management:
Hard Shoulder Closure.

M8 WB Jct 22 Seward Street- Slip Closure

Location:M74 (Roundabout to Start Of 1-Lane) to M74 (Start Of 1-Lane to Wb On-Slip), Westbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
circle Rbt and take 2nd exit onto Scotland st- turn left onto Carnoustie st- rejoin M8 sec c/way east - end

M8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure

Location:M74 (Start Ded. Lane to M8 & M77 Split) to M77 (Off Slip From M8 Wb to Entry To M77 Sb), Westbound

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 WB Jct 25 on slip - Total closure

Location:M8 (Jct 25 Off Slip to A739 Rbt) to M8 (A739 Exit to Entry M8 Wb), Westbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - M8 Jct 26 WB on slip - Diversion end

M8 WB Jct 25 to 26 - Total closure

Location:M8 (Wb Jct 25 Off Slip to Wb Jct 25 On Slip) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Sli

Start time:21st of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
M8 EB Jct 26 off slip - A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - M8 Jct 26 WB on slip - Diversion end

M8 WB Jct 25a off slip - Total closure

Location:M8 (Jct 25 Wb On Slip to Jct 26 Off Slip) to M8 (W/B Off Slip From M8 to Braehead Rbt), Westbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - Kings Inch Rd - - Diversion end

M8 WB Jct 26 off slip - Total closure

Location:M8 (Jct 25 Wb On Slip to Jct 26 Off Slip) to M8 (Slip Off M8 Wb to Hillington Int Rbt), Westbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Inspections: Structures

Traffic Management:
Road Closure.

Diversion Information:
A739 - Shieldhall Rd - Renfrew Rd - Hillington IC - Diversion end

M8 WB Jct 26 on slip from Hillington IC - Slip Closure

Location:M8 (Hillington Int Rbt to Entry M8 Wb) to M8 (Slip Frm Hg'Tn Intr -Slip to A741 Renfrew Rd Slip), We

Start time:2nd of July 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Road Closure.

Diversion Information:
continue onto Hillington road- at roundabout take 1st exit onto Glasgow rd- rbt 2nd exit onto Glebe st- jct turn left onto A741 Paisley rd- rbt take 2nd exit- end

M8 WB Jct 31 to A8 Greenock Rd - Lane Closures

Location:M8 (Slip From M8 Wb to Slip Entry From A8) to A8 (Woodhall Rbt to Newark Rbt), Westbound

Start time:6th of January 2025, 9:30am

Description:Works:
Cyclic Maintenance

Traffic Management:
Lane Closure.

M8 WB at Jct 11 - Lane Closures

Location:M8 (Wb Off Slip Junction 11 to Wb On Slip Junction 11) to M8 (Jct 11 On Slip to Jct 12 Off Slip), We

Start time:22nd of January 2025, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Lane Closure.

M8 WB between Jct 30 and Jct 31 - Lane Closures

Location:M8 (Slip From M898 to Slip Off To Ferry Int), Westbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 WB onslip from J31 - Lane Closure

Location:A8 (West Ferry Toll Rbt to Slip On To A8), Westbound

Start time:9th of May 2025, 8:00pm

Description:Works:
Grass Cutting

Traffic Management:
Lane Closure.

M8 Westbound Junction 10 off-slip - Nearside lane closure becoming total closure of slip road

Location:M8 (Wb Off Slip Junction 10 to Wb On Slip Junction 10) to M8 (Start Wb Off Slip Junction 10 to End W

Start time:7th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Road Closure.

Diversion Information:
M8 Westbound Junction 11 off-slip, M8 Eastbound Junction 11 on-slip

M8 Westbound Junction 6 to Junction 10 - Hard Shoulder Closure

Location:M8 (Duntilland Road to End Of Se Unit) to M8 (Wb On Slip Junction 10 to Wb Off Slip Junction 11), We

Start time:1st of January 2025, 12:00am

Description:Works:
Cyclic Maintenance

Traffic Management:
Hard Shoulder Closure.

M8 Westbound Junction 7A to Junction 8 - Nearside lane closure

Location:A725 (Start 2 Lane to Diamond Int. O/B) to A8 (Bargeddie Underbridge to Baillieston Off Slip), Westb

Start time:6th of January 2025, 8:00pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M8 Westbound Junction 7A to Junction 8 - Nearside lane closure

Location:A725 (Start 2 Lane to Diamond Int. O/B) to A8 (Shawhead Overbridge to Bargeddie), Westbound

Start time:19th of January 2025, 8:00pm

Description:Works:
Lighting Works

Traffic Management:
Lane Closure.

