Major Events, Projects and Planned Roadworks
Planning ahead
As part of our service, work is undertaken to maintain and develop the trunk road network. Traffic Scotland works with major events organisers and partners to assess the impact of major events on road traffic. To help with your travels, or to find out more view future traffic updates below, or by using our interactive map on the homepage.
Upcoming Events and Future Roadworks
Forth Road Bridge 60th Anniversary
Roads maintained by local authorities
A83 Rest and Be Thankful | Transport Scotland Update
Get Ready for Winter
Further progress on delivering A9 Dualling Programme
Major works on the M8 in Spring 2025
National Speed Management Review Consultation
Winter Events in Scotland
Major progress on plans to dual the A9
National Speed Management Review
Keeping Scotland Moving Through Winter
M90 Halbeath Roundabout, Junction 3 | Major Works
Scottish Government exploring options on purchasing Ardrossan Port
Charting EV charging infrastructure for road freight
A96 Corridor Review published
Plan to add 24,000 public electric vehicle charge points by 2030 published
Kessock Bridge | Update on Safety Improvements
B792 Bridge Over M8 Between Bathgate and Blackburn | Major Works
A83 Inveraray | Sea Wall Repairs
Action to enhance road safety
A7 Selkirk | Pedestrian Enhancing
Progress in delivering A90/A937 Laurencekirk Junction Improvement scheme
Rail Fares Increase Confirmed
Survey shows travel still down following pandemic
Archaeological investigations set to get underway ahead of dualling the A9 between Tay Crossing and Ballinluig
Further A9 Dualling developments as ground investigation contract awarded
Port of Ardersier granted pilotage powers
National Speed Management Review consultation
A78 Seamill | Programme of Active Travel
Further £10 million confirmed for Active Travel Infrastructure Fund in 2024-2025
Motorcycle safety scheme goes global
Traffic returns at A83 Rest and Be Thankful
New report rejects rescheduling and acceleration proposals for A9 Dualling Programme
A77 Ballantrae Bridge | Essential Bridge Works
M74 Nethan Viaduct | Bridge Refurbishment
Works programme confirmed for A9 Dualling: Tomatin to Moy with preparatory works set to start on 21 October
Local Road Safety Investment | £14 Million to Support Local Authorities in Reducing Road Casualties
A9 between Keir and Broxden Roundabout | Woodland Management
Kessock Bridge | Safety Improvement Plans
M90 South Of Perth Near Glenfarg | VRS Upgrades
M90 Halbeath Roundabout | Major Works
A78 Wemyss Bay | SPEN Works
A78 Greenock | Footway Renewals
A75 Dumfries Bypass | VRS Replacement
A701 Tinwald Downs Roundabout | Drainage Work
A828 Between Ledaig and Benderloch | Rockslope Stabilisation Works
M8 Junction 13 | Essential Safety Platform Installation
M8 and M80 | Essential Gantry Refurbishment Works
M90 Kelty | Road Safety Improvements
A90 Brechin Northbound | Investigation Works
A83 North of Inverary | Sea Wall Repairs
A90 South of Rathen | Overnight Resurfacing Work
A77 between Cairnryan and Innermessan |
A9 at Alness | Programme of Multiple Works
M8 Kingston Bridge | Essential Works
A9 Ballinluig to Pitlochry | Overnight Improvements
A9 South of Drumochter | Single Carriageway Improvements
A726 College Milton | Rail Bridge Refurbishment
A9 Kessock Bridge | Painting Works
A82 Auch and Rannoch | Overnight Surfacing
A82 Tarbet And Stoneymollan | Resurfacing
B996 Glenhead bridge near Glenfarg | Structural Repairs
A830 East of Ranochan | Rockslope Works
A82 North of Corran | Rockslope Works
Broxden Roundabout | Drainage Improvements
A702 West Linton and Abington | Resurfacing
M8 Kingston Bridge Complex | Bridge Joint Replacement Works
M8 Eastbound at Polkemmet | Overnight Drainage Works
M74 Junctions 3a & 3 | Essential Resurfacing Works
A78 Eglington Interchange | Resurfacing
A96 Union Bridge in Keith | Repair Works
A83 South of Muasdale | Overnight Resurfacing
M9 Grangemouth | Fencing Works
A6091 Melrose | New Pedestrian and Cycle Path
A9 Latheron | Planned Surfacing Improvements
A835 Between Loch Glasgarnoch and Loch Droma | Resurfacing Works
A85 West of Lochawe | Rockslope Works
A90 Lonmay | Drainage Improvements
M9 Junction 9 | Drainage Improvements
A90 Laurencekirk Bypass | Drainage Works
A985 Admiralty Road | SGN Roadworks
M9 Junction 1B Winchburgh | Bridge Works
Scottish Motorcycle Show | Royal Highland Centre
Six Nations 2025 - Scotland V Wales
A90 North Water bridge in Aberdeenshire | Safety Improvements
A78 Wemyss Bay | Network Rail Works
A737 Dalry Bypass | Traffic Management
A9 Dualling Tomatin to Moy | Significant Temporary Traffic Management Measures Including 40MPH Speed Limit
A8 East Hamilton Street | Drainage Improvements
A85 Loch Iubhair | Surfacing Improvements
Girvan Dalrymple Street | BT Continuous Works
A85 Gilmerton | Drainage Works
A96 Nairn | Drainage Improvements
A84 Kilmahog | Essential Landscaping
A85 Falls of Cruachan | Bridge Maintenance Works
M9 Junction 5-1B | Resurfacing
A95 And A941 Craigellachie | Road Marking Works
A92 Cupar | Drainage Surveys
A9 Dualling: Tomatin to Moy | Traffic Management
A737 Linwood | Resurfacing
M8 Whitecart Viaduct | Inspection Works
M8 Junction 3 | Upgrading Streetlighting
M9 Junctions 9 and 11 | Bridge Works
A82 North Of Crianlarich | Resurfacing
A96 North Of Huntly | Resurfacing
A720 Dreghorn and Lothianburn | Resurfacing
A82 Near Inchree | Resurfacing
Halbeath Roundabout Dunfermline | Contraflow
A1 Coldingham Junction | Resurfacing Works
A76 Enterkinfoot | Urgent Surfacing Works
UEFA Nations League Scotland V Greece | Hampden Park
M8 Junction 3 | Bridge Inspection Works
A87 Broadford | Surfacing Improvements
M876 Junction 1 | Resurfacing
A85 Dunollie Road | Overnight Surfacing
A8 Greenock Road by Network Rail | Survey Works
M8 Westbound Junction 3A | Resurfacing
A92 Stonehaven | Network Rail Works
M8 Junctions 5 & 4a | Major Works Spring Programme
Scottish Championship Car Racing Round 1 | Knockhill
Scotland Women's Football - Scotland V Germany
Scottish Championship Bike Racing - Round One
Network Rail Langbank Road Closure 18th-19th April | Railway Bridge Survey
Terminal V Festival | The Royal Highland Centre
A9 Tomatin to Moy | Information for abnormal loads using the A9 between from April 2025
Bridge Carrying A84 Over M9 | Deck Repairs
Stereofunk Festival 2025
Network Rail Langbank Road Closure 16th-17th May | Railway Bridge Survey
Network Rail Langbank Road Closure 13th-14th June | Railway Bridge Survey
Network Rail Langbank Road Closure 11th-12th July | Railway Bridge Survey
Network Rail Langbank Road Closure 8th-9th August | Railway Bridge Survey
Network Rail Langbank Road Closure 5th-6th September | Railway Bridge Survey
Network Rail Langbank Road Closure 3rd-4th October | Railway Bridge Survey
Network Rail Langbank Road Closure 31st October-1st November | Railway Bridge Survey
Planned roadworks
-
6th of March 2025, 7:30pm8th of March 2025, 6:00amA7 - SB - Hawick - Temp light
-
7th of March 2025, 8:00pm8th of March 2025, 6:00amM90 SB - Lane Closure - QC Jct1B
-
9th of March 2025, 12:01am9th of March 2025, 12:02amA90 North Water Bridge, Sth of Laurencekirk. No longer required, No obstruction in carriageway
-
9th of March 2025, 6:01am9th of March 2025, 7:59pmM74 NB Jct 3a - 3 - Lane Closures
-
9th of March 2025, 7:00am9th of March 2025, 4:00pmA78 SB Irvine Bypass Eglinton IC offslip - Slip Closure
-
9th of March 2025, 7:00am9th of March 2025, 4:00pmA78 NB Irvine Bypass Eglinton IC offslip - Closure
-
9th of March 2025, 8:00am9th of March 2025, 6:00pmA85 High St Crieff - Diversion Signage
-
9th of March 2025, 8:00am9th of March 2025, 5:00pmA90 Crimmond- TTL S/B
-
9th of March 2025, 12:00pm17th of March 2025, 9:30amA82 Spean Bridge - Vergeworks
-
9th of March 2025, 12:00pm17th of March 2025, 9:30amA86 Spean Bridge - Vergeworks
-
9th of March 2025, 7:30pm10th of March 2025, 6:30amA96 George V Avenue Rbt, Huntly . Lane 1 closure
-
9th of March 2025, 7:30pm15th of March 2025, 6:30amA96 Inverurie WB - Temporary traffic signals
-
9th of March 2025, 7:30pm17th of March 2025, 6:00amA1 - NB - Eyemouth Junction - Temp Lights
-
9th of March 2025, 7:30pm17th of March 2025, 6:00amA1 - SB - Eyemouth Junction - Temp Lights
-
9th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Keithock to Stracathro - Convoy N/B
-
9th of March 2025, 8:00pm10th of March 2025, 6:00amM9 SB - Lane Closure - Near Keir Rbt
-
9th of March 2025, 8:00pm10th of March 2025, 6:00amM74 NB Jct 3 to Jct 1 - Mobile Lane Closures
-
9th of March 2025, 8:00pm10th of March 2025, 6:00amM74 NB Between the slips at Jct 1A - Lane Closure
-
9th of March 2025, 8:00pm10th of March 2025, 6:00amM74 SB Between Jct 7 & Jct 8 - Lane Closure
-
9th of March 2025, 8:00pm10th of March 2025, 6:00amM74 NB Between Jct 7 & Jct 8 - Lane Closure
-
9th of March 2025, 10:00pm10th of March 2025, 6:00amA78 SB Shore Rd Wemyss Bay - Road Closure
-
9th of March 2025, 10:00pm10th of March 2025, 6:00amA78 NB Shore Rd Wemyss Bay - Road Closure
-
10th of March 2025, 12:00am31st of March 2025, 6:00amA8 WB East Hamilton Street- Lane Closure
-
10th of March 2025, 12:00am2nd of June 2025, 6:00amA737 SB Between Highfield Rbt & Hillend Rbt - Road Closure
-
10th of March 2025, 12:00am2nd of June 2025, 6:00amA737 NB Between Highfield Rbt & Hillend Rbt - Road Closure
-
10th of March 2025, 7:00am31st of March 2025, 6:00pmA85 Loch Lubhair East of Crianlarich - Convoy Works
-
10th of March 2025, 7:00am31st of May 2028, 7:00pmA9 Layby 155 Findhorn Bridge NB - Layby Closure
-
10th of March 2025, 7:00am31st of May 2028, 7:00pmA9 Layby 172 North of Moy SB - Layby Closure
-
10th of March 2025, 7:00am31st of May 2028, 7:00pmA9 Tomatin - Moy - Narrow Lanes
-
10th of March 2025, 7:00am10th of March 2025, 7:00pmA86 Roybridge WB - TTL
-
10th of March 2025, 7:00am10th of March 2025, 7:00pmA86 Roybridge EB - TTL
-
10th of March 2025, 7:00am11th of March 2025, 5:00pmA75 WB Larglea to Bettyknowes - TTL's
-
10th of March 2025, 7:00am11th of March 2025, 5:00pmA75 EB Larglea to Bettyknowes -TTL's
-
10th of March 2025, 7:00am11th of March 2025, 5:00pmA75 WB The Glen - Lane Closure
-
10th of March 2025, 7:00am21st of March 2025, 7:00pmA87 Kyleakin to Ashaig East of Broadford WB - TTL
-
10th of March 2025, 7:00am21st of March 2025, 7:00pmA87 Kyleakin to Ashaig East of Broadford EB - TTL
-
10th of March 2025, 7:30am14th of March 2025, 4:30pmA9 Greenloaning to Auchterarder NB - Diversion signage for local road closure
-
10th of March 2025, 8:00am10th of March 2025, 4:00pmM74 NB J22-J21 - Lane Closure
-
10th of March 2025, 8:00am10th of March 2025, 4:00pmM74 SB J21-J22 - Lane Closure
-
10th of March 2025, 8:00am11th of March 2025, 4:30pmA85 Gilmerton WB - TTL
-
10th of March 2025, 8:00am11th of March 2025, 4:30pmA85 Gilmerton EB - TTL
-
10th of March 2025, 8:00am14th of March 2025, 4:30pmA85 Comrie Street Crieff - Diversion Signage
-
10th of March 2025, 8:00am24th of March 2025, 5:00pmA90 Cross Street, Fraserburgh - Diversion Signage
-
10th of March 2025, 8:00am14th of March 2025, 5:00pmA95 Aberlour - Diversion Signage
-
10th of March 2025, 8:00am21st of March 2025, 5:00pmA95 Maggieknocketer, Craigellachie - Diversion Signage
-
10th of March 2025, 8:00am12th of March 2025, 4:00pmM8 EB Jct 25A onslip - Hard Shoulder Closure
-
10th of March 2025, 8:00am1st of June 2025, 11:59pmA737 NB Between Highfield Rbt & Hillend Rbt - Lane Closure
-
10th of March 2025, 8:00am1st of June 2025, 11:59pmA737 NB Between Highfield Rbt & Hillend Rbt - Lane Closure
-
10th of March 2025, 8:00am12th of March 2025, 5:00pmA95 Aberlour- TTL N/B
-
10th of March 2025, 8:00am14th of March 2025, 6:00pmA82 Bridge of Orchy NB - TTL
-
10th of March 2025, 8:00am14th of March 2025, 6:00pmA82 Bridge of Orchy SB - TTL
-
10th of March 2025, 8:00am30th of June 2025, 5:00pmA96 Regent St,Keith- Scaffold- E/B
-
10th of March 2025, 8:00am10th of March 2025, 2:00pmA84 Doune NB - TTL
-
10th of March 2025, 8:00am10th of March 2025, 2:00pmA84 Doune SB - TTL
-
10th of March 2025, 8:00am12th of March 2025, 5:00pmA77 SB Dalrymple St Girvan - Road Closure
-
10th of March 2025, 8:00am28th of April 2025, 5:00pmA95 Btwn Grantown and Ballindalloch. Diversion signage for local road closure
-
10th of March 2025, 8:00am10th of March 2025, 5:00pmM9 SB - Sign works - Winchburgh
-
10th of March 2025, 8:00am9th of May 2025, 6:00pmA7 SB Hawick to Teviothead. Stop/Go Boards
-
10th of March 2025, 8:00am9th of May 2025, 6:00pmA7 NB Hawick to Teviothead. Stop/Go Boards
-
10th of March 2025, 8:00am11th of March 2025, 4:00pmA75 WB East of Mossyard - TTL's
-
10th of March 2025, 8:00am11th of March 2025, 4:00pmA75 EB East of Mossyard - TTL's
-
10th of March 2025, 9:00am13th of March 2025, 5:00pmA85 Gilmerton to Fowlis Wester - Diversion Signage
-
10th of March 2025, 9:00am2nd of May 2025, 5:00pmA830 Beasdale WB - TTL
-
10th of March 2025, 9:00am2nd of May 2025, 5:00pmA830 Beasdale EB - TTL
-
10th of March 2025, 9:00am21st of March 2025, 5:00pmA86 Banchor Beag Newtonmore EB - TTL
-
10th of March 2025, 9:00am21st of March 2025, 5:00pmA86 Banchor Beag Newtonmore WB - TTL
-
10th of March 2025, 9:00am14th of March 2025, 4:00pmA87 Invergarry EB - TTL
-
10th of March 2025, 9:00am14th of March 2025, 4:00pmA87 Invergarry WB - TTL
-
10th of March 2025, 9:00am10th of March 2025, 4:00pmA9 Moy NB - TTL
-
10th of March 2025, 9:00am10th of March 2025, 4:00pmA9 Moy SB - TTL
-
10th of March 2025, 9:00am14th of March 2025, 5:00pmA985 - EB - Kincardine - Lane closure
-
10th of March 2025, 9:00am14th of March 2025, 5:00pmA82 Ballachulish SB - TTL
-
10th of March 2025, 9:00am14th of March 2025, 5:00pmA82 Ballachulish NB - TTL
-
10th of March 2025, 9:30am10th of March 2025, 4:00pmA90 Blackdog southbound off slip - lane closure
-
10th of March 2025, 9:30am10th of March 2025, 4:00pmA90 North Kingswells northbound off slip - hard shoulder closure
-
10th of March 2025, 9:30am10th of March 2025, 4:00pmA90 Fastlink southbound - lane closure
-
10th of March 2025, 9:30am10th of March 2025, 4:00pmA90 Stonehaven Roundabout - lane closure
-
10th of March 2025, 9:30am10th of March 2025, 4:00pmB979 northbound - lane closure
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA702 - SB - Hillend - temp lights
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA702 - NB - Hillend - temp lights
-
10th of March 2025, 9:30am12th of March 2025, 7:00pmA737 SB Dalry Rd Kilwinning - TTLS
-
10th of March 2025, 9:30am12th of March 2025, 7:00pmA737 NB Dalry Rd Kilwinning - TTLS
-
10th of March 2025, 9:30am12th of March 2025, 7:00pmA738 NB Byres Rd Kilwinning - TTLS
-
10th of March 2025, 9:30am12th of March 2025, 7:00pmA738 SB Byres Rd Kilwinning - TTLS
-
10th of March 2025, 9:30am11th of March 2025, 3:30pmA75 EB Between Cargenbridge & Haugh of Urr - Route Part of Diversion
-
10th of March 2025, 9:30am11th of March 2025, 3:30pmA75 WB Between Cargenbridge & Haugh of Urr - Route Part of Diversion
-
10th of March 2025, 9:30am11th of March 2025, 3:30pmA9 Alness NB - TTL
-
10th of March 2025, 9:30am11th of March 2025, 3:30pmA9 Alness SB - TTL
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA75 WB Castle Kennedy to A751 - TTL
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA75 EB Castle Kennedy to A751 - TTL
-
10th of March 2025, 9:30am10th of March 2025, 4:30pmA75 WB London Road @ Westwood Jct - TTLS
-
10th of March 2025, 9:30am10th of March 2025, 4:30pmA75 EB London Road @ Westwood Jct - TTLS
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA90 Barnhill Interchange, Perth. W/B TTL's
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA86 Kingussie EB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA96 Pitcaple WB - Temporary traffic signals
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA86 Kingussie WB - TTL
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA82 WB Stirling Rd, Milton- Lane closure
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmA9 Berridale NB - TTL
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmA9 Berridale SB - TTL
-
10th of March 2025, 9:30am4th of April 2025, 3:30pmA9 Lothmore to Portgower NB - TTL
-
10th of March 2025, 9:30am4th of April 2025, 3:30pmA9 Lothmore to Portgower SB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 4:00pmA830 Corpach WB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 4:00pmA830 Corpach EB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA82 Spean Bridge SB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA82 Spean Bridge NB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA86 Spean Bridge EB - TTL
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA86 Spean Bridge WB - TTL
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA90 St Fergus- Peterhead- TTL N/B
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA90 Lonmay- TTL S/B
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA90 Lonmay- TTL S/B
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA78 Sharphill NB - Lane Closure
-
10th of March 2025, 9:30am21st of March 2025, 3:30pmA737 SB By Pass Road to South Manrahead Rbt - TTL's
-
10th of March 2025, 9:30am21st of March 2025, 3:30pmA96 Blackhillock, Keith- Stop/Go S/B
-
10th of March 2025, 9:30am21st of March 2025, 3:30pmA737 NB South Manrahead Rbt to By Pass Road - TTL's
-
10th of March 2025, 9:30am21st of March 2025, 3:30pmA737 NB South Manrahead Rbt, Beith - TTL's
-
10th of March 2025, 9:30am10th of March 2025, 4:00pmM80 - NB - Jct 9 off slip - Lane Closure
-
10th of March 2025, 9:30am10th of March 2025, 4:30pmA7 NB - TTL's - Boleside, North of Selkirk
-
10th of March 2025, 9:30am10th of March 2025, 4:30pmA7 SB - TTL's - Boleside, North of Selkirk
-
10th of March 2025, 9:30am10th of March 2025, 4:30pmA7 NB - TTL's - Hawick
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA77 Dipple Girvan SB- TTL
-
10th of March 2025, 9:30am10th of March 2025, 4:30pmA7 SB - TTL's - Hawick
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA77 Dipple Girvan NB- TTL
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA96 Auldearn TTL W/B
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA96 Huntly TTL W/B
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA9 Nth of Aberuthven. S/B Lane 1 closure
-
10th of March 2025, 9:30am14th of March 2025, 4:30pmA6091 WB - TTL's - Melrose
-
10th of March 2025, 9:30am14th of March 2025, 4:30pmA6091 EB - TTL's - Melrose
-
10th of March 2025, 9:30am10th of March 2025, 3:30pmA85 Gilmerton to Lix Toll - Diversion Signage
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmA75 WB Castle Kennedy - TTL
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmA75 EB Castle Kennedy - TTL
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA75 WB Stranraer to Newton Stewart - Stop and Go
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA75 EB Stranraer to Newton Stewart - Stop and Go
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA75 WB Gretna to Dumfries - Stop and Go
-
10th of March 2025, 9:30am11th of March 2025, 3:30pmA90 Laurencekirk. N/B Lane Closure
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA75 EB Gretna to Dumfries - Stop and Go
-
10th of March 2025, 9:30am14th of March 2025, 3:30pmA96 Westerlea Hotel, Nairn. W/B Lane closure
-
10th of March 2025, 9:30am10th of March 2025, 2:00pmA82 Glengarry House South of Tyndrum SB - TTL
-
10th of March 2025, 9:30am10th of March 2025, 2:00pmA82 Glengarry House South of Tyndrum NB - TTL
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmM80 N/B between J4a Low Wood and J5 Auchenkilns - Hardshoulder Closure
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmM80 N/B J5 Auchenkilns, between the slips - Hardshoulder Closure
-
10th of March 2025, 9:30am12th of March 2025, 3:30pmM80 N/B prior to J6 Old Inns - Hardshoulder Closure
-
10th of March 2025, 9:30am16th of March 2025, 3:30pmA85 Arinabea West of Tyndrum WB - TTL
-
10th of March 2025, 9:30am16th of March 2025, 3:30pmA85 Arinabea West of Tyndrum EB - TTL
-
10th of March 2025, 9:30am11th of March 2025, 3:30pmM80 NB Jct 2 On slip Lane Closure
-
10th of March 2025, 10:00am10th of March 2025, 4:00pmA84 Buchany NB - TTL
-
10th of March 2025, 10:00am10th of March 2025, 4:00pmA84 Buchany SB - TTL
-
10th of March 2025, 10:00am10th of March 2025, 1:00pmA887 Torgyle EB - TTL
-
10th of March 2025, 10:00am10th of March 2025, 1:00pmA887 Torgyle WB - TTL
-
10th of March 2025, 10:30am10th of March 2025, 2:00pmA92 Freuchie - TTL's
-
10th of March 2025, 1:00pm10th of March 2025, 4:00pmA86 Cluny Mains East of Balgowan - Stop/Go Works
-
10th of March 2025, 2:00pm10th of March 2025, 4:00pmA87 Cluanie Dam West of Bun Loyne EB - TTL
-
10th of March 2025, 2:00pm10th of March 2025, 4:00pmA87 Cluanie Dam West of Bun Loyne WB - TTL
-
10th of March 2025, 6:00pm28th of March 2025, 7:00amA85 Loch Lubhair East of Crianlarich WB - TTL
-
10th of March 2025, 6:00pm28th of March 2025, 7:00amA85 Loch Lubhair East of Crianlarich EB - TTL
-
10th of March 2025, 7:00pm5th of April 2025, 7:00amA9 Longman Rd Rnbt to Raigmore Inverness SB - Lane Closure
-
10th of March 2025, 7:00pm5th of April 2025, 7:00amA9 Longman Rd Rnbt to Raigmore Inverness NB - Lane Closure
-
10th of March 2025, 7:00pm5th of April 2025, 7:00amA9 Raigmore Onslip Inverness NB - Lane Closure
-
10th of March 2025, 7:00pm5th of April 2025, 7:00amA82 Approaching Longman Rd Rnbt Inverness NB - Lane Closure
-
10th of March 2025, 7:00pm25th of March 2025, 6:00amA84 Kilmahog to Strathyre NB - Road Closure with Amnesties
-
10th of March 2025, 7:00pm25th of March 2025, 6:00amA84 Kilmahog to Strathyre SB - Road Closure with Amnesties
-
10th of March 2025, 7:00pm20th of March 2025, 6:00amA9 Dunkeld to Ballinluig SB - Diversion Signage
-
10th of March 2025, 7:00pm20th of March 2025, 6:00amA9 Dunkeld to Ballinluig NB - Diversion Signage
-
10th of March 2025, 7:00pm18th of March 2025, 6:00amA85 Falls of Cruachan West of Lochawe - Convoy Works
-
10th of March 2025, 7:30pm29th of March 2025, 6:30amA92 Five Roads Rbt to Freuchie - TTL S/B
-
10th of March 2025, 7:30pm11th of March 2025, 6:00amA1 - SB - Wallyford - Lane Closure
-
10th of March 2025, 7:30pm11th of March 2025, 6:00amA1 - SB - Wallyford off-slip. Road Closure
-
10th of March 2025, 7:30pm29th of March 2025, 6:00amA9 Tomatin - Moy - Convoy Works
-
10th of March 2025, 7:30pm11th of March 2025, 6:00amA1 - SB - Wallyford on-slip - Road Closure
-
10th of March 2025, 7:30pm15th of March 2025, 6:30amA95 N/B Craigellachie Jct / A941 - Convoy
-
10th of March 2025, 7:30pm15th of March 2025, 6:30amA95 S/B Craigellachie Jct / A941 - Convoy
-
10th of March 2025, 7:30pm11th of March 2025, 6:30amA90 North Water Br- Lane Closure N/B
-
10th of March 2025, 7:30pm11th of March 2025, 6:30amA90 Mill of Conveth, Fourdon- Lane Closure S/B
-
10th of March 2025, 7:30pm15th of March 2025, 6:30amA985 EB - TTL's - Admiralty Road
-
10th of March 2025, 7:30pm15th of March 2025, 6:30amA985 WB - TTL's - Admiralty Road
-
10th of March 2025, 7:30pm11th of March 2025, 5:00amA90 Longhaven- Convoy N/B
-
10th of March 2025, 7:30pm12th of March 2025, 6:00amA702 - NB - West Linton - Closure
-
10th of March 2025, 7:30pm12th of March 2025, 6:00amA702 - SB - West Linton - Closure
-
10th of March 2025, 7:30pm29th of March 2025, 6:00amA1 - SB - Wallyford to Abbotsview - Lane closure
-
10th of March 2025, 8:00pm22nd of March 2025, 4:00amM8- Eastbound- jct 3 off slip- slip closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM8 EB Jct 13 - Lane Closure
-
10th of March 2025, 8:00pm18th of March 2025, 6:00amM8 Jct 27 onslip WB - Total Closure
-
10th of March 2025, 8:00pm18th of March 2025, 6:00amM8 Jct 27 to Jct 28 WB - Lane Closures
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA77 NB Holmston to Bankfield - TTLS
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA77 SB Holmston to Bankfield - TTLS
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amM9 WB - Jct 9 to Jct 11 Road Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amM9 EB - Jct 11 to Jct 10 Lane 2 Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amM80 WB Jct 9 to M9 Jct 11 - Road Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amM9 WB - Jct 10 off slip - Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA9 Crossgates to Nth of Tibbermore, N/B Lane 2 closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amM9 WB - Jct 10 on slip - Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA9 Nth of Tibbermore to Crossgates, S/B Lane 2 closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA83 Muasdale NB - TTL
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA83 Muasdale SB - TTL
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM74 Jct 5 - 6 SB Lane Closures
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM74 Jct 6 - 5 NB Lane Closures
-
10th of March 2025, 8:00pm16th of March 2025, 6:00amM8 WB Jct 28A Onslip - A737 - Johnstone - Total closure
-
10th of March 2025, 8:00pm16th of March 2025, 6:00amM8 WB Jct 29 St James Onslip - Total closure
-
10th of March 2025, 8:00pm16th of March 2025, 6:00amA737 WB Offslip to Linwood - Total closure
-
10th of March 2025, 8:00pm16th of March 2025, 6:00amA737 WB Onslip from Linwood - Total closure
-
10th of March 2025, 8:00pm16th of March 2025, 6:00amA737 WB Offslip - Johnstone - Total closure
-
10th of March 2025, 8:00pm16th of March 2025, 6:00amM8 WB Jct 28 - 28A - Lane Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM8 Eastbound Junction 6A to Junction 6 Newhouse - Total closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA8 Westbound Bargeddie Rbt to Swinton Rbt - Nearside lane closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM74 Northbound Junction 6 to Junction 5 - Offside lane closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM74 Southbound Junction 5 to Junction 6- Offside lane closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA78 Meadowhead to Newhouse NB - Lane closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA78 Eglington off slip NB - Lane Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM9 - WB - Jct 5 - Lane closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM74 Jct 10 onslip SB - Total Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM74 Jct 8 onslip SB - Total Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA725 EB E Kilbride Expy- Nearside Lane Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA725 EB Off Slip to B7012 E Kilbride Expy - Slip Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amB7012 On Slip to A725 E Kilbride Expy EB - Slip Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA725 WB E Kilbride Expy- Nearside Lane Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA725 WB Off Slip E Kilbride Expy - Slip Closure
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA702 NB - Road Narrowing - Abington Rbt
-
10th of March 2025, 8:00pm12th of March 2025, 6:00amA725 WB On Slip E Kilbride Expy - Slip Closure
-
10th of March 2025, 8:00pm13th of March 2025, 6:00amA78 Sharphill Rbt - Chapelhill Rbt SB - Road Closure
-
10th of March 2025, 8:00pm15th of March 2025, 6:00amM9 - WB - Jct 6 to Jct 7 - Lane Closure
-
10th of March 2025, 8:00pm15th of March 2025, 6:00amM9 - EB - Jct 7 to Jct 6 - Lane Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amA720 - EB - Lasswade - Off slip closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM8 WB Between Jct 21 & Jct 22- Lane Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM8 WB Jct 22 to M77 - Slip Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM8 WB Jct 22 to M77 Jct 1 - Lane Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM77 SB Jct 1 to Jct 2 - Road Closure
-
10th of March 2025, 8:00pm11th of March 2025, 6:00amM77 SB Jct 1 On slip - Slip Closure
-
11th of March 2025, 7:00am16th of May 2025, 7:00pmA86 Inveroy West of Roybridge WB - TTL
-
11th of March 2025, 7:00am16th of May 2025, 7:00pmA86 Inveroy West of Roybridge EB - TTL
-
11th of March 2025, 7:00am18th of April 2025, 7:00pmA82 Auchreoch North of Crainlarich - Convoy Works
-
11th of March 2025, 8:00am12th of March 2025, 4:00pmM74 SB J14-J15 - Lane Closure
-
11th of March 2025, 8:00am11th of March 2025, 4:00pmA82 Tyndrum - Vergeworks
-
11th of March 2025, 8:00am11th of March 2025, 11:00amA9 Auldwell North of Borgue - Stop/Go Works
-
11th of March 2025, 8:00am11th of March 2025, 1:00pmA9 Lynwilg South of Aviemore NB - TTL
-
11th of March 2025, 8:00am11th of March 2025, 1:00pmA9 Lynwilg South of Aviemore SB - TTL
-
11th of March 2025, 8:00am13th of March 2025, 4:00pmA82 Arden to Tarbet - MLC
-
11th of March 2025, 8:00am13th of March 2025, 5:00pmA8 WB approach to Bullring Rbt - Lane Closure
-
11th of March 2025, 9:00am12th of March 2025, 6:00pmA7 SB Commercial Road, Hawick. Portable Traffic Lights.
-
11th of March 2025, 9:00am12th of March 2025, 6:00pmA7 NB Commercial Road, Hawick. Portable Traffic Lights.