M80 - NB - Junction 8 to 9 - Lane Closures

Location:M80 (Slip Off To M876 Bankhead to Dunipace O'Bridge) to M80 (Northfield Underpass to Foot Green O'Br

Start time:20th of January 2025, 7:00pm

Description:Works:
Filter Drain

Traffic Management:
Lane Closure (50mph)

M80 - SB - Denny - Hard shoulder closure

Location:M80 (Dunipace O'Bridge to Slip Off To M876), Southbound

Start time:20th of January 2025, 9:30am

Description:Works:
Third Party Works

Traffic Management:
Hard Shoulder Closure.

M80 J1 to M80 WB - Lane Closure

Location:M80 (M80 Sb Off Slip to M8 Entry) to M8 (On Slip From M80 to Jct 14 Off Slip), Southbound

Start time:6th of January 2025, 10:00pm

Description:Works:
Inspections: Infrastructure / Assets

Traffic Management:
Lane Closure.

M876 - WB - Jct 1 - Slip closure

Location:M876 (A9 O'Bridge N Broomage to River Carron O'Br) to M876 (Off Slip To Denovan Rd to Denovan Rd T-J

Start time:6th of January 2025, 8:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Drivers continue to m80 jct 7 and return to jct 1 EB

M876 SB - Lane Closure - Bonnybridge

Location:M876 (River Carron O'Br to M876 Jct Bankhead), Southbound

Start time:17th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M876 WB - Lane Closure - Near to Airth

Location:A876 (Higgins Neuk Rbt to Bowtrees Int), Westbound

Start time:13th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M9 - EB - Linlithgow Loch - Lane Closure

Location:M9 (B8029 Bridge to A706 Bridge) to M9 (Bonnytoun Farm to Coal Road), Eastbound

Start time:8th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

M9 - NB - Jct 3 to Jct 4 - Hard shoulder closure

Location:M9 (River Avon Bridge to Sandy Ford) to M9 (Avonbank to E Br. Lathallan), Northbound

Start time:5th of May 2025, 8:00pm

Description:Works:
Sign Installation/Repairs

Traffic Management:
Hard Shoulder Closure.

M9 - WB - Linlithgow Loch - Lane Closure

Location:M9 (Coal Road to Bonnytoun Farm) to M9 (A706 Bridge to B8029 Bridge), Westbound

Start time:8th of January 2025, 7:30pm

Description:Works:
Drainage Works

Traffic Management:
Lane Closure.

M9 Jct 1 EB on-slip to M8. Road Closure.

Location:M9 (Start Dedicated Slip From A8 Wb to End Dedicated Slip From A8 Wb) to M8 (End Newbridge Sb On Sli

Start time:13th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Continue A89 to Dechmont Roundabout. Take 2nd exit onto A899 then take 3rd exit at Livingston Roundabout to join M8 at Jct 3 WB on-slip.

M9 Jct 1 WB off-slip. Road Closure.

Location:M9 (Start Of Newbridge Nb Off Slip to End On Slip From Newbridge Rbt) to M9 (Start Off M8 Nb Off Sli

Start time:14th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Continue M8 EB to M8 Jct 1 Hermiston Gait. Take exit to A720 WB to Gogar Roundabout then take 1st exit onto A8 to Newbridge.

M9 Jct 1A to M8 Jct 2 WB. Road Closure.

Location:M9 (B9080 Bridge to Overton Under Bridge) to M8 (W Of Claylands to Almond Bridge), Eastbound

Start time:13th of January 2025, 10:00pm

Description:Works:
Third Party Works

Traffic Management:
Road Closure.

Diversion Information:
Take M9 EB Jct 1A off-slip to M90 NB. Take M90 Jct 1A off-slip and return SB on-slip to M9 Jct 1A then take M9 EB Jct 1 off-slip to Newbridge.

Those travelling onwards to the M8 should take the 4th exit to A89 to Dechmont roundabout then take 1st exit onto A899 to Livingston roundabout and M8.

M9 Jct 5 WB off-slip. Road Closure.

Location:M9 (Slip To Lathallan Int to Start Eastbound Slip From A801) to M9 (Off Slip To A905 to A905 Cadgers

Start time:30th of December 2024, 7:30pm

Description:Works:
Landscape Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Follow M9 WB to Jct 7. Take off-slip to M876 and follow to Jct 3. Turn and return to M9 EB Jct 6 off-slip.