-
11th of March 2025, 9:30am12th of March 2025, 3:30pmA75 WB Barlae - TTL
-
11th of March 2025, 9:30am12th of March 2025, 3:30pmA75 EB Barlae - TTL
-
11th of March 2025, 9:30am16th of March 2025, 3:30pmA90 Boddam NB - Temporary traffic signals
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmM77 NB Jct 4-3 HS Closure
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA90 Lonmay- TTL S/B
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA90 Rathen- TTL S/B
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA90 Kirktown Brae, Fraserburgh- TTL N/B
-
11th of March 2025, 9:30am12th of March 2025, 3:30pmA90 Fourdon- Lane Closure N/B
-
11th of March 2025, 9:30am11th of March 2025, 4:30pmA7 NB - TTL's - Mosspeebles, North of Laangholm
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA77 Minishant SB - TTLS
-
11th of March 2025, 9:30am11th of March 2025, 4:30pmA7 SB - TTL's - Mosspeebles, North of Laangholm
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA77 Minishant NB - TTLS
-
11th of March 2025, 9:30am11th of March 2025, 4:30pmA7 SB - TTL's - Phaup Cottage
-
11th of March 2025, 9:30am11th of March 2025, 4:30pmA7 NB - TTL's - Phaup Cottage
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA90 Adjacent to Kinfauns off slip. N/B Lane 1 closure
-
11th of March 2025, 9:30am11th of March 2025, 4:30pmA7 NB - TTL's - Hoghill
-
11th of March 2025, 9:30am11th of March 2025, 4:30pmA7 SB - TTL's - Hoghill
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA8 Eastbound Showcase on-slip - Total closure
-
11th of March 2025, 9:30am12th of March 2025, 4:30pmA68 NB - TTL's - Lillardsedge Caravan Park
-
11th of March 2025, 9:30am12th of March 2025, 4:30pmA68 SB - TTL's - Lillardsedge Caravan Park
-
11th of March 2025, 9:30am19th of March 2025, 3:30pmA92 Edenstown, Ladybank. S/B TTL's
-
11th of March 2025, 9:30am13th of March 2025, 3:30pmM80 S/B J6 Old Inns, between the slips - Hardshoulder Closure
-
11th of March 2025, 9:30am13th of March 2025, 3:30pmM80 S/B J3 Hornshill off-slip - Hardshoulder Closure
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA82 Dunglass to Milton NB - Offside Lane Closure
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA82 Milton to Dunglass SB - Offside Lane Closure
-
11th of March 2025, 9:30am14th of March 2025, 4:00pmA78 SB Wemyss Bay to Skelmorlie - TTLS
-
11th of March 2025, 9:30am14th of March 2025, 4:00pmA78 NB Wemyss Bay to Skelmorlie - TTLS
-
11th of March 2025, 9:30am11th of March 2025, 3:30pmA78 NB High St approach to Bullring - Lane Closure
-
11th of March 2025, 9:30am14th of March 2025, 3:30pmA78 NB at the Bullring Rbt - Lane Closure
-
11th of March 2025, 9:30am13th of March 2025, 4:30pmA77 SB Cairnryan Road Stranraer- TTLS
-
11th of March 2025, 9:30am13th of March 2025, 4:30pmA77 NB Cairnryan Road Stranraer- TTLS
-
11th of March 2025, 11:00am11th of March 2025, 1:30pmA9 Toremore North of Dunbeath - Stop/Go Works
-
11th of March 2025, 1:00pm11th of March 2025, 4:30pmA9 Aviemore NB - TTL
-
11th of March 2025, 1:00pm11th of March 2025, 4:30pmA9 Aviemore SB - TTL
-
11th of March 2025, 1:30pm11th of March 2025, 4:30pmA9 Spittal Windfarm Tacher - Stop/Go Works
-
11th of March 2025, 6:30pm12th of March 2025, 6:00amA95 Keith- TTL S/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA9 off slip Ashfield- Slip closure N/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA9 Dunblane NB - MVMS Board
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Middlebank Frm- Inchture- Lane Closure S/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Inchmichael slip- Lane Closure N/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Kingsway- lane Closure N/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Kingsway- Lane Closure S/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Keithock to Stracathro - On slip closure N/B
-
11th of March 2025, 7:30pm12th of March 2025, 6:30amA90 Keithock to Stracathro - Off slip closure N/B
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA8 EB Greenock Road - Lane 2 Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA8 WB Greenock Road - Lane 2 Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM8 WB Jct 30 Lane 2 Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM8 EB Jct 30 Lane 2 Closure
-
11th of March 2025, 8:00pm13th of March 2025, 6:00amM77 - Jct 5 Northbound total closure.
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA83 Loch Restil Rest and Be Thankful NB - TTL
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA83 Loch Restil Rest and Be Thankful SB - TTL
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA9 Nth of Tibbermore to Crossgates, N/B Lane 1 closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA725 Northbound Orbiston to Bellziehill - total closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA725 Northbound Strathclyde Business Park off-slip - Total closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amA77 SB Grassyards to Spitalhill - Lane closure
-
11th of March 2025, 8:00pm12th of March 2025, 5:30amA90 S/B Forfar A926 - TTL's
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM8 WB Between the slips at Jct 26 - Lane Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM9 - EB - Jct 9 off slip - Lane Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM8 EB Jct 29 to Jct 28 - Total Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM8 EB Jct 29 on Slip Total Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM8 Jct 30 EB onslip to the M898 NB - Total Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM898 offslip to Spectacles NB - Total Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM898 to A898 NB - Nearside Lane Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM77 NB between Jct 4 & Jct 3- Road Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM77 NB between Jct 5 & Jct 3- Road Closure
-
11th of March 2025, 8:00pm12th of March 2025, 6:00amM77 NBJct 4 Onslip Road Closure
-
11th of March 2025, 8:30pm12th of March 2025, 6:00amM8 - WB - Jct 3A - Lane Closure
-
11th of March 2025, 9:00pm12th of March 2025, 4:00amA725 WB E Kilbride Expy at High Blantyre - Lane Closure
-
12th of March 2025, 12:01am12th of March 2025, 12:02amno obstruction
-
12th of March 2025, 8:00am14th of March 2025, 5:00pmA90 Toll of Birness- Diversion signage S/B
-
12th of March 2025, 8:00am19th of March 2025, 6:30amA96 Newton Cottages Cairnie - W/B Road Closure, Convoy, TTL's
-
12th of March 2025, 8:00am14th of March 2025, 5:00pmA96 Forres- Diversion sign age E/B
-
12th of March 2025, 8:00am14th of March 2025, 4:00pmM8 WB prior to Jct 27 - Hard Shoulder Closure
-
12th of March 2025, 8:00am17th of March 2025, 5:00pmA90 South of Longhaven- TTL N/B
-
12th of March 2025, 8:00am12th of March 2025, 3:00pmA828 Benderloch NB - TTL
-
12th of March 2025, 8:00am12th of March 2025, 3:00pmA828 Benderloch SB - TTL
-
12th of March 2025, 8:00am12th of March 2025, 12:00pmA85 Stone Hill East of Dalmally - Stop/Go Works
-
12th of March 2025, 8:00am12th of March 2025, 11:00amA9 Brora - Stop/Go Works
-
12th of March 2025, 8:00am12th of March 2025, 12:30pmA9 North of Layby 98 Crubenmore NB - TTL
-
12th of March 2025, 8:00am12th of March 2025, 12:30pmA9 North of Layby 98 Crubenmore SB - TTL
-
12th of March 2025, 8:00am18th of March 2025, 5:00pmA82 North of Tyndrum NB - TTL
-
12th of March 2025, 8:00am18th of March 2025, 5:00pmA82 North of Tyndrum SB - TTL
-
12th of March 2025, 8:00am12th of March 2025, 5:00pmA835 Aultguish WB - TTL
-
12th of March 2025, 8:00am12th of March 2025, 5:00pmA835 Aultguish EB - TTL
-
12th of March 2025, 9:00am14th of March 2025, 6:00pmA90 Forfar NB - Diversion signage for local road closure
-
12th of March 2025, 9:00am12th of March 2025, 3:00pmA82 Tarbet - Stop/Go Works
-
12th of March 2025, 9:00am12th of March 2025, 3:00pmA82 Drumnadrochit NB - TTL
-
12th of March 2025, 9:00am12th of March 2025, 3:00pmA82 Drumnadrochit SB - TTL
-
12th of March 2025, 9:30am14th of March 2025, 3:30pmA726 EB Queensway - Lane Closure
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA7 SB Selkirk. Portable Traffic Lights.
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA7 NB Selkirk. Portable Traffic Lights.
-
12th of March 2025, 9:30am13th of March 2025, 3:30pmA77 SB Between Ayr to Stranraer - Road part of Diversion
-
12th of March 2025, 9:30am13th of March 2025, 3:30pmA77 NB Between Ayr to Stranraer - Road part of Diversion
-
12th of March 2025, 9:30am13th of March 2025, 3:30pmA75 EB Stranraer & Castle Douglas - Road part of Diversion
-
12th of March 2025, 9:30am13th of March 2025, 3:30pmA75 WB Stranraer & Castle Douglas - Road part of Diversion
-
12th of March 2025, 9:30am12th of March 2025, 7:00pmA737 SB Dalry Road Jct Park Lane Kilwinning - TTLS
-
12th of March 2025, 9:30am12th of March 2025, 7:00pmA737 NB Dalry Road Jct Park Lane Kilwinning - TTLS
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA9 Aberuthven- Lane Closure S/B
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA737 Barrochan over bridge - No obstruction on Cway or Fway
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA90 Kirktown brae, Fraserburgh- TTL S/B
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA90 Saulton Place, Fraserburgh- TTL S/B
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA8 Westbound Showcase to Bargeddie Rbt - Nearside lane closure
-
12th of March 2025, 9:30am13th of March 2025, 3:30pmA90 Drumlithie- Lane Closure N/B
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA77 Kirkoswald SB - TTLS
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA77 Kirkoswald NB - TTLS
-
12th of March 2025, 9:30am12th of March 2025, 3:30pmA9 North of Sheriffmuir, Greenloaning. S/B Lane 2 closure
-
12th of March 2025, 9:30am12th of March 2025, 4:30pmA7 SB - TTL's - Linhope
-
12th of March 2025, 9:30am12th of March 2025, 4:30pmA7 NB - TTL's - Linhope
-
12th of March 2025, 11:00am12th of March 2025, 2:30pmA9 Loth - Stop/Go Works
-
12th of March 2025, 12:30pm12th of March 2025, 4:30pmA9 Layby 97 North of Dalwhinnie NB - TTL
-
12th of March 2025, 12:30pm12th of March 2025, 4:30pmA9 Layby 97 North of Dalwhinnie SB - TTL
-
12th of March 2025, 7:30pm13th of March 2025, 6:00amA1 - SB - Dolphingstone to Bankton - Lane Closure
-
12th of March 2025, 7:30pm13th of March 2025, 6:00amA1 - SB - Bankton off-slip. Road Closure
-
12th of March 2025, 7:30pm13th of March 2025, 6:00amA1 - SB - Bankton on-slip. Road Closure
-
12th of March 2025, 7:30pm19th of March 2025, 6:30amA96 Newton Cottages, Cairnie - W/B Convoy/Road Closure/TTL's W/B
-
12th of March 2025, 7:30pm13th of March 2025, 6:30amA90 Glendoick- Lane Closure S/B
-
12th of March 2025, 7:30pm13th of March 2025, 6:30amA90 Longforgan- Lane Closure S/B
-
12th of March 2025, 7:30pm13th of March 2025, 6:30amA90 Kingsway, Dundee- Lane Closure N/B
-
12th of March 2025, 7:30pm13th of March 2025, 6:30amA90 Kinfauns- Lane Closure N/B
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amM9 EB - Jct 11 to Jct 9 Road Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA726 Murrey Rbt - Inner Ring Lane Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA726 WB approach to Murrey Rbt - Offside Lane Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA726 EB approach to Murrey Rbt - Offside Lane Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amThe Murrey Rd to Murrey Rbt - Offside Lane Closure
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amM9 EB Jct 11 to M80 SB Jct 9 - Road Closure
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amM9 EB - Jct 10 off slip - Road Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM90 Kingseat Rd to J4 N/B off slip. Lane Closure
-
12th of March 2025, 8:00pm14th of March 2025, 6:00amM74 NB Jct 4 - 2a Road Part of a Diversion Route
-
12th of March 2025, 8:00pm14th of March 2025, 6:00amM74 SB Jct 2a - 4 Road Part of a Diversion Route
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM8 EB Between Jct 26 & 25A - Lane Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM8 EB Jct 26 Onslip - Slip Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM8 EB Jct 25a Onslip - Slip Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA9 Carrbridge NB - TTL
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA9 Carrbridge SB - TTL
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA725 Northbound off-slip to A7071 - Total closure
-
12th of March 2025, 8:00pm14th of March 2025, 6:00amM74 Northbound to M73 Northbound Link Road - Total closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA78 SB Shore Rd, Skelmorlie- TTL
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA78 NB Shore Rd, Skelmorlie- TTL
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM8 - WB - jct 2 - Lane closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA702 SB - TTL's - Causewayend
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA702 NB - TTL's - Causewayend
-
12th of March 2025, 8:00pm14th of March 2025, 6:00amA1 NB - Lane Closure - Bankton to Gladsmuir
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amA9 Keir Roundabout- Signage only
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amA78 Sharphill Rbt - Chapelhill Rbt NB - Road Closure
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Dutchhouse to Bellfield - CLOSURE
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Symington Offslip - CLOSURE
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Symington Onlip - CLOSURE
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Bogend Offslip - CLOSURE
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Bogend Onslip - CLOSURE
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM80 S/B, south of J3 Hornshill (MP 7/6+30) - Lane Closure
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Spittalhill Offslip - CLOSURE
-
12th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Bellfield Offslip - CLOSURE
-
12th of March 2025, 8:00pm14th of March 2025, 6:00amA737 WB ST James to Kilbarchan - Lane Closures
-
12th of March 2025, 8:00pm14th of March 2025, 6:00amA737 EB Kilbarchan to St James- Lane Closures
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM80 S/B J5 Auchenkilns, between the slips - Road Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA751 South from Innermessan NB TOTAL CLOSURE
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amA751 South from Innermessan SB TOTAL CLOSURE
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amA720 - EB - Dreghorn EB Off slip - Closure
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amA720 - EB - Calder to Dreghorn - Closure
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amA720 - EB - Calder on slip - Closure
-
12th of March 2025, 8:00pm15th of March 2025, 6:00amA720 - EB - Barberton on slip - Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amB714 Sharphill Rbt NB - TTLS
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amB714 Sharphill Rbt SB - TTLS
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM77 NB Prior to Jct 3 - Lane Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM77 NB Between Jct 3 & Jct 2 - Road Closure
-
12th of March 2025, 8:00pm13th of March 2025, 6:00amM77 NB Jct 3 Onslip - Road Closure
-
13th of March 2025, 7:00am13th of March 2025, 7:00pmA86 Main St Kingussie WB - TTL
-
13th of March 2025, 7:00am13th of March 2025, 7:00pmA86 Main St Kingussie EB - TTL
-
13th of March 2025, 7:00am19th of March 2025, 7:00pmA835 Meallan Gharuidhe West of Aultguish Inn - Convoy Works
-
13th of March 2025, 8:00am13th of March 2025, 4:00pmM74 NB J15-J14 - Lane Closure
-
13th of March 2025, 8:00am13th of March 2025, 2:30pmA9 Skelbo North of Dornoch - Stop/Go Works
-
13th of March 2025, 8:00am13th of March 2025, 4:30pmA9 Kingussie NB - TTL
-
13th of March 2025, 8:00am13th of March 2025, 4:30pmA9 Kingussie SB - TTL
-
13th of March 2025, 8:00am13th of March 2025, 4:30pmA889 Catlodge - Stop/Go Works
-
13th of March 2025, 9:00am13th of March 2025, 11:00amA835 Inchbae WB - TTL
-
13th of March 2025, 9:00am13th of March 2025, 11:00amA835 Inchbae EB - TTL
-
13th of March 2025, 9:00am13th of March 2025, 3:30pmM9 EB - jct 11 to 10 - Mobile lane closure
-
13th of March 2025, 9:00am13th of March 2025, 3:30pmM9 WB - jct 11 to 10 - Mobile lane closure
-
13th of March 2025, 9:30am29th of March 2025, 3:30pmA78 OS 75 Main Street Largs - Scaffolding
-
13th of March 2025, 9:30am17th of March 2025, 3:30pmA75 EB at Castle Kennedy - TTLs
-
13th of March 2025, 9:30am17th of March 2025, 3:30pmA75 WB at Castle Kennedy - TTLs
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA75 Laggen WB- TTLS
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA75 Laggen EB- TTL
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA75 Newton Stewart WB- TTL
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA75 Newton Stewart EB- TTL
-
13th of March 2025, 9:30am14th of March 2025, 3:30pmA82 Drumnadrochit - Vergeworks
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA90 Auchmacoy- TTL S/B
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA90 Auchmacoy- TTL N/B
-
13th of March 2025, 9:30am14th of March 2025, 3:30pmA90 Auchmacoy- TTL S/B
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA90 Longhaven- TTL N/B
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA77 Lendalfoot SB - TTLS
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA77 Lendalfoot NB - TTLS
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA9 Kinburn Farm, Greenloaning. N/B Lane 1 closure
-
13th of March 2025, 9:30am13th of March 2025, 4:30pmA702 NB - TTL's - Linhope
-
13th of March 2025, 9:30am13th of March 2025, 4:30pmA702 SB - TTL's - Linhope
-
13th of March 2025, 9:30am14th of March 2025, 4:30pmA702 NB - TTL's - Biggar High Street
-
13th of March 2025, 9:30am14th of March 2025, 4:30pmA702 SB - TTL's - Biggar High Street
-
13th of March 2025, 9:30am14th of March 2025, 3:30pmA90 Stonehaven. N/B lane closure
-
13th of March 2025, 9:30am14th of March 2025, 3:30pmA90 Nether Craigie, Glasslaw. N/B Lane Closure
-
13th of March 2025, 9:30am14th of March 2025, 7:00amA737 SB Dalry Road Kilwinning TTLS
-
13th of March 2025, 9:30am14th of March 2025, 7:00amA737 NB Dalry Road Kilwinning TTLS
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA9 Birnam South of Dunkeld - Bankfoot SB - MLC
-
13th of March 2025, 9:30am13th of March 2025, 3:30pmA9 Birnam South of Dunkeld - Bankfoot NB - MLC
-
13th of March 2025, 11:30am13th of March 2025, 2:00pmA835 Braemore WB - TTL
-
13th of March 2025, 11:30am13th of March 2025, 2:00pmA835 Braemore EB - TTL
-
13th of March 2025, 2:30pm13th of March 2025, 4:30pmA9 Golspie - Stop/Go Works
-
13th of March 2025, 7:00pm22nd of March 2025, 5:00amA82 Culag North of Luss - Convoy Works
-
13th of March 2025, 7:30pm14th of March 2025, 6:30amA90 Kingsway, Dundee- Lane Closure N/B
-
13th of March 2025, 7:30pm29th of March 2025, 6:30amA90 Brechin Bypass. S/B Convoy/Lane closures
-
13th of March 2025, 7:30pm15th of March 2025, 6:30amA90 South of Inchture. S/B lane closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA76 SB from Drumlanrig to C133 Carronbridge - TTLS
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA76 NB from Drumlanrig to C133 Carronbridge - TTLS
-
13th of March 2025, 8:00pm15th of March 2025, 6:00amA90 S/B Keillburn Cottages, Laurencekirk - Lane Closures/Convoy
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM9 SB - Lane Closure - Linlithgow
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA8 Eastbound Junction 6 Newhouse off-slip - Nearside lane closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA725 Northbound to M8 Eastbound Link road - Total closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM9 - EB - jct 1 - Lane closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA76 New Cumnock SB - TTLS
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA76 New Cumnock NB - TTLS
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA76 Mauchline SB - TTLS
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amA76 Mauchline NB - TTLS
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM80 S/B between J5 Auchenkilns and J4a Low Wood - Lane Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM80 S/B J4a Low Wood on-slip - Road Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM73 N/B J3 Mollinsburn off-slip - Road Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM80 S/B J5 Auchenkilns on-slip - Road Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM8 WB Jct 21 On Slip Total Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM8 WB Jct 21 Lane Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM8 WB Jct 22 Off Slip Total Closure
-
13th of March 2025, 8:00pm14th of March 2025, 6:00amM77 Jct 1 Lane Closure
-
13th of March 2025, 11:59pm14th of March 2025, 6:00amM9 SB - Lane Closure - Winchburgh
-
14th of March 2025, 7:00am21st of March 2025, 5:00pmA75 Tarff Valley WB - TTLS
-
14th of March 2025, 7:00am21st of March 2025, 5:00pmA75 Tarff Valley EB - TTLS
-
14th of March 2025, 8:00am14th of March 2025, 6:00pmA87 Uig WB - TTL
-
14th of March 2025, 8:00am14th of March 2025, 6:00pmA87 Uig EB - TTL
-
14th of March 2025, 8:00am14th of March 2025, 5:00pmA90 Cross St, Fraserburgh. Diversion signage for local road works
-
14th of March 2025, 8:00am16th of March 2025, 5:00pmA90 Marshlands, Sth of Cortes. S/B TTL's
-
14th of March 2025, 8:00am14th of March 2025, 12:30pmA889 Catlodge - Stop/Go Works
-
14th of March 2025, 8:00am14th of March 2025, 6:00pmA85 Inverawe East of Taynuilt WB - TTL
-
14th of March 2025, 8:00am14th of March 2025, 6:00pmA85 Inverawe East of Taynuilt EB - TTL
-
14th of March 2025, 9:00am14th of March 2025, 12:30pmA82 Borlum South of Drumnadrochit NB - TTL
-
14th of March 2025, 9:00am14th of March 2025, 12:30pmA82 Borlum South of Drumnadrochit SB - TTL
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA701 Parkgate AE Jct SB - TTLS
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA701 Parkgate AE jct NB - TTLS
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA701 Eden SB - TTLS
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA701 Eden NB- TTL
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA90 Toll of Birness- TTL S/B
-
14th of March 2025, 9:30am14th of March 2025, 12:00pmA84 Doune NB - TTL
-
14th of March 2025, 9:30am14th of March 2025, 12:00pmA84 Doune SB - TTL
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA78 Fairlie SB - TTLS
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA9 Prior to Scottish Water, Auchterarder. N/B Lane 1 closure
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA78 Fairlie NB - TTLS
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA83 Rest and Be Thankful - Vergeworks
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmM80 S/B J3 Hornshill rbt, inner circle - Hardshoulder Closure
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA82 Ardvorlich NB - TTL
-
14th of March 2025, 9:30am14th of March 2025, 3:30pmA82 Ardvorlich SB - TTL
-
14th of March 2025, 10:00am14th of March 2025, 2:00pmA84 Kilmahog NB - TTL
-
14th of March 2025, 10:00am14th of March 2025, 2:00pmA84 Kilmahog SB - TTL
-
14th of March 2025, 12:00pm14th of March 2025, 4:00pmA84 Loch Lubnaig South of Runacraig NB - TTL
-
14th of March 2025, 12:00pm14th of March 2025, 4:00pmA84 Loch Lubnaig South of Runacraig SB - TTL
-
14th of March 2025, 12:30pm14th of March 2025, 4:30pmA86 Auchmore North of Balgowan WB - Stop/Go Works
-
14th of March 2025, 1:00pm14th of March 2025, 3:30pmA82 Dochgarroch NB - TTL
-
14th of March 2025, 1:00pm14th of March 2025, 3:30pmA82 Dochgarroch SB - TTL
-
14th of March 2025, 7:00pm24th of March 2025, 6:00amA85 Fowlis Wester EB - TTL
-
14th of March 2025, 7:00pm24th of March 2025, 6:00amA85 Fowlis Wester WB - TTL
-
14th of March 2025, 7:30pm15th of March 2025, 6:00amA1 - SB - Gladsmuir to Oaktree - Lane Closure
-
14th of March 2025, 7:30pm15th of March 2025, 6:00amA1 - SB - Oaktree off-slip. Road Closure
-
14th of March 2025, 7:30pm15th of March 2025, 6:00amA1 - SB - Oaktree on-slip. Road Closure
-
14th of March 2025, 7:30pm17th of March 2025, 6:30amA96 Newton Cottages Cairnie - Road Closure E/B
-
14th of March 2025, 7:30pm15th of March 2025, 6:30amA90 Dock Street- lane Closure S/B
-
14th of March 2025, 7:30pm15th of March 2025, 6:30amA90 Longforgan. S/B lane closure
-
14th of March 2025, 7:30pm15th of March 2025, 6:30amA90 Longforgan, Road narrowing on S/B off slip
-
14th of March 2025, 7:30pm15th of March 2025, 6:30amA90 Longforgan, Road narrowing on S/B on slip
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA737 EB Kilbarchan to St James - Lane Closures
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amWhitecart Rd SB - Total Closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amWhitecart Rd NB - Total Closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM8 EB Jct 26 Off Slip Lane Closures
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM8 EB Jct 26 On Slip Lane Closures
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM8 WB Jct 26 Off Slip Lane Closures
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM73 Northbound Junction 1 to Junction 2 - Progressive lane closures
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM73 Northbound Junction 2 off-slip - Total closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM74 Southbound Junction 5 off-slip - Offside lane closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM74 Northbound Junction 5 off-slip - Offside lane closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA82 Shantron North of Arden NB - TTL
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA7071 Bothwell to Raith Northbound - Offside lane closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA82 Shantron North of Arden SB - TTL
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA725 WB from Whitleberry Rd to Glasgow Rd - Total Closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA725 Southbound Off-slip to Raith Rbt - Offside lane closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA82 South of Firkin Point Inverbeg NB - TTL
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA725 Raith roundabout - Inner ring closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA82 South of Firkin Point Inverbeg SB - TTL
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM9 - WB - jct 1 - Lane closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA77 Doonholm SB - TTLS
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA77 Doonholm NB - TTLS
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA77 Bridgemills SB - TTLS
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA77 Bridgemills NB - TTLS
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA68 SB - TTL's - Galdean Bridge
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA68 NB - TTL's - Galdean Bridge
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amA1 NB Monktonhall. Lane Closure.
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM8 WB Jct 24 On slip -Slip Closure
-
14th of March 2025, 8:00pm15th of March 2025, 6:00amM8 WB Jct 24 to 25 Lane Closure
-
15th of March 2025, 5:00am15th of March 2025, 10:00amM74 NB J15-J14 - Single Lane Running
-
15th of March 2025, 5:00am15th of March 2025, 10:00amM74 NB J18-J17 - Single Lane Running
-
15th of March 2025, 8:00am24th of March 2025, 5:00pmA96- Kinloss- TTL E/B
-
15th of March 2025, 9:30am17th of March 2025, 3:30pmA77 NB South of Innermessan - TTLS
-
15th of March 2025, 9:30am17th of March 2025, 3:30pmA77 SB South of Innermessan - TTLS
-
15th of March 2025, 7:00pm23rd of March 2025, 6:00amM74 SB J16 ENTRY SLIP - Slip Road Closure
-
15th of March 2025, 8:00pm23rd of March 2025, 6:00amA898 NB Erskine Bridge - Lane Closure
-
15th of March 2025, 8:00pm16th of March 2025, 6:00amM74 SB Jct 3 onslip - Total Closure
-
15th of March 2025, 8:00pm16th of March 2025, 6:00amM74 SB Jct 2A onslip - Total Closure
-
15th of March 2025, 8:00pm16th of March 2025, 6:00amM74 SB Jct 2 - 2A - Lane Closure
-
15th of March 2025, 9:00pm23rd of March 2025, 6:00amM74 NB J17-J16 - Single Lane Running
-
15th of March 2025, 9:00pm23rd of March 2025, 6:00amM74 SB J16-J17 - Single Lane Running
-
15th of March 2025, 9:00pm16th of March 2025, 6:00amM74 SB Jct 2A - 3A - Total Closure
-
15th of March 2025, 9:00pm16th of March 2025, 6:00amM74 SB Jct 3A offslip - Total Closure
-
16th of March 2025, 6:00pm18th of March 2025, 6:00amA75 from A75/A701 Rbt EB Dumfries Bypass - Total closure
-
16th of March 2025, 6:00pm18th of March 2025, 6:00amA75 from A75/A701 Rbt WB Dumfries Bypass - Total closure
-
16th of March 2025, 7:00pm5th of April 2025, 6:00amA9 Drumochter Dual North End SB - Convoy Works
-
16th of March 2025, 7:00pm28th of March 2025, 7:00amA9 Thurso - Convoy Works
-
16th of March 2025, 7:00pm20th of March 2025, 7:00amA86 Roybridge WB - Road Closure with Amnesties
-
16th of March 2025, 7:00pm20th of March 2025, 7:00amA86 Roybridge EB - Road Closure with Amnesties
-
16th of March 2025, 8:00pm16th of March 2025, 8:01pmM8 J18 EB off slip to A82 Great Western Road - No obstruction to CW or FW
-
16th of March 2025, 8:00pm16th of March 2025, 8:01pmM8 J18 EB off slip to A804 St Georges Road - No obstruction to CW and FW
-
16th of March 2025, 8:00pm17th of March 2025, 6:00amA85 Dunollie Rd Oban EB - TTL
-
16th of March 2025, 8:00pm17th of March 2025, 6:00amA85 Dunollie Rd Oban WB - TTL
-
16th of March 2025, 8:00pm17th of March 2025, 6:00amA9 South of Broxden. S/B lane closure
-
16th of March 2025, 8:00pm17th of March 2025, 6:00amA9 South of Broxden. N/B lane closure
-