M9 Jct 5 WB on-slip. Road Closure

Location:M9 (A905 Cadgers Brae Rbt to Slip On To M9) to M9 (W. Br. Cadger's Brae to E. Br. Earlsgate), Westbo

Start time:6th of January 2025, 7:30pm

Description:Works:
Landscape Maintenance

Traffic Management:
Road Closure.

Diversion Information:
Follow M9 WB from Jct 5 to Jct 4 off-slip. Turn and return on M9 EB.

M9 WB Junction 9 to Junction 10

Location:M9 (C4 O'Bridge Cambusbarron to A84 O'Bridge Craigforth), Westbound

Start time:3rd of January 2025, 7:30pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 - NB - Queensferry Crossing - Lane Closure

Location:Off Network to Off Network, Northbound

Start time:11th of January 2025, 8:00pm

Description:Works:
Bridge Joint Repairs

Traffic Management:
Lane Closure.

M90 - SB - J1c - on slip closure

Location:A90 (Admiralty Jn Rbt to Entry Slip), Southbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
Continue on A985 WB to King's Road Roundabout. Take 3rd exit onto B980 NB to Pitreavie Roundabout. Take 3rd exit onto A823(M) EB joining M90 Jct 2 SB on-slip.

M90 - SB - 1B - off slip closure

Location:A90 (Ferrytoll Jn U/B to End Of A90 (Admiralty)) to A90 (Start Of A90 (Admiralty) to Ferrytoll Jn U/

Start time:21st of January 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

Diversion Information:
Continue M90 SB over Queensferry Crossing and take M90 SB Jct 1A off-slip. Take 4th exit and return M90 NB Jct 1A on-slip to M90 Jct 1B.

M90 - SB - 1C to 1B - Lane closure

Location:M90 (S/B Off Slip To A985 to S/B On Slip From A985) to A90 (Frb to Ferrytoll Jn Ub), Southbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Road Closure.

M90 - SB - jct 1a to jct 1 - lane closure

Location:Off Network to M90 (Starts Of Chevron to Farm Rd O/B), Southbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Lane Closure.

M90 - SB - south of J2a - Lane closure

Location:M90 (S0s Telephone E5 to S0s Telephone E4), Southbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Lane Closure.

M90 Arlary, Milnathort. SB - Lane closure

Location:M90 (Glenfarg Overbridge to Start Concrete Sb) to M90 (Start Concrete Sb to Slip From A91), Southbou

Start time:10th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Friarton Bridge NB - Lane clsoure

Location:M90 (Scoonieburn O'Bridge to Off Slip To A90) to M90 (Slip Rd Off to Start A90), Northbound

Start time:8th of January 2025, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M90 Friarton Bridge- Lane Closure S/B

Location:M90 (On Slip From A90 to Scconieburn O'Bridge), Southbound

Start time:23rd of December 2024, 9:30am

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

M90 Kelty SB - Lane closure

Location:M90 (P&Kc/Fc Boundary to S/B Off Slip To A909), Southbound

Start time:7th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 Kinross Off Slip NB - Lane closure

Location:M90 (Start Off Slip To A977 to A977 Rbt), Northbound

Start time:6th of January 2025, 7:30pm

Description:Works:
Gully/ironwork repairs

Traffic Management:
Lane Closure.

M90 NB - Hard Shoulder Closure - North Rosyth

Location:M90 (Off Slip To A985 to Mastertown O'Bridge) to M823 (M90 Off Slip (S) to Entry M823), Northbound

Start time:15th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Hard Shoulder Closure.

M90 NB Kelty Off slip JCT 4 - Lane closure

Location:M90 (Off Slip To A909/B914 to Junction A909/B914), Northbound

Start time:7th of January 2025, 8:00pm

Description:Works:
Barrier Repair

Traffic Management:
Lane Closure.

M90 NB jct 1a Lane closure

Location:M90 (Railway Bridge to Farm Overbridge) to Off Network, Northbound

Start time:21st of January 2025, 8:00pm

Description:Works:
Gantry Works

Traffic Management:
Lane Closure.

M90 South of Glenfarg SB - Lane closure

Location:M90 (Glenfarg Overbridge to Start Concrete Sb), Southbound

Start time:6th of January 2025, 7:30pm

Description:Works:
Carriageway Patching

Traffic Management:
Lane Closure.

Seaward Street - Lane Closure

Location:M74 (Roundabout to Start Of 1-Lane) to M74 (2 To 3 Lane to 3 To 2 Lane), Northbound

Start time:20th of January 2025, 8:00pm

Description:Works:
Lining Works, Traffic Loops

Traffic Management:
Lane Closure.