16th of March 2025, 8:00pm17th of March 2025, 6:00amA9 South of Broxden. N/B lane closure
-
16th of March 2025, 9:00pm17th of March 2025, 5:00amA738 SB Stevenston Road @ West Doura Way - TTLS
-
16th of March 2025, 9:00pm17th of March 2025, 5:00amA738 Stevenston Road @ West Doura Way - TTLS
-
17th of March 2025, 12:00am30th of May 2025, 5:00pmA90 South of Peterhead SB - Diversion signage for local road closure
-
17th of March 2025, 7:00am17th of March 2025, 7:00pmA835 Inverlael - Vergeworks
-
17th of March 2025, 7:00am17th of March 2025, 7:00pmA82 Drumnadrochit SB - TTL
-
17th of March 2025, 7:00am17th of March 2025, 7:00pmA82 Drumnadrochit NB - TTL
-
17th of March 2025, 7:00am28th of March 2025, 7:00pmA82 Lochend NB - TTL
-
17th of March 2025, 7:00am28th of March 2025, 7:00pmA82 Lochend SB - TTL
-
17th of March 2025, 7:30am21st of March 2025, 5:00pmNB Carnoustie St - Road Narrowing
-
17th of March 2025, 8:00am17th of March 2025, 4:00pmA77 SB Smyrton to Kilantringan - Stop and Go
-
17th of March 2025, 8:00am21st of March 2025, 6:00pmA90 Inchture to Barnhill SB - Diversion signage for local road closure
-
17th of March 2025, 8:00am28th of March 2025, 6:00pmA738 SB Stevenston Rd at West @ Mcluckie Drive - TTLS
-
17th of March 2025, 8:00am28th of March 2025, 6:00pmA738 NB Stevenston Rd at Mcluckie Drive - TTLS
-
17th of March 2025, 8:00am17th of March 2025, 6:00pmA87 Earlsih East of Uig WB - TTL
-
17th of March 2025, 8:00am17th of March 2025, 6:00pmA87 Earlsih East of Uig EB - TTL
-
17th of March 2025, 8:00am20th of April 2025, 6:00pmA87 Portree EB - TTL
-
17th of March 2025, 8:00am20th of April 2025, 6:00pmA87 Portree WB - TTL
-
17th of March 2025, 8:00am19th of March 2025, 6:00pmA90 Laurencekirk. Diversion signage for local road closure
-
17th of March 2025, 8:00am28th of March 2025, 5:00pmA95 Keith- Stop/Go S/B
-
17th of March 2025, 9:00am21st of March 2025, 5:00pmA78 SB Irvine Rd, Seamill - TTL's
-
17th of March 2025, 9:00am21st of March 2025, 5:00pmA78 NB Irvine Rd, Seamill - TTL's
-
17th of March 2025, 9:00am17th of March 2025, 7:00pmA85 Ardnaskie Wood East of Connel - Stop/Go Works
-
17th of March 2025, 9:00am21st of March 2025, 4:00pmA77 SB Ardwell - TTL's
-
17th of March 2025, 9:00am21st of March 2025, 4:00pmA77 NB Ardwell - TTL's
-
17th of March 2025, 9:30am20th of March 2025, 3:30pmA737 WB Roadhead Rbt- Lane Closure
-
17th of March 2025, 9:30am20th of March 2025, 3:30pmA737 EB Roadhead Rbt - Lane Closure
-
17th of March 2025, 9:30am20th of March 2025, 3:30pmA737 EB Roadhead Rbt - TTL
-
17th of March 2025, 9:30am20th of March 2025, 3:30pmA737 WB Roadhead Rbt - TTL
-
17th of March 2025, 9:30am17th of March 2025, 4:00pmA84 Pass House Kilmahog NB - TTL
-
17th of March 2025, 9:30am17th of March 2025, 4:00pmA84 Pass House Kilmahog SB - TTL
-
17th of March 2025, 9:30am21st of March 2025, 12:30pmA9 Luncarty to Inveralmond NB - Lane Closure
-
17th of March 2025, 9:30am21st of March 2025, 3:30pmA90 Finavon- Lane Closure N/B
-
17th of March 2025, 9:30am19th of March 2025, 3:30pmA96 Fochabers Bypass- TTL W/B
-
17th of March 2025, 9:30am19th of March 2025, 3:30pmA76 SB after Allanton - TTLs
-
17th of March 2025, 9:30am19th of March 2025, 3:30pmA76 NB before Allanton - TTLs
-
17th of March 2025, 9:30am18th of March 2025, 3:30pmA702 - NB - West Linton - STOP/GO
-
17th of March 2025, 9:30am18th of March 2025, 3:30pmA702 - SB - West Linton - STOP/GO
-
17th of March 2025, 9:30am19th of March 2025, 3:30pmA96 Lhanbryde- TTL W/B
-
17th of March 2025, 9:30am18th of March 2025, 3:30pmA90 Stirling village- TTL N/B
-
17th of March 2025, 9:30am26th of March 2025, 7:00pmA9 Tomich North of Dalmore NB - TTL
-
17th of March 2025, 9:30am26th of March 2025, 7:00pmA9 Tomich North of Dalmore SB - TTL
-
17th of March 2025, 9:30am21st of March 2025, 3:30pmA77 NB Girvan to Whitletts - Stop and go
-
17th of March 2025, 9:30am21st of March 2025, 3:30pmA77 SB Girvan to Whitletts - Stop and go
-
17th of March 2025, 9:30am21st of March 2025, 4:00pmA78 SB at Skelmorlie - TTLS
-
17th of March 2025, 9:30am21st of March 2025, 4:00pmA78 NB at Skelmorlie - TTLS
-
17th of March 2025, 9:30am21st of March 2025, 12:30pmA9 Dalshian Pitlochry NB - Lane Closure
-
17th of March 2025, 6:00pm20th of March 2025, 6:00amA92 Glenrothes- TTL N/B
-
17th of March 2025, 7:00pm21st of March 2025, 7:00amA9 Kessock Bridge NB - Lane Closure
-
17th of March 2025, 7:00pm21st of March 2025, 7:00amA9 Kessock Bridge SB - Lane Closure
-
17th of March 2025, 7:00pm18th of March 2025, 7:00amA83 Muasdale North of Glenbarr - Convoy Works
-
17th of March 2025, 7:30pm29th of March 2025, 6:00amA82 Stoneymollan to Arden NB - TTL
-
17th of March 2025, 7:30pm29th of March 2025, 6:00amA82 Stoneymollan to Arden SB - TTL
-
17th of March 2025, 7:30pm22nd of March 2025, 6:30amM90 J9 Muirmont OB, Bridge of Earn. Lane 2 closures
-
17th of March 2025, 7:30pm22nd of March 2025, 6:30amM90 J9 Muirmont OB, Bridge of Earn. Lane 2 closures
-
17th of March 2025, 7:30pm18th of March 2025, 6:00amA1 - SB - Oaktree - Abbotsview - Lane Closure
-
17th of March 2025, 7:30pm18th of March 2025, 6:00amA1 - SB - Abbotsview off-slip. Road Closure
-
17th of March 2025, 7:30pm18th of March 2025, 6:00amA1 - SB - Abbotsview on-slip. Road Closure
-
17th of March 2025, 7:30pm22nd of March 2025, 6:30amA92 Ore Bridge- Lane Closure N/B
-
17th of March 2025, 7:30pm22nd of March 2025, 6:30amA92 Ore Bridge- Lane Closure S/B
-
17th of March 2025, 7:30pm19th of March 2025, 6:00amA7 - Kingsknowe RBT - closure
-
17th of March 2025, 8:00pm4th of April 2025, 6:00amA82 North Rd Fort William NB - TTL
-
17th of March 2025, 8:00pm4th of April 2025, 6:00amA82 North Rd Fort William SB - TTL
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amAbbotsinch Rd NB - Total Closure
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amAbbotsinch Rd SB - Total Closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA804 NB North St - Broomielaw to Argyle St - Total Closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA804 SB Newton St - Argyle St to Broomielaw- Total Closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA814 EB Anderston Quay - TTL's
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA814 WB Anderston Quay - TTL's
-
17th of March 2025, 8:00pm18th of March 2025, 6:30amA92 Redhouse to Chapel, Kirkcaldy - Convoy
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA77 SB Ayr Bypass to Bankfield Rdt -Lane Closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA77 NB Ayr Bypass to Bankfield Rdt -Lane Closure
-
17th of March 2025, 8:00pm22nd of March 2025, 6:00amA78 Irvine Rd Seamill SB - Total Closure
-
17th of March 2025, 8:00pm22nd of March 2025, 6:00amA78 Irvine Rd Seamill NB - Total Closure
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amM8 WB Jct 22 to 23 Lane Closure
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amM8 WB 23 Off Slip Total Closure
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amM8 Westbound Junction 8 on-slip - Total closure
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amA8 Eastbound Chapelhall North Rbt - Offside lane closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amM73 Southbound Junction 2 off-slip - Progressive Nearside / Offside lane closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amM73 Northbound Junction 2 off-slip - Progressive Nearside/ Offside lane closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amM8 Westbound Junction 8 off-slip - Progressive Nearside / Offside lane closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA8 Eastbound Swinton Rbt to Baillieston Rbt - Progressive Nearside / Offside lane closure
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amA8(M) Baillieston Roundabout - Progressive Outer / Inner ring closure
-
17th of March 2025, 8:00pm18th of March 2025, 6:00amM8 EB - Lane Closure - Near to Dechmont
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amM8 WB Jct 11 to 13 - Lane Closures
-
17th of March 2025, 8:00pm19th of March 2025, 6:00amM8 EB Jct 13 to 11 - Lane Closures
-
17th of March 2025, 8:00pm21st of March 2025, 6:00amA78 SB Main Rd, Fairlie - TTL's
-
17th of March 2025, 8:00pm21st of March 2025, 6:00amA78 NB Main Rd, Fairlie - TTL's
-
18th of March 2025, 12:01am27th of March 2025, 11:59pmA83 Glenbarr North of Campbeltown - Vergeworks SS
-
18th of March 2025, 8:00am25th of March 2025, 6:00pmA90 Hatton - Diversion signage- N/B
-
18th of March 2025, 8:00am18th of March 2025, 5:00pmA90 North Quilkoe, Forfar - Diversion Signage
-
18th of March 2025, 8:00am18th of March 2025, 6:00pmA84 Balquidder South of Lochearnhead NB - TTL
-
18th of March 2025, 8:00am18th of March 2025, 6:00pmA84 Balquidder South of Lochearnhead SB - TTL
-
18th of March 2025, 9:00am21st of March 2025, 3:30pmA75 EB Between Crocketford & Cuckoo Bridge - Route Part of Diversion
-
18th of March 2025, 9:00am21st of March 2025, 3:30pmA75 WB Between Crocketford & Cuckoo Bridge - Route Part of Diversion
-
18th of March 2025, 9:00am21st of March 2025, 3:30pmA76 NB Cuckoo Bridge & Holywood - Route Part of Diversion
-
18th of March 2025, 9:00am21st of March 2025, 3:30pmA76 SB Cuckoo Bridge & Holywood - Route Part of Diversion
-
18th of March 2025, 7:30pm21st of March 2025, 6:30amA92 East Dock Street Lane Closure N/B
-
18th of March 2025, 7:30pm21st of March 2025, 6:30amA92 East Dock Street Lane Closure S/B
-
18th of March 2025, 8:00pm19th of March 2025, 6:00amA75 Allanton Roundabout to A713 Jct WB FULL CLOSURE
-
18th of March 2025, 8:00pm19th of March 2025, 6:00amA75 Allanton Roundabout to A713 Jct EB FULL CLOSURE
-
18th of March 2025, 8:00pm27th of March 2025, 6:00amA737 EB To M8 EB Total Closure
-
18th of March 2025, 8:00pm27th of March 2025, 6:00amM8 EB Jct 28 On slip Total Closure
-
18th of March 2025, 8:00pm27th of March 2025, 6:00amM8 EB Jct 29 to 27 Lane Closures
-
18th of March 2025, 8:00pm19th of March 2025, 6:30amA90 N/B Keillburn Cottages, Laurencekirk - Lane Closures
-
18th of March 2025, 8:00pm20th of March 2025, 6:00amM8 Jct 19 to Jct 22 WB - Offside and Adjacent Lane Closure
-
18th of March 2025, 8:00pm20th of March 2025, 6:00amM8 Jct 22 to Jct 23 WB - Total Closure
-
18th of March 2025, 8:00pm19th of March 2025, 6:00amM8 Westbound Junction 6 Newhouse - Nearside lane closure
-
18th of March 2025, 8:00pm20th of March 2025, 6:00amM8 Jct 22 to Jct 23 WB - Offside and Adjacent lane closure
-
18th of March 2025, 8:00pm20th of March 2025, 6:00amM8 Jct 25 to Jct 23 EB - Offside and Adjacent lane closure
-
18th of March 2025, 9:00pm21st of March 2025, 6:00amA9 Pitlochry NB - TTL
-
18th of March 2025, 9:00pm21st of March 2025, 6:00amA9 Pitlochry SB - TTL
-
19th of March 2025, 12:00am21st of March 2025, 6:00pmM8 WB Jct 25a to 26 - HS Closure
-
19th of March 2025, 9:30am19th of March 2025, 4:30pmA702 NB - 4 way TTL's - Station Rd, Biggar
-
19th of March 2025, 9:30am19th of March 2025, 4:30pmA702 SB - 4 way TTL's - Station Rd, Biggar
-
19th of March 2025, 9:30am19th of March 2025, 3:30pmA702 - NB - Flotterstone - STOP/GO
-
19th of March 2025, 9:30am19th of March 2025, 3:30pmA702 - SB - Flotterstone - STOP/GO
-
19th of March 2025, 9:30am19th of March 2025, 3:30pmA8 Westbound Showcase off-slip - Total closure
-
19th of March 2025, 9:30am20th of March 2025, 3:30pmM80 S/B, from J4a Low Wood on-slip to 205m south of North Road Bridge - Hardshoulder Closure
-
19th of March 2025, 9:30am19th of March 2025, 3:30pmA85 Fowlis Wester - Diversion Signage
-
19th of March 2025, 9:30am19th of March 2025, 3:30pmA85 Taynulit EB - TTL
-
19th of March 2025, 9:30am19th of March 2025, 3:30pmA85 Taynulit WB - TTL
-
19th of March 2025, 7:30pm25th of March 2025, 6:00amA1 - SB - Coldingham - Closure
-
19th of March 2025, 7:30pm20th of March 2025, 6:00amA1 - NB - Coldingham - Lane Closure
-
19th of March 2025, 7:30pm20th of March 2025, 6:00amA1 - SB - Coldingham - Lane Closure
-
19th of March 2025, 8:00pm21st of March 2025, 6:00amA814 WB Argyle St - Total closure
-
19th of March 2025, 8:00pm21st of March 2025, 6:00amA804 Newton St - Argyle St to Broomielaw - Total closure
-
19th of March 2025, 8:00pm21st of March 2025, 6:30amA90 Fordoun N/B - Lane Closures
-
19th of March 2025, 8:00pm21st of March 2025, 6:00amM8 EB Jct 14 to 13 - Lane Closures
-
19th of March 2025, 8:00pm21st of March 2025, 6:00amM8 WB Jct 13 to 14 - Lane Closures
-
19th of March 2025, 8:00pm20th of March 2025, 6:00amA725 Northbound Main line Raith to Bellziehill - Total closure
-
19th of March 2025, 8:00pm20th of March 2025, 6:00amA725 Northbound Raith on-slip - Total closure
-
19th of March 2025, 8:00pm21st of March 2025, 6:00amM8 Westbound Junction 7A Shawhead to A725 Southbound Link Road - Total closure
-
19th of March 2025, 8:00pm20th of March 2025, 12:01amM9 SB - Lane Closure - Near to Polmont
-
19th of March 2025, 8:00pm22nd of March 2025, 6:00amM80 NB Jct 7-8 North of Haggs. Road Closure
-
19th of March 2025, 8:00pm22nd of March 2025, 6:00amM80 NB Jct 7 on-slip. Road Closure
-
19th of March 2025, 8:00pm31st of March 2025, 6:00amA82 South Corran Ferry SB - Road Closure with Amnesties
-
20th of March 2025, 6:00am26th of March 2025, 6:00pmA85 Strathearn Terrace to Coldswell Rd Crieff - Diversion Signage
-
20th of March 2025, 7:00am27th of March 2025, 7:00pmA835 Loch Droma East of Braemore - Convoy Works
-
20th of March 2025, 8:00am3rd of April 2025, 6:00pmA738 SB Stevenston Rd at @ Segton Avenue- TTLS
-
20th of March 2025, 8:00am3rd of April 2025, 6:00pmA738 NB Stevenston Rd at Segton Avenue - TTLS
-
20th of March 2025, 9:30am20th of March 2025, 3:30pmA985 - WB - Kincardine - Lane Closure
-
20th of March 2025, 9:30am23rd of March 2025, 5:00pmA78 NB Shore Rd Wemyss Bay - TTLs
-
20th of March 2025, 9:30am20th of March 2025, 3:30pmA985 - EB - Kincardine - EB
-
20th of March 2025, 9:30am23rd of March 2025, 5:00pmA78 SB Shore Rd Wemyss Bay - TTLs
-
20th of March 2025, 9:30am21st of March 2025, 3:30pmM80 S/B, between Westfield footbridge and M73 diverge - Hardshoulder Closure
-
20th of March 2025, 7:00pm22nd of March 2025, 7:00amA82 After Stoneymollan Rnbt - Convoy Works
-
20th of March 2025, 7:00pm21st of March 2025, 6:00amA86 Pattack Falls West of Strathmashie WB - Road Closure with Amnesties
-
20th of March 2025, 7:00pm21st of March 2025, 6:00amA86 Pattack Falls West of Strathmashie EB - Road Closure with Amnesties
-
20th of March 2025, 7:00pm2nd of April 2025, 7:00amA9 Dalmore Alness - Convoy Works
-
20th of March 2025, 7:30pm25th of March 2025, 6:00amA1 - NB - Coldingham - Closure
-
20th of March 2025, 8:00pm21st of November 2025, 6:00amA82 NB Barloan Rbt to Stoneymollan Rbt -Road Closure
-
20th of March 2025, 8:00pm21st of November 2025, 6:00amA82 SB Barloan Rbt to Stoneymollan Rbt - Road Closure
-
20th of March 2025, 8:00pm21st of March 2025, 6:00amM74 Southbound Bothwell Services on-slip- Total closure
-
20th of March 2025, 8:00pm31st of March 2025, 6:00amA82 South Corran Ferry NB - Road Closure with Amnesties
-
21st of March 2025, 8:00am27th of March 2025, 5:00pmA96 South of Keith. Diversion signage for local road closure
-
21st of March 2025, 9:00am22nd of March 2025, 6:00amA90 Inchmichael to Errol SB - Diversion signage for local road closure
-
21st of March 2025, 9:30am22nd of March 2025, 7:00amA78 NB Shore Road Skelmorlie - TTLS
-
21st of March 2025, 9:30am22nd of March 2025, 7:00amA78 SB Shore Road Skelmorlie - TTLS
-
21st of March 2025, 9:30am24th of March 2025, 3:30pmM80 S/B between M73 diverge and Mollins Road bridge - Hardshoulder Closure
-
21st of March 2025, 9:30am21st of March 2025, 3:30pmA9 Brora - Diversion Signage
-
21st of March 2025, 9:30am21st of March 2025, 3:30pmA9 Bankfoot to Ballinluig NB - Diversion Signage
-
21st of March 2025, 9:30am21st of March 2025, 3:30pmA9 Bankfoot to Ballinluig SB - Diversion Signage
-
21st of March 2025, 7:00pm22nd of March 2025, 6:00amA68 SB Lauder. Road Closure
-
21st of March 2025, 7:00pm22nd of March 2025, 6:00amA68 NB Lauder. Road Closure
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amA814 EB Clydeside Expressway - Total closure
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amM8 WB Jct 18 off slip to Argyle St - Total closure
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amM8 WB Jct 14 to 15 - Lane Closures
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amM8 EB Jct 15 to 14 - Lane Closures
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amA725 Diamond Southbound off-slip - Total closure
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amA8 Eastbound Swinton rbt - inner ring closure
-
21st of March 2025, 8:00pm22nd of March 2025, 6:00amA8 Eastbound Baillieston Lights to Swinton Rbt - Offside lane closure
-
22nd of March 2025, 7:00am22nd of March 2025, 7:00pmA76 Drumlanrig to Glenairlie - NB Total closure
-
22nd of March 2025, 7:00am22nd of March 2025, 7:00pmA76 Drumlanrig to Glenairlie - SB Total closure
-
22nd of March 2025, 8:00am23rd of March 2025, 8:00pmA76 NB Crossroads to near Bellfield Interchange - Route Part of Diversion
-
22nd of March 2025, 8:00am23rd of March 2025, 8:00pmA76 SB Crossroads to near Bellfield Interchange - Route Part of Diversion
-
23rd of March 2025, 8:00am23rd of March 2025, 4:30pmA737 SB Dalry Road, Dalgarven -Advanced Signage
-
23rd of March 2025, 8:00am23rd of March 2025, 4:30pmA737 NB Dalry Road, Dalgarven -Advanced Signage
-
23rd of March 2025, 6:00pm25th of March 2025, 6:00amA75 from A75/A701 Rbt EB Dumfries Bypass - Total closure
-
23rd of March 2025, 6:00pm25th of March 2025, 6:00amA75 from A75/A701 Rbt WB Dumfries Bypass - Total closure
-
23rd of March 2025, 7:00pm1st of April 2025, 7:00amA9 Navidale Helmsdale NB - Road Closure with Amnesites
-
23rd of March 2025, 7:00pm1st of April 2025, 7:00amA9 Navidale Helmsdale SB - Road Closure with Amnesites
-
23rd of March 2025, 7:00pm31st of March 2025, 5:00amA82 Tarbet - Convoy Works
-
23rd of March 2025, 7:00pm31st of March 2025, 5:00amA82 Tarbet - Convoy Works
-
23rd of March 2025, 7:00pm31st of March 2025, 5:00amA83 Tarbet - Convoy Works
-
23rd of March 2025, 7:30pm30th of May 2025, 6:00pmA90 North Water Bridge, Sth of Laurencekirk. S/B Lane closures
-
23rd of March 2025, 7:30pm29th of March 2025, 6:00amM80 - NB - Junction 8 to 9 - Lane Closure
-
23rd of March 2025, 8:00pm20th of April 2025, 6:00amA82 Great Western Road NB - Lane Closure
-
23rd of March 2025, 8:00pm20th of April 2025, 6:00amM8 J18 EB off slip to A82 Great Western Road - Total Closure
-
23rd of March 2025, 8:00pm31st of March 2025, 6:00amA725 S/B Belshill bypass to B7012 -Lane Closure
-
23rd of March 2025, 8:00pm31st of March 2025, 6:00amA725 N/B B7012 to Belshill bypass -Lane Closure
-
24th of March 2025, 7:00am28th of March 2025, 7:00pmA85 Orchy Bridge West of Dalmally WB - TTL
-
24th of March 2025, 7:00am28th of March 2025, 7:00pmA85 Orchy Bridge West of Dalmally EB - TTL
-
24th of March 2025, 7:00am4th of April 2025, 7:00pmA9 Daviot NB - Lane Closure
-
24th of March 2025, 7:00am4th of April 2025, 7:00pmA9 Daviot SB - Lane Closure
-
24th of March 2025, 7:00am27th of March 2025, 7:00pmA83 Tarbert - Convoy Works
-
24th of March 2025, 7:00am6th of April 2025, 7:00pmA83 Fyne Clachan SB - TTL
-
24th of March 2025, 7:00am6th of April 2025, 7:00pmA83 Fyne Clachan NB - TTL
-
24th of March 2025, 8:00am25th of March 2025, 4:30pmA828 Portnacroish North of Appin - Convoy Works
-
24th of March 2025, 8:00am26th of March 2025, 6:00pmA737 Dalry Road SB - Advance Signage
-
24th of March 2025, 8:00am26th of March 2025, 6:00pmA738 Byres Road WB - Advance Signage
-
24th of March 2025, 8:00am28th of March 2025, 5:00pmA96 Keith . Diversion signage for local road closure
-
24th of March 2025, 8:00am28th of March 2025, 6:00pmA76 NB New Cumnock to Mansfield - Route Part of Diversion
-
24th of March 2025, 8:00am28th of March 2025, 5:00pmA96 Keith. Diversion signage for local road closure
-
24th of March 2025, 8:00am28th of March 2025, 6:00pmA76 SB New Cumnock to Mansfield - Route Part of Diversion
-
24th of March 2025, 8:00am25th of March 2025, 6:00pmA737 SB Dalry Road Kilwinning - 2 Way TTLS
-
24th of March 2025, 8:00am25th of March 2025, 6:00pmA737 NB Dalry Road Kilwinning - 2 Way TTLS
-
24th of March 2025, 8:00am26th of March 2025, 4:00pmM9 EB Jct 11 to 10 Hard shoulder closure
-
24th of March 2025, 8:00am26th of March 2025, 5:00pmA7 NB - TTL's - Wilton Hill, Hawick
-
24th of March 2025, 8:00am26th of March 2025, 5:00pmA7 SB - TTL's - Wilton Hill, Hawick
-
24th of March 2025, 8:30am24th of March 2025, 5:00pmA82 Drumnadrochit NB - TTL
-
24th of March 2025, 8:30am24th of March 2025, 5:00pmA82 Drumnadrochit SB - TTL
-
24th of March 2025, 9:30am24th of March 2025, 3:30pmA82 Invermoriston SB - TTL
-
24th of March 2025, 9:30am24th of March 2025, 3:30pmA82 Invermoriston NB - TTL
-
24th of March 2025, 9:30am11th of April 2025, 3:30pmM74 SB Jnt 7 Off Slip - TTL's
-
24th of March 2025, 9:30am24th of March 2025, 5:00pmA68 SB Pathhead. Portable Traffic Lights
-
24th of March 2025, 9:30am24th of March 2025, 5:00pmA68 NB Pathhead. Portable Traffic Lights
-
24th of March 2025, 9:30am28th of March 2025, 3:30pmA90 Finavon- Lane Closure S/B
-
24th of March 2025, 9:30am24th of March 2025, 3:30pmA82 Glencoe NB - TTL
-
24th of March 2025, 9:30am24th of March 2025, 3:30pmA82 Glencoe SB - TTL
-
24th of March 2025, 9:30am28th of March 2025, 3:30pmA68 SB - TTL's - South of Pathhead
-
24th of March 2025, 9:30am28th of March 2025, 3:30pmA68 NB - TTL's - South of Pathhead
-
24th of March 2025, 9:30am26th of March 2025, 3:30pmA90 Westown, Kilspindie. Lane Closure N/B
-
24th of March 2025, 9:30am24th of March 2025, 3:30pmA96 Colpy. E/B TTL's
-
24th of March 2025, 9:30am26th of March 2025, 3:30pmA87 Kyle of Lochalsh EB - TTL
-
24th of March 2025, 9:30am26th of March 2025, 3:30pmA87 Kyle of Lochalsh WB - TTL
-
24th of March 2025, 9:30am25th of March 2025, 3:30pmM80 S/B between J4 Westfield on-slip and 1km south of J4 on-slip - Hardshoulder Closure
-
24th of March 2025, 7:00pm7th of April 2025, 7:00amA9 River Braan North of Dunkeld NB - TTL
-
24th of March 2025, 7:00pm7th of April 2025, 7:00amA9 River Braan North of Dunkeld SB - TTL
-
24th of March 2025, 7:00pm26th of March 2025, 7:00amA9 River Braan North of Dunkeld - Convoy Works
-
24th of March 2025, 7:30pm28th of March 2025, 6:30amA90 Forfar Road, Dundee- Lane Closure N/B
-
24th of March 2025, 7:30pm28th of March 2025, 6:30amA90 Forfar Road, Dundee- Lane Closure S/B
-
24th of March 2025, 7:30pm29th of March 2025, 6:00amA876 - EB - Higgin's Neuk Rbt - Lane Closure
-
24th of March 2025, 7:30pm29th of March 2025, 6:00amA876 - WB - Higgin's Neuk Rbt - Lane Closure
-
24th of March 2025, 7:30pm26th of March 2025, 6:30amA9 Aberuthven- Convoy S/B
-
24th of March 2025, 7:30pm29th of March 2025, 6:30amA90 Glencarse- Lane Closures N/B
-
24th of March 2025, 7:30pm29th of March 2025, 6:30amA90 Glencarse- Lane Closures S/B
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amA77 SB Kilmarnock Bypass East Ayrshire - Lane Closure
-
24th of March 2025, 8:00pm4th of April 2025, 4:00amM8- Westbound- Jct 3 off slip- slip closure
-
24th of March 2025, 8:00pm30th of March 2025, 6:00amA726 GSO - Maidenhill to Belle Craig roundabout
-
24th of March 2025, 8:00pm26th of March 2025, 6:00amNB White Cart Rd Total Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amSB White Cart Rd Total Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amSB Abbotsinchh Rd Total Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amNB Abbotsinchh Rd Total Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amNew Shot Drive Inchinnan NB - TTL
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amNew Shot Drive Inchinnan SB - TTL
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amPark Drive Inchinnan NB - TTLS
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amPark Drive Inchinnan SB - TTLS
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amGallow Green Rd Paisley NB - Lane Closures
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amGallow Green Rd Paisley SB - Lane Closures
-
24th of March 2025, 8:00pm27th of March 2025, 6:00amA804 NB North St - Total closure
-
24th of March 2025, 8:00pm27th of March 2025, 6:00amM8 EB Jct 19 Anderston on slip - Total closure
-
24th of March 2025, 8:00pm29th of March 2025, 6:00amA78 Irvine Rd Seamill SB - TTLS
-
24th of March 2025, 8:00pm29th of March 2025, 6:00amA78 Irvine Rd Seamill NB - TTLS
-
24th of March 2025, 8:00pm26th of March 2025, 6:00amM8 EB Jct 26 offslip Hillington - Lane Closure
-
24th of March 2025, 8:00pm26th of March 2025, 6:00amM8 WB Jct 26 Onslip Hillington - Lane Closure
-
24th of March 2025, 8:00pm26th of March 2025, 6:00amM8 WB Jct 26 Offslip Hillington - Lane Closure
-
24th of March 2025, 8:00pm1st of April 2025, 6:00amA75 WB Drummore to Merkland - Total closure
-
24th of March 2025, 8:00pm1st of April 2025, 6:00amA75 EB Drummore to Merkland -Total closure
-
24th of March 2025, 8:00pm1st of April 2025, 6:00amC44s Lochfoot Road (D&G Council network) -Cosure
-
24th of March 2025, 8:00pm1st of April 2025, 6:00amC56N (D&G Council network) - Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amM90 - NB - QC - Lane 2 Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amA8 Eastbound Carnbroe on-slip - Total Closure
-
24th of March 2025, 8:00pm25th of March 2025, 6:00amM8 Westbound between Junction 7 to Junction 8 - Nearside & Adjacent lane closure
-
24th of March 2025, 8:30pm29th of March 2025, 6:00amM8 - EB - Jct 4 on slip - Closure
-
24th of March 2025, 8:30pm29th of March 2025, 6:00amM8 Jct 4 - Jct 5 - WB. Road Closure
-
24th of March 2025, 8:30pm29th of March 2025, 6:00amM8 Jct 4 - Jct 5 - EB. Road Closure
-
24th of March 2025, 8:30pm31st of March 2025, 6:00amM8 Jct 3A - J4 - WB road closure
-
24th of March 2025, 8:30pm31st of March 2025, 6:00amM8 Jct 4 to 3A - EB road closure
-
24th of March 2025, 9:00pm28th of March 2025, 5:00amA75 WB at Kirkdale House - TTLS
-
24th of March 2025, 9:00pm28th of March 2025, 5:00amA75 WB at Kirkdale House - TTLS
-
24th of March 2025, 10:00pm29th of March 2025, 6:00amA86 Kinloch Laggan to Strathmashie EB - Road Closure with Amnesties
-
24th of March 2025, 10:00pm29th of March 2025, 6:00amA86 Kinloch Laggan to Strathmashie WB - Road Closure with Amnesties
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amM90 - SB - Queensferry Jct 1b Ferrytoll to M9 1A - Closure
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amM90 - NB -M9 Jct 1a to M90 1A Queensferry - Closure
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amA90 - NB - M90 to Queensferry Jct 1a - Closure
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amM9 - EB - Jct 1B onslip Winchburgh - Closure
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amM90 - SB - Queensferry Jct 1a Queensferry on-slip. Closure
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amM90 - SB - Jct 1B Ferrytoll On slip - Closure
-
24th of March 2025, 10:00pm25th of March 2025, 6:00amM90 - NB - Jct 1B Ferrytoll - Closure
-
25th of March 2025, 6:00am28th of March 2025, 8:00pmA75 WB Drummore to Merkland - TTL's
-
25th of March 2025, 6:00am28th of March 2025, 8:00pmA75 EB Drummore to Merkland - TTL's
-
25th of March 2025, 8:00am25th of March 2025, 5:00pmA75 EB Old Military Road at Newton Stewart - TTLS
-
25th of March 2025, 8:00am25th of March 2025, 5:00pmA75 WB Old Military Road at Newton Steward - TTLS
-
25th of March 2025, 8:30am25th of March 2025, 3:30pmA9 Dunblane to Greenloaning - Diversion Signage
-
25th of March 2025, 9:30am25th of March 2025, 3:30pmA76 SB Barburgh Mill to Blackwood- TTL
-
25th of March 2025, 9:30am25th of March 2025, 3:30pmA76 NB Blackwood to Barburgh Mill - TTL
-
25th of March 2025, 9:30am28th of March 2025, 3:30pmA835 Contin WB - TTL
-
25th of March 2025, 9:30am28th of March 2025, 3:30pmA835 Contin EB - TTL
-
25th of March 2025, 9:30am2nd of April 2025, 3:30pmA85 Forebrae West of Braegrum EB - TTL
-
25th of March 2025, 9:30am2nd of April 2025, 3:30pmA85 Forebrae West of Braegrum WB - TTL
-
25th of March 2025, 8:00pm27th of March 2025, 5:00amA90 Swallow Roundabout to Longforgan SB - Diversion signage for local road closure
-
25th of March 2025, 8:00pm28th of March 2025, 6:00amM876 EB Jct 1 on-slip. Road Closure
-
25th of March 2025, 8:00pm28th of March 2025, 6:00amM876 EB - M80 join to jct 2 - Road Closure
-
25th of March 2025, 8:00pm28th of March 2025, 6:00amA833 - Temp lights
-
25th of March 2025, 8:00pm28th of March 2025, 6:00amM876 EB Jct 2 off-slip. Road Closure
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amKings Inch Drive WB TTLS
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amEB Kings Inch Drive TTL
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amMain St Lochwinnoch NB Total Closure
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amMain St Lochwinnoch SB Total Closure
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amWB Old Candren Rd Total Closures
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amEB Old Candren Rd Total Closures
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amM73 Northbound Junction 2a to Junction 3 - Nearside lane closure
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amA725 Northbound to M8 Eastbound link road - total closure
-
25th of March 2025, 8:00pm26th of March 2025, 6:00amA8 Westbound Showcase to Bargeddie rbt - Nearside lane closure
-
26th of March 2025, 6:00am1st of April 2025, 6:00pmA85 Strathearn Terrace to Coldwells Road Crieff - Diversion Signage
-
26th of March 2025, 8:00am27th of March 2025, 6:00pmA85 Forbrae to Methven - Diversion Signage
-
26th of March 2025, 8:00am8th of April 2025, 5:00pmA78 SB Shore Road Skelmorlie - TTLS
-
26th of March 2025, 8:00am8th of April 2025, 5:00pmA78 NB Shore Road Skelmorlie - TTLS
-
26th of March 2025, 9:30am26th of March 2025, 3:30pmA78 SB Between St Philans and Routenburn - Route Part of Diversion
-
26th of March 2025, 9:30am26th of March 2025, 3:30pmA78 NB Between St Philans and Routenburn - Route Part of Diversion
-
26th of March 2025, 9:30am27th of March 2025, 3:30pmM80 S/B, approx. 302m s. of Lindsaybeg Road bridge - Hardshoulder Closure
-
26th of March 2025, 7:30pm29th of March 2025, 6:00amM80 - SB - Junction 9 to 8 - Lane Closure
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amCalder St Lochwinnoch EB Total
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amCalder St Lochwinnoch WB Total
-
26th of March 2025, 8:00pm28th of March 2025, 6:00amA804 SB Newton St link to Argyle St - Total closure
-
26th of March 2025, 8:00pm28th of March 2025, 6:00amM8 WB Jct 18 off slip to Argyle St - Total closure
-
26th of March 2025, 8:00pm28th of March 2025, 6:00amM8 WB Jct 17 On slip - Total closure
-
26th of March 2025, 8:00pm28th of March 2025, 6:00amM8 WB Jct 17 to 18 - Lane closure
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amM73 Northbound Junction 1 to Junction 2 - Single lane running
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amM73 Northbound to M8 Westbound link road - Total closure
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amM73 Northbound Junction 2 off-slip - Total closure
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amA725 Southbound Orbiston on-slip - Total closure
-
26th of March 2025, 8:00pm27th of March 2025, 6:00amA8 Eastbound Junction 6a to Junction 6 Newhouse - Nearside lane closure
-
26th of March 2025, 8:00pm28th of March 2025, 6:00amM80 S/B between J3 Hornshill and J2 Robroyston - Lane Closure
-
27th of March 2025, 8:00am27th of March 2025, 6:00pmA87 Kensaleyre West of Portree WB - TTL
-
27th of March 2025, 8:00am27th of March 2025, 6:00pmA87 Kensaleyre West of Portree EB - TTL
-
27th of March 2025, 8:00am28th of March 2025, 6:00pmA82 Torvean SB - Road Closure
-
27th of March 2025, 8:00am28th of March 2025, 6:00pmA82 Torvean NB - Road Closure
-
27th of March 2025, 9:00am28th of March 2025, 11:59pmA85 Methven to Almondbank - Diversion Signage
-
27th of March 2025, 9:30am27th of March 2025, 3:30pmA77 SB Between Lendalfoot & North Ballantrae - Route Part of Diversion
-
27th of March 2025, 9:30am27th of March 2025, 3:30pmA77 NB Between Lendalfoot & North Ballantrae - Route Part of Diversion
-
27th of March 2025, 10:00am27th of March 2025, 11:30amA75 WB Between Jct B794 - B795 - Road Part of a Diversion Route
-
27th of March 2025, 10:00am27th of March 2025, 11:30amA75 EB Between Jct B795 - B794- Road Part of a Diversion Route
-
27th of March 2025, 7:30pm29th of March 2025, 6:30amA702 - SB - Abington - Closure
-
27th of March 2025, 7:30pm29th of March 2025, 6:30amA702 - NB - Abington - Closure
-
27th of March 2025, 7:30pm29th of March 2025, 6:30amM74 - NB - Jct 13 Offslip - Closure
-
27th of March 2025, 7:30pm29th of March 2025, 6:30amM74 - NB - Jct 13 Onslip - Closure
-
27th of March 2025, 7:30pm28th of March 2025, 6:30amM90/A9 Broxden- Lane Closure N/B
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA77 Overmills SB - TTL
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA77 Overmills NB- TTL
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA76 Mennock SB - TTLS
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA76 Mennock NB - TTLS
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA76 Newbridge SB - TTLS
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA76 Newbridge NB - TTLS
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amM73 Northbound Junction 2 to Junction 2a - Progressive Nearside & Offside lane closures
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA725 Southbound Shawhead to North road - Nearside lane closure
-
27th of March 2025, 8:00pm28th of March 2025, 6:00amA725 southbound North road - Total closure
-
28th of March 2025, 9:00am30th of March 2025, 6:00amA85 Methven EB - TTL
-
28th of March 2025, 9:00am30th of March 2025, 6:00amA85 Methven WB - TTL
-
28th of March 2025, 9:30am28th of March 2025, 3:30pmA90 Longforgan - Lane Closure N/B
-
28th of March 2025, 8:00pm29th of March 2025, 6:00amA720 - WB - Lothianburn on slip - Closure
-
28th of March 2025, 8:00pm29th of March 2025, 6:00amA720 - WB - Dreghorn off slip - Closure
-
28th of March 2025, 8:00pm29th of March 2025, 6:00amM73 Northbound Junction 2 to Junction 2a - Nearside lane closure
-
28th of March 2025, 8:00pm29th of March 2025, 6:00amA8 Westbound Junction 6 to Junction 6a - Offside lane closure
-
28th of March 2025, 8:00pm29th of March 2025, 6:00amA9 Inveralmond Roundabout- Lane Closure N/B
-
28th of March 2025, 8:00pm29th of March 2025, 6:00amA720 - WB - Lothianburn - Closure
-
28th of March 2025, 11:00pm31st of March 2025, 6:00amA76 SB Crosshands to Mauchline - Route part of Diversion
-
28th of March 2025, 11:00pm31st of March 2025, 6:00amA76 NB Crosshands to Mauchline - Route part of Diversion
-
30th of March 2025, 8:00am30th of March 2025, 4:00pmA78 NB Shore Rd, Meigle - TTL's
-
30th of March 2025, 8:00am30th of March 2025, 4:00pmA78 SB Shore Rd, Meigle - TTL's
-
30th of March 2025, 9:30am30th of March 2025, 3:30pmA77 Glengal SB - TTLS
-
30th of March 2025, 9:30am30th of March 2025, 3:30pmA77 Glengal NB - TTLS
-
30th of March 2025, 7:00pm1st of April 2025, 6:00amA889 Dalwhinnie Junction - Convoy Works
-
30th of March 2025, 7:30pm4th of April 2025, 6:30amA90 Lonmay to Cortes. N/B Road Closure
-
30th of March 2025, 7:30pm4th of April 2025, 6:30amA90 Cortes to Lonmay. Road Closure
-
30th of March 2025, 8:00pm21st of April 2025, 6:00amM8 J18 EB off slip to A82 Great Western Road - Total Closure
-
30th of March 2025, 8:00pm21st of April 2025, 6:00amM8 J18 EB off slip to A804 St Georges Road - Total closure
-
30th of March 2025, 8:00pm21st of April 2025, 6:00amM8 J18 EB on slip from Anderston - Total Closure
-
31st of March 2025, 12:01am1st of April 2025, 11:59pmA87 Loch Cluanie - Stop/Go Works
-
31st of March 2025, 7:00am4th of April 2025, 7:00pmA835 Cnoc Nan Cleireach West of Gorstan WB - TTL
-
31st of March 2025, 7:00am4th of April 2025, 7:00pmA835 Cnoc Nan Cleireach West of Gorstan EB - TTL
-
31st of March 2025, 7:00am18th of April 2025, 7:00pmA9 Dalnamein South of Drumochter SB - TTL
-
31st of March 2025, 7:00am18th of April 2025, 7:00pmA9 Dalnamein South of Drumochter NB - TTL
-
31st of March 2025, 8:00am8th of April 2025, 5:00pmA84 Buchany to Drumvaich North of Doune NB - TTL
-
31st of March 2025, 8:00am8th of April 2025, 5:00pmA84 Buchany to Drumvaich North of Doune SB - TTL
-
31st of March 2025, 8:00am4th of April 2025, 4:00pmA90 Stracathro to Keithock - Diversion Signing
-
31st of March 2025, 9:30am15th of May 2025, 3:30pmA82 NB Stirling Rd, Milton - Lane Closure
-
31st of March 2025, 9:30am13th of April 2025, 3:30pmA96 Huntly- TTL N/B
-
31st of March 2025, 9:30am2nd of April 2025, 3:30pmA95 Craigellachie- Stop/Go N/B
-
31st of March 2025, 9:30am31st of March 2025, 3:30pmA92 Freuchie- TTL N/B
-
31st of March 2025, 7:00pm2nd of May 2025, 7:00amA9 Skiach Services Alness NB - TTL
-
31st of March 2025, 7:00pm2nd of May 2025, 7:00amA9 Skiach Services Alness SB - TTL
-
31st of March 2025, 7:00pm5th of April 2025, 6:00amA9 Thurso NB - TTL
-
31st of March 2025, 7:00pm5th of April 2025, 6:00amA9 Thurso SB - TTL
-
31st of March 2025, 7:00pm2nd of April 2025, 7:00amA87 Broadford WB - Road Closure with Amnesties
-
31st of March 2025, 7:00pm2nd of April 2025, 7:00amA87 Broadford EB - Road Closure with Amnesties
-
31st of March 2025, 7:30pm12th of April 2025, 6:30amA90 Peterhead Bypass. N/B TTL's
-
31st of March 2025, 7:30pm5th of April 2025, 6:30amA90 Rait to Middlebank- Lane Closure N/B
-
31st of March 2025, 7:30pm5th of April 2025, 6:30amA90 Rait to Middlebank- Lane Closure S/B
-
31st of March 2025, 7:30pm4th of April 2025, 6:30amA96 West of Inverness Airport Rbt. W/B TTL's
-
31st of March 2025, 8:00pm2nd of April 2025, 6:00amA726 GSO - Philipshill roundabout EB lane closure
-
31st of March 2025, 8:00pm2nd of April 2025, 6:00amA726 Slip road approach OS lane closure
-
31st of March 2025, 8:00pm2nd of April 2025, 6:00amA726 GSO EB Approach OS lane closure
-
31st of March 2025, 8:00pm1st of April 2025, 6:00amA725 Southbound Raith off-slip - Total closure
-
31st of March 2025, 8:00pm7th of April 2025, 6:00amA85 Dunollie Rd Oban WB - Road Closure with Amnesties
-
31st of March 2025, 8:00pm7th of April 2025, 6:00amA85 Dunollie Rd Oban EB - Road Closure with Amnesties
-
31st of March 2025, 8:30pm12th of April 2025, 6:00amM8 Jct3 - Jct4 WB - Road Closure
-
31st of March 2025, 8:30pm12th of April 2025, 6:00amM8 Jct3A WB Onslip - Road Closure
-
31st of March 2025, 8:30pm8th of April 2025, 6:00amA720 - EB - Hermiston Onslip - Road Closure
-
31st of March 2025, 8:30pm8th of April 2025, 6:00amA720 - EB - Gogar to Calder Link - Road Closure
-
31st of March 2025, 8:30pm8th of April 2025, 6:00amA71 - EB - Calder Junction - Lane Closure
-
31st of March 2025, 9:00pm4th of April 2025, 5:00amA75 WB Carney Hill RIngford - Rolling TTLS
-
31st of March 2025, 9:00pm4th of April 2025, 5:00amA75 EB Carney Hill RIngford - Rolling TTLS
-
1st of April 2025, 6:00am7th of April 2025, 6:00pmA85 Strathearn Terrace to Coldwells Road Crieff - Diversion Signage
-
1st of April 2025, 6:00am31st of December 2025, 11:59pmM90 Friarton Bridge. N/B Various TM types
-
1st of April 2025, 6:00am31st of December 2025, 11:59pmM90 Friarton Bridge. S/B Various TM types
-
1st of April 2025, 6:00am2nd of April 2025, 3:00pmA8 WB Dalyrmple Street Greenock - Lane Closure
-
1st of April 2025, 8:00am1st of April 2025, 5:00pmA90 Keithock - Signage only N/B
-
1st of April 2025, 9:30am3rd of April 2025, 3:30pmA82 Inverarnan NB - TTL
-
1st of April 2025, 9:30am3rd of April 2025, 3:30pmA82 Inverarnan SB - TTL
-
1st of April 2025, 8:00pm3rd of April 2025, 6:00amA726 Queensway - West mains roundabout EB lane closure
-
1st of April 2025, 8:00pm3rd of April 2025, 6:00amA726 Queensway approach EB lane closure
-
1st of April 2025, 8:00pm3rd of April 2025, 6:00amA726 Queensway approach WB lane closure
-
1st of April 2025, 8:00pm2nd of April 2025, 6:00amA725 Southbound from Orbiston off-slip to Orbiston on-slip - Offside lane closure
-
1st of April 2025, 10:00pm2nd of April 2025, 6:00amA90 Stonehaven. N/B on slip closure
-
2nd of April 2025, 7:00pm5th of April 2025, 7:00amA87 Annishader East of Uig WB - Road Closure with Amnesties
-
2nd of April 2025, 7:00pm5th of April 2025, 7:00amA87 Annishader East of Uig EB - Road Closure with Amnesties
-
2nd of April 2025, 8:00pm4th of April 2025, 6:00amA727 South road - Carmunnock roundabout lane closure
-
2nd of April 2025, 8:00pm4th of April 2025, 6:00amA727 South road EB approach lane closure
-
2nd of April 2025, 8:00pm4th of April 2025, 6:00amA727 South road WB approach lane closure
-
2nd of April 2025, 8:00pm3rd of April 2025, 6:00amA8 Westbound Shawhead off-slip - Total closure
-
2nd of April 2025, 10:00pm3rd of April 2025, 6:00amA90 Stonehaven. S/B On slip closure
-
2nd of April 2025, 10:00pm3rd of April 2025, 6:00amA90 Stonehaven. Road closure S/B
-
3rd of April 2025, 9:30am3rd of April 2025, 3:30pmA83 Stonefield North of Tarbert NB - TTL
-
3rd of April 2025, 9:30am3rd of April 2025, 3:30pmA83 Stonefield North of Tarbert SB - TTL
-
3rd of April 2025, 8:00pm15th of April 2025, 6:00amM8 Jct 6 - Jct 5 EB road closure
-
3rd of April 2025, 8:00pm15th of April 2025, 6:00amM8 Jct 5 - Jct 6 Lane closure wb
-
4th of April 2025, 8:00am10th of April 2025, 5:00pmA8 WB East Hamilton Street -Lane Closure
-
4th of April 2025, 8:00am4th of April 2025, 5:30pmA9 Dunrobin North of Golspie NB - TTL
-
4th of April 2025, 8:00am4th of April 2025, 5:30pmA9 Dunrobin North of Golspie SB - TTL
-
4th of April 2025, 8:00pm5th of April 2025, 6:00amA8 Westbound Bargeddie Rbt to Swinton Rbt - Nearside lane closure
-
4th of April 2025, 8:00pm14th of April 2025, 6:00amM8 EB Jct 6 - Jct 5 Contraflow
-
4th of April 2025, 8:00pm14th of April 2025, 6:00amM8 WB Jct 6 - Jct 5 Contraflow
-
6th of April 2025, 7:30pm31st of May 2025, 6:30amA90 Glendoick Interchange. S/B Contraflow
-
7th of April 2025, 6:01am26th of April 2025, 7:29pmM80 - NB - Haggs to Bankhead - Hard Shoulder Closure
-
7th of April 2025, 6:01am25th of April 2025, 7:29pmM876 - NB - Bankhead - Hard Shoulder Closure
-
7th of April 2025, 7:00am30th of May 2025, 7:00pmA9 South if Bridge of Tacher Achavanich - Convoy Works
-
7th of April 2025, 8:00am18th of April 2025, 4:00pmA738 NB Stevenston Road @ Mcluckie Drive - TTLS
-
7th of April 2025, 8:00am18th of April 2025, 4:00pmA738 SB Stevenston Road @ Mcluckie Drive - TTLS
-
7th of April 2025, 9:00am11th of April 2025, 6:00pmA8 EB Rue End St to Newark Rbt - Route Part of Diversion
-
7th of April 2025, 9:00am11th of April 2025, 6:00pmA8 WB Rue End St to Newark Rbt - Route Part of Diversion
-
7th of April 2025, 9:30am7th of April 2025, 3:30pmA84 Corriechrombie North of Kilmahog NB - TTL
-
7th of April 2025, 9:30am7th of April 2025, 3:30pmA84 Corriechrombie North of Kilmahog SB - TTL
-
7th of April 2025, 9:30am11th of April 2025, 3:30pmA7 - S/B - Galalaw Roundabout - Temporary Traffic Lights
-
7th of April 2025, 9:30am11th of April 2025, 3:30pmA7 - N/B - Galalaw Roundabout - Temporary Traffic Lights
-
7th of April 2025, 7:00pm3rd of May 2025, 6:00amA82 Tarbet to Falls of Falloch NB - Road Closure with Amnesties
-
7th of April 2025, 7:00pm3rd of May 2025, 6:00amA82 Tarbet to Falls of Falloch SB - Road Closure with Amnesties
-
7th of April 2025, 7:00pm12th of April 2025, 7:00amA87 Breakish East of Broadford EB - Road Closure with Amnesties
-
7th of April 2025, 7:00pm12th of April 2025, 7:00amA87 Breakish East of Broadford WB - Road Closure with Amnesties
-
7th of April 2025, 7:30pm26th of April 2025, 6:00amM80 - NB - Bankhead - Lane Closure
-
7th of April 2025, 7:30pm26th of April 2025, 6:00amM80 - SB - Bankhead - Lane Closure
-
7th of April 2025, 7:30pm26th of April 2025, 6:00amM876 - SB - Bankhead - Lane Closure
-
7th of April 2025, 7:30pm9th of April 2025, 6:30amA9 Stockbridge on slip- Slip closure N/B
-
7th of April 2025, 7:30pm9th of April 2025, 6:30amA9 Stockbridge Lane closure N/B
-
7th of April 2025, 8:00pm12th of April 2025, 6:00amA77 Belffield IC Kilmarnock - SB - Closure
-
7th of April 2025, 8:00pm8th of April 2025, 6:00amM74 Jct 2 to Jct 1a NB- Road Closure
-
7th of April 2025, 8:00pm8th of April 2025, 6:00amM74 Jct 2 on slip NB- Road Closure
-
7th of April 2025, 8:00pm8th of April 2025, 6:00amM74 Jct 1a off slip NB- Slip Closure
-
7th of April 2025, 9:00pm2nd of May 2025, 6:00amA82 Great Western Rd @ Bowling SB - Lane Closure
-
7th of April 2025, 9:00pm2nd of May 2025, 6:00amA82 Dumbarton Rd @ Bowling NB - Lane Closure
-
7th of April 2025, 9:00pm2nd of May 2025, 6:00amA82 Great Western Rd @ Bowling NB - Lane Closure
-
7th of April 2025, 9:00pm2nd of May 2025, 6:00amA82 Dunglass Rbt NB - Lane Closure
-
7th of April 2025, 9:00pm2nd of May 2025, 6:00amA82 Dumbarton Rd SB - Lane Closure
-
7th of April 2025, 10:00pm12th of April 2025, 6:00amA86 East of Cluny Mains Balgowan EB - Road Closure with Amnesties
-
7th of April 2025, 10:00pm12th of April 2025, 6:00amA86 East of Cluny Mains Balgowan WB - Road Closure with Amnesties
-
8th of April 2025, 8:00am12th of April 2025, 5:00pmA90 South of Ellon - Diversion Signage
-
8th of April 2025, 8:00am28th of April 2025, 6:00pmA9 Ardullie Rnbt Cromarty Bridge - Signage
-
8th of April 2025, 9:30am8th of April 2025, 6:00pmA77 SB on Mainstreet, Ballantrae - TTL's
-
8th of April 2025, 9:30am8th of April 2025, 6:00pmA77 NB on Mainstreet, Ballantrae - TTL's
-
8th of April 2025, 8:00pm9th of April 2025, 6:00amM74 Jct 2 to Jct 2A SB - Road Closure
-
8th of April 2025, 8:00pm9th of April 2025, 6:00amM74 Jct 2 On Slip SB - Road Closure
-
8th of April 2025, 8:00pm9th of April 2025, 6:00amM74 Jct 2A Off Slip SB - Road Closure
-
8th of April 2025, 8:30pm12th of April 2025, 6:00amA720 - EB - Dreghorn - Closure
-
8th of April 2025, 8:30pm12th of April 2025, 6:00amA720 - EB - Dreghorn Slip - EB
-
8th of April 2025, 8:30pm12th of April 2025, 6:00amA720 - EB - Lothianburn off slip - closure
-
9th of April 2025, 9:30am30th of April 2025, 3:30pmA9 Bankfoot to Dowally North of Dunkeld NB - Diversion Signage
-
9th of April 2025, 9:30am30th of April 2025, 3:30pmA9 Bankfoot to Dowally North of Dunkeld SB - Diversion Signage
-
9th of April 2025, 8:00pm10th of April 2025, 6:00amM74 Jct 2A - Jct 2 NB - Road Closure
-
9th of April 2025, 8:00pm10th of April 2025, 6:00amM74 Jct 2 Off Slip NB - Slip Closure
-
9th of April 2025, 8:00pm10th of April 2025, 6:00amM74 Jct 2A On Slip - Slip Closure
-
10th of April 2025, 8:00am10th of April 2025, 5:00pmA9 Dunkeld to Ballinluig NB - Diversion Signage
-
10th of April 2025, 8:00am10th of April 2025, 5:00pmA9 Dunkeld to Ballinluig SB - Diversion Signage
-
10th of April 2025, 8:00pm11th of April 2025, 6:00amM8 Jct 11 to Jct 10 EB - Road Closure
-
10th of April 2025, 8:00pm11th of April 2025, 6:00amM8 Jct 11 on slip EB - Slip Closure
-
10th of April 2025, 8:00pm11th of April 2025, 6:00amM8 Jct 10 off slip EB- Slip Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM8 21 Sec C/Way East Link to Jct 21 On Slip WB - Slip Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM8 Jct 21 On Slip WB - Slip Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM8 Jct 21 to Jct 22 Sec C/Way WB - Lane Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM8 Jct 22 Sec/C/Way to M77 SB WB - Slip Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM8 Jct 22 to M77 SB - Slip Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM77 Jct 1 Off Slip SB - Slip Closure
-
11th of April 2025, 8:00pm12th of April 2025, 6:00amM77 Jct 1 On Slip SB - Slip Closure
-
12th of April 2025, 2:30pm12th of April 2025, 3:30pmA83 Campbeltown - Event
-
13th of April 2025, 7:30pm14th of April 2025, 6:30amA972 Kingsway-Scott Fyffe Roundabout- Road Closure S/B
-
13th of April 2025, 8:00pm14th of April 2025, 6:00amM77 link to M8 sec c/way NB- Slip Closure
-
13th of April 2025, 8:00pm14th of April 2025, 6:00amM77 NB Jct 1 - Road Closure
-
13th of April 2025, 8:00pm14th of April 2025, 6:00amM77 NB Jct1 On Slip - Slip Closure
-
13th of April 2025, 8:00pm14th of April 2025, 6:00amM77 link to M8 NB - Road Closure
-
14th of April 2025, 9:30am14th of April 2025, 3:30pmA83 Furnace NB - TTL
-
14th of April 2025, 9:30am14th of April 2025, 3:30pmA83 Furnace SB - TTL
-
14th of April 2025, 7:30pm15th of April 2025, 6:30amA92 Scott Fyffe Roundabout- Road Closure S/B
-
14th of April 2025, 7:30pm15th of April 2025, 6:30amA972 Kingsway-Scott Fyffe Roundabout- Road Closure S/B
-
14th of April 2025, 7:30pm15th of April 2025, 6:30amA92 Greendykes-Scott Fyffe Roundabout- Road Closure S/B
-
14th of April 2025, 7:30pm15th of April 2025, 6:30amA92 Greendykes-Scott Fyffe Roundabout- Road Closure N/B
-
15th of April 2025, 8:00pm16th of April 2025, 6:00amA720 - WB - Calder to Gogar Link Road - closure
-
16th of April 2025, 8:00pm17th of April 2025, 6:00amA720 - EB - Gogar to Calder Link Road - Closure
-
16th of April 2025, 8:00pm17th of April 2025, 6:00amA720 - EB - Gogar to Calder - Lane Closure
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 5 On-Slip Eastbound
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Mainline Carriageway from Jct 5 to Jct 1A Eastbound
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 4 Off-Slip EB
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 4 On-Slip EB
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 3 On-Slip EB
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 2 Off-Slip EB
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 1B Off-Slip EB
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 1B On-Slip EB
-
17th of April 2025, 7:30pm18th of April 2025, 6:00amM9 Junction 1A Off-Slip EB
-
17th of April 2025, 8:00pm21st of April 2025, 6:00amA720 - EB - Hermiston  to Dreghorn - Closure
-
21st of April 2025, 8:00pm22nd of April 2025, 6:00amA720- EB- Dreghorn - Lothianburn- Closure
-
23rd of April 2025, 8:00pm26th of April 2025, 6:00amA702 - EB - Straiton to Sheriffhall Rbt - Closure
-
28th of April 2025, 8:00am9th of May 2025, 6:00pmA830 East of Glenfinnan WB - TTL
-
28th of April 2025, 8:00am9th of May 2025, 6:00pmA830 East of Glenfinnan EB - TTL
-
1st of May 2025, 7:30pm31st of May 2025, 6:30amA96 East of Oyne Fork Jct. W/B Road closure
-
1st of May 2025, 7:30pm31st of May 2025, 6:30amA96 East of Oyne Fork Jct. E/B Road closure
-
5th of May 2025, 8:00pm10th of May 2025, 6:00amM9 - NB - Jct 3 to Jct 4 - Hard shoulder closure
-
8th of May 2025, 6:00pm10th of May 2025, 6:00amA96 Westbound after Craibstone roundabout
-
8th of May 2025, 6:00pm10th of May 2025, 6:00amA96 Eastbound heading towards Craibstone roundabout.
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 WB - M8 J31 to Woodhall Rbt - Lane Closures
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amM8 WB onslip from J31 - Lane Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 WB Greenock Road Woodhall Rbt to Newark Rbt - Road Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 WB, Parklea Rd on slip - Slip Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 WB, Parklea Rd off slip - Slip Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 B789 WB Langbank off slip -Slip Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 WB Langbank on slip - Slip Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 EB Greenock Road - Newark Rbt to Woodhall Rbt - Road closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amA8 EB Greenock Road - Woodhall Rbt to West Ferry IC - Lane Closure
-
9th of May 2025, 8:00pm10th of May 2025, 6:00amM8 EB - JCT 31 off slip - lane closures
-
12th of May 2025, 11:00pm13th of May 2025, 5:00amM90 Jcn9 Off slip Road closure S/B
-
13th of May 2025, 7:30pm20th of May 2025, 6:00amM9 - NB - Prior to Junction 5 - Full Closure
-
13th of May 2025, 7:30pm20th of May 2025, 6:00amM9 - NB - Junction 4 Onslip - Slip Closure
-
13th of May 2025, 7:30pm20th of May 2025, 6:00amM9 - NB - Junction 5 Offslip - Slip Closure
-
13th of May 2025, 7:30pm15th of May 2025, 6:00amA1 - NB - North of Spott RBT - NB Closure
-
14th of May 2025, 9:30am20th of June 2025, 3:30pmA96 Inveramsay WB - Temporary traffic signals
-
14th of May 2025, 7:30pm15th of May 2025, 6:30amM90 J6 Kinross. N/B off slip closure
-
19th of May 2025, 7:00am2nd of June 2025, 7:00pmA9 Allt Chluain Blair Atholl SB - TTL
-
26th of May 2025, 8:30pm4th of June 2025, 6:00amA720 - EB - Gogar to Calder - Road Closure
-
26th of May 2025, 8:30pm4th of June 2025, 6:00amA720 - EB - Gogar to Hermiston Gait Roundabout - Road Closure
-
26th of May 2025, 8:30pm4th of June 2025, 6:00amA720 - EB - Hermiston Gait Roundabout to Calder Roundabout - Road Closure
-
27th of May 2025, 8:00pm28th of May 2025, 6:00amM74 NB J2 off slip - Slip Closure
-
30th of May 2025, 8:00pm31st of May 2025, 6:00amM74 SB J8 to J10 - Road Closure
-
2nd of June 2025, 7:00am1st of August 2025, 7:00pmA889 Dochaid Abhacain Dalwhinnie - TTL
-
5th of June 2025, 8:00pm7th of June 2025, 6:00amM90 - SB - Junction 3 SB Offslip - Road Closure
-
5th of June 2025, 8:00pm7th of June 2025, 6:00amM90 - SB - Mainline from Jct 3 to Junction 2A - Road Closure
-
25th of June 2025, 7:30pm27th of June 2025, 6:00amM9 - NB - Jct 10 - Jct 11 - Closure
-
30th of June 2025, 8:30pm2nd of July 2025, 6:00amM8 - EB - Jct 4 to 3a - Road closure
-
30th of June 2025, 8:30pm2nd of July 2025, 6:00amM8 - EB - Jct 4 on slip - Road closure
-
30th of June 2025, 8:30pm2nd of July 2025, 6:00amM8 - EB - Jct 3a off slip - Road closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 24 to Jct 22 - Lane Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 24 on slip from Helen Street - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 23 on slip from Dumbreck Road - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 22 to M74 Jct 1 - Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 22 to Jct 20 - Lane 1 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 EB Jct 22 off slip Seaward St - Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 22 Seward Street- Slip Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 22 link Road to M77 Merge - Lane 1 Closure
-
2nd of July 2025, 8:00pm3rd of July 2025, 6:00amM8 WB Jct 26 on slip from Hillington IC - Slip Closure
-
23rd of July 2025, 8:00pm26th of July 2025, 6:00amM90 - SB - Jct 3 to Jct 2 - Road Closure
-
23rd of July 2025, 8:00pm26th of July 2025, 6:00amM90 - SB - Jct 3 on slip - Road Closure
-
23rd of July 2025, 8:00pm26th of July 2025, 6:00amM90 - SB - A92 on slip - Road Closure
-
23rd of July 2025, 8:00pm26th of July 2025, 6:00amM90 - SB - Jct 2 off slip - Road Closure
-
11th of August 2025, 8:00pm12th of August 2025, 6:00amA82 NB Stirling Road Greenhead Road - Round Riding Road- Lane Closures
-
12th of August 2025, 8:00pm14th of August 2025, 6:00amA82 SB Stirling Road - Round Riding Road - Greenhead Road - Lane Closures
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 WB J15 on slip from Springburn Expressway - Slip Closure
-
1st of September 2025, 8:00pm2nd of September 2025, 6:00amM8 WB J15 to J16 - Lane Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 4 off-slip . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 3 off-slip . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1A off-slip. Closure.
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM90 SB Jct 1 to M9 Jct 1A WB. Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1B off-slip. Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1A to Jct 4 . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 1B on-slip . Closure
-
2nd of September 2025, 8:00pm5th of September 2025, 6:00amM9 WB Jct 2 on-slip . Closure
-
23rd of September 2025, 8:00pm25th of September 2025, 6:00amM9 EB Jct 11 to Jct 10 Closure.
-
23rd of September 2025, 8:00pm25th of September 2025, 6:00amM9 EB Jct 11 to Jct 10 Closure.
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM8 EB Approach to Kingston Br - Lane Closures
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM8 WB on to Kingston Br - Lane Closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM74 SB J1 off slip - Lane Closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM8 Hillington Rbt inner - lane closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM74 Jct 1 SB-Lane 2 closure
-
23rd of September 2025, 8:00pm24th of September 2025, 6:00amM74 Jct 1 NB-Lane 2 closure
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 10 to Jct 9 Closure.
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 10 on slip Closure.
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 9 off slip Closure.
-
25th of September 2025, 8:00pm27th of September 2025, 6:00amM9 EB Jct 9 off slip to M80 Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM9 EB Jct 9 to Jct 7 Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM9 EB Jct 9 on slip Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM876 EB Jct 2 to M9 merge Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM876 EB M9 merge to jct 3 Closure.
-
29th of September 2025, 8:00pm2nd of October 2025, 6:00amM876 EB jct 3 off slip Closure.
-
1st of October 2025, 7:00pm3rd of October 2025, 7:00amA87 Cluanie Inn Glen Moriston EB - Road Closure with Amnesties
-
1st of October 2025, 7:30pm7th of October 2025, 6:00amM9 Junction 1B On-Slip Eastbound
-
1st of October 2025, 7:30pm7th of October 2025, 6:00amM9 Junction 1B to Junction 1A Eastbound
-
1st of October 2025, 7:30pm7th of October 2025, 6:00amM9 Junction Junction 1A Off-Slip Eastbound
-
2nd of October 2025, 7:00pm3rd of October 2025, 7:00amA87 Cluanie Inn Glen Moriston WB - Road Closure with Amnesties
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 5 to Jct 2. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 5 on-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 4 off-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 4 off-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct 3 on-slip. Road Closure.
-
8th of October 2025, 8:00pm9th of October 2025, 6:00amM9 EB Jct off-slip. Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 2 to 1A Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 1B off slip Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 1B on slip Road Closure.
-
13th of October 2025, 8:00pm15th of October 2025, 6:00amM9 EB Jct 1A off slip Road Closure.
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM9 EB Jct 1A to 1 Road Closure.
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM9 EB Queensferry to jct 1A Road Closure.
-
15th of October 2025, 8:00pm16th of October 2025, 6:00amM9 EB Jct 1 off slip Road Closure.
-
20th of October 2025, 8:30pm24th of October 2025, 6:00amM8 Junction 4 On-Slip Westbound
-
20th of October 2025, 8:30pm24th of October 2025, 6:00amM8 Junction 4 to Junction 4A Mainline Carriageway Westbound
-
20th of October 2025, 8:30pm24th of October 2025, 6:00amM8 Junction 4A Off-Slip Westbound
Local roadworks
The Traffic Scotland Service does not cover local roads. These are managed and maintained by local authorities.
Visit The Road Works Scotland website for information on local roads. The website provides information on all programmed and emergency works carried out by utility companies, construction companies, and the local authority on local roads